• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Master's Dissertation
DOI
https://doi.org/10.11606/D.3.2020.tde-07032023-111638
Document
Author
Full name
Luiz Eduardo Campos Pignatari
E-mail
Institute/School/College
Knowledge Area
Date of Defense
Published
São Paulo, 2020
Supervisor
Committee
Chieregati, Ana Carolina (President)
Bortoleto, Daniel Armelim
Cremonese, Dennis Travagini
Title in Portuguese
Operacionalização dos recursos, reservas e reconciliação em uma mina de ouro com mineralização em veios estreitos.
Keywords in Portuguese
Ouro
Reconciliação
Recursos minerais
Reserva mineral
Veios estreitos
Abstract in Portuguese
Com o aumento significativo do preço internacional do ouro, a partir de 2003, grande número de projetos com mineralização em veios estreitos foram concebidos e implantados, por vezes sem uma interpretação adequada dos indicadores tecnológicos de lavra em minas subterrâneas. As dificuldades operacionais da sondagem do corpo mineral em grandes profundidades implicam em reduzido conhecimento da mineralização e baixa assertividade na produção, com elevado nível de imprecisão e diluição. Estas avaliações preliminares e pouco detalhadas ocasionaram o insucesso de inúmeros projetos no Brasil e no mundo, resultantes das imprevisibilidades quando os corpos minerais foram lavrados, com as premissas incorretas adotadas na conversão dos recursos em reservas, com a inadequada definição dos métodos de lavra e inserção dos demais fatores modificadores. A pesquisa realizada neste projeto foi desenvolvida em uma mina subterrânea localizada no sudoeste do Mato Grosso e conhecida como Pau a Pique. Após um início de operação muito difícil em 2011, a operação desenvolveu trabalhos voltados para a evolução do conhecimento da jazida e, mesmo com a paralização da empresa em final de 2014 e com a venda do projeto e posterior retomada em 2017, atingiu uma operação superavitária, com um programa de produção viável para o triênio de 2018 a 2020,o que foi demostrado por meio dos resultados reconciliados na operação da mina em 2018 e 2019, bem como na análise do orçamento de produção e custos de 2020. Comprovou-se que somente é possível operacionalizar o recurso mineral e torná-lo mais representativo, se o conhecimento do comportamento do corpo mineral in loco for incrementado, através do desenvolvimento de diversas técnicas para melhoria da qualidade da informação para tomada de decisões estratégicas. O objetivo principal deste trabalho foi estabelecer uma sequência de estudos para adensar o conhecimento sobre o maciço rochoso, a mineralização, o comportamento estrutural e geotécnico, os procedimentos de amostragem e demais aspectos tecnológicos. Para tanto, foi proposta a implantação de um sistema de planejamento e operação da mina subterrânea, com a revisão dos modelos de médio e curto prazos, dos desenhos dos realces, das diluições planejadas e operacionais, do sequenciamento da mina e da reconciliação da operação, baseado em amostragem sistemática e criteriosa das galerias de desenvolvimento, com definição da massa mínima representativa de amostras e otimização do protocolo de preparação de amostras no laboratório. Quanto ao planejamento da mina, este trabalho propõe uma sequência para a elaboração dos modelos de longo e médio prazo e para o modelo de curto prazo, com uso de um sólido operacionalizado para cada modelo, que será a base da operação e reconciliação da produção da mina. O resultado efetivo do trabalho proposto é aumentar a segurança durante o processo produtivo, para reduzir ao mínimo a diluição planejada e operacional, além de garantir aderência ao orçamento da mina.
Title in English
Operationalization of resources, reserves and recontiliation on gold mines with narrow veins mineralization.
Keywords in English
Gold
Mineral reserves
Mineral resources
Narrow veins
Operationalization
Reconciliation
Abstract in English
With the significant increase in the international gold price since 2003, a large number of narrow-vein mineralization projects have been designed and implemented, sometimes without proper interpretation of the underground mine technology indicators. The operational difficulties of drilling the mineral body at great depths imply low knowledge of mineralization and low production assertiveness, with high level of inaccuracy and dilution. These preliminary and inaccurate assessments have led to the failure of numerous projects in Brazil and around the world, resulting from unpredictability when mineral bodies were mined, with incorrect assumptions made in converting resources into reserves, and with inadequate definition of mining methods and other modifying factors insertion. The research in this project was carried out at an underground mine located in southwestern Mato Grosso and known as Pau a Pique. After a very difficult start-up in 2011, the operation carried out work focused on the evolution of the deposit knowledge and, even with the company's shutdown in late 2014 and the sale of the project and subsequent resumption in 2017, reached a surplus operation, with a viable production program for the triennium from 2018 to 2020, which was demonstrated through the reconciled results of the mine's operation in 2018 and 2019, as well as the analysis of the 2020 production budget and costs. It was proved that it is only be possible to operationalize the mineral resource and make it more representative, if the knowledge of the mineral body's behavior in loco is increased, through the development of several techniques to improve the quality of information for strategic decision making. The main objective of this work was to establish a sequence of studies to increase knowledge about the rock mass, mineralization, structural and geotechnical behavior, sampling procedures and other technological aspects. To this end, it was proposed to implement an underground mine planning and operation system, reviewing medium and short term models, stope drawings, planned and operational dilutions, mine sequencing and operation reconciliation, based on systematic and judicious sampling of the development galleries, defining the minimum representative mass of samples and optimizing the sample preparation protocol in the laboratory. As for mine planning, a sequence for the long and medium-term models and for the short-term model elaboration was proposed, using an operationalized solid for each model, which will be the basis for the mine's operation and production reconciliation. The effective result of the proposed work is to increase assertiveness during the production process, minimizing planned and operational dilution and ensuring adherence to the mine budget.
 
WARNING - Viewing this document is conditioned on your acceptance of the following terms of use:
This document is only for private use for research and teaching activities. Reproduction for commercial use is forbidden. This rights cover the whole data about this document as well as its contents. Any uses or copies of this document in whole or in part must include the author's name.
Publishing Date
2023-03-07
 
WARNING: Learn what derived works are clicking here.
All rights of the thesis/dissertation are from the authors
CeTI-SC/STI
Digital Library of Theses and Dissertations of USP. Copyright © 2001-2024. All rights reserved.