Dissertação de Mestrado
DOI
https://doi.org/10.11606/D.3.2007.tde-27072007-152858
Documento
Autor
Nome completo
Carlos Augusto Dornellas do Nascimento
E-mail
Unidade da USP
Área do Conhecimento
Data de Defesa
Imprenta
São Paulo, 2007
Orientador
Banca examinadora
Andrade, Bernardo Luís Rodrigues de (Presidente)
Biazzi, Jorge Luiz de
Sabbag, Paulo Yazigi
Título em português
Gerenciamento de prazos: uma revisão crítica das técnicas em uso em empreendimentos em regime EPC.
Palavras-chave em português
Administração de projetos
Gestão de prazos
Método da corrente crítica
Método de Monte Carlo
Método do caminho crítico
Resumo em português
O segmento de Consultoria em Engenharia, ao lado das Universidades e Centros de Pesquisas, é um dos pilares do desenvolvimento científico-tecnológico do país e é considerado um dos responsáveis pela otimização de investimentos, redução dos prazos e dos custos de implantação de empreendimentos públicos e privados, industrial ou de infra-estrutura. Atualmente, esses empreendimentos vêm passando por modificações significativas, exigindo cada vez um melhor desempenho de seus contratados, tanto nos aspectos de qualidade, desempenho, prazo e custos, quanto nos aspectos associados aos riscos contratuais, pois tornaram -se freqüentes contratações nas modalidades EPC (engineering, procurement, construction) e "turn-key". Neste novo cenário, as organizações precisam ser mais competitivas para sobreviverem às condições impostas pelo mercado, e, neste novo contexto, o gerenciamento de prazos tem-se tornado um fator crítico de sucesso. Esta dissertação desenvolve uma extensa revisão das técnicas de gerenciamento de prazos, com ênfase na etapa de programação, e uma análise comparativa das principais técnicas utilizadas no gerenciamento de projetos. Para isto, tomou-se como referência o caso de um projeto real, contratado mediante a modalidade EPC, em desenvolvimento por uma Empresa de Consultoria em Engenharia. Foi realizada a comparação entre os Métodos do Caminho Crítico, Corrente Crítica, Análises Probabilísticas e de Monte Carlo, abordando a aplicabilidade dessas técnicas neste caso. Ao final é feita uma síntese dos principais resultados alcançados, bem como dos requisitos demandados na aplicação de cada uma destas técnicas.
Título em inglês
Time management: a critical review of the techniques used in EPC projects.
Palavras-chave em inglês
Project management
The critical chain method
The critical path method
The Monte Carlo method
Time management
Resumo em inglês
The segment of Consultancy in Engineering, as well as the Universities and the Research Centers are some of the pillars of the scientific -technological development in the country and they have been responsible for optimizing the investments, reducing the deadlines and the costs of project implementation in the public and private sectors, along with the industrial and infra-structure sectors. Nowadays, these projects have been going through major changes, which have demanded better performances from those who are contracted, in areas such as the quality control, performa nces, time and costs, as well as the contract risks, which more often than ever, have fallen into the EPC category (engineering, procurement, and construction) and the 'turn-key' category. In this new scenario, companies need to be more competitive to live through the conditions imposed by the market, and, in this new context, time management has turned into a critical success factor. This dissertation develops an extensive review of the time management techniques focusing on scheduling and also a comparative analysis of the most important techniques used in Project Management. To do that, a real project was created as reference case in which the EPC category was defined and was developed by an Engineering Consultancy. A comparison among The Critical Path Method and The Critical Chain, Probability Analysis Method and The Monte Carlo Method was made, and it approached the applicability of these techniques in this case. At the end, there is a summary of the most important outcomes, as well as the necessary conditions to apply each of these techniques.
 
AVISO - A consulta a este documento fica condicionada na aceitação das seguintes condições de uso:
Este trabalho é somente para uso privado de atividades de pesquisa e ensino. Não é autorizada sua reprodução para quaisquer fins lucrativos. Esta reserva de direitos abrange a todos os dados do documento bem como seu conteúdo. Na utilização ou citação de partes do documento é obrigatório mencionar nome da pessoa autora do trabalho.
Data de Publicação
2007-08-24
 
AVISO: Saiba o que são os trabalhos decorrentes clicando aqui.
Todos os direitos da tese/dissertação são de seus autores
CeTI-SC/STI
Biblioteca Digital de Teses e Dissertações da USP. Copyright © 2001-2024. Todos os direitos reservados.