• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Mémoire de Maîtrise
DOI
https://doi.org/10.11606/D.85.2023.tde-06102023-142525
Document
Auteur
Nom complet
Jerônimo Moraes Gomes
Adresse Mail
Unité de l'USP
Domain de Connaissance
Date de Soutenance
Editeur
São Paulo, 2023
Directeur
Jury
Mattar Neto, Miguel (Président)
Martins, Marcelo Ramos
Melo, Paulo Fernando Ferreira Frutuoso e
Titre en portugais
Desenvolvimento do Programa da Garantia da Confiabilidade em uma planta nuclear brasileira subsidiado por um modelo de Confiabilidade, Disponibilidade e Manutenibilidade 
Mots-clés en portugais
Confiabilidade, Disponibilidade e Manutenibilidade
planta nuclear brasileira
Programa de Garantia da Confiabilidade
Resumé en portugais
O principal objetivo deste trabalho é implementar de uma metodologia para o desenvolvimento de um Programa de Garantia da Confiabilidade (PGC) específico para uma instalação nuclear experimental PWR em implantação no Brasil, através da análise da instalação experimental e do desenvolvimento de um PGC preliminar subsidiado por um modelo de Confiabilidade, Disponibilidade e Manutenibilidade (RAM, do inglês Reliability, Availability and Maintainability). Para isso, é realizada uma ampla pesquisa bibliográfica nos bancos de dados da área nuclear disponíveis, além do estudo de uma avaliação realizada no sistema de remoção de calor de decaimento de longo prazo durante uma parada para reabastecimento da planta experimental estudada, cujos dados foram usados para aplicação do PGC. Os passos necessários para aplicação do PGC desenvolvido são seguidos, usando-se os dados da avaliação do sistema da planta estudada, resultando em uma lista de componentes de risco significativo para o PGC, que têm uma influência importante no potencial de garantia de segurança, para os quais o objetivo do PGC deve ser garantir que o risco não aumente e proteger contra a deterioração do desempenho (manutenção e capacidade de manutenção aprimoradas e tempo fora de serviço minimizado). Destes últimos, foram identificados os que têm uma influência importante também no potencial de redução de risco, sendo que o objetivo do PGC para eles deve ser tornar o risco presente menor e receber a maior atenção na busca de possíveis melhorias.
Titre en anglais
Development of the Reliability Assurance Program for a Brazilian nuclear power plant subsidized by a Reliability, Availability and Maintainability model
Mots-clés en anglais
Brazilian nuclear power plant
Reliability Assurance Program
Reliability, Availability and Maintainability
Resumé en anglais
The main purpose of this work is to present a methodology for the development of a Reliability Assurance Program (PGC) specific for a PWR experimental nuclear installation under implementation in Brazil, through the analysis of the experimental facility and the development of a preliminary PGC subsidized by a Reliability, Availability and Maintainability (RAM) model. For this, an extensive bibliographical research is carried out in the available nuclear area databases, in addition to the study of an evaluation carried out in the long-term decay heat removal system during a tire refueling of the studied experimental plant, whose data were used for application of the PGC. The necessary steps for applying the developed PGC are followed, using data from the system assessment of the studied plant, resulting in a list of components of significant risk for the PGC, which have an important influence on the safety guarantee potential, to which the objective of the PGC should be to ensure that risk does not increase and to protect against performance deterioration (improved maintainability and serviceability and minimized out-of-service time). Of the latter, those that also have an important influence on the risk reduction potential were identified, and the objective of the PGC for them should be to make the present risk smaller and receive the greatest attention in the search for possible improvements.
 
AVERTISSEMENT - Regarde ce document est soumise à votre acceptation des conditions d'utilisation suivantes:
Ce document est uniquement à des fins privées pour la recherche et l'enseignement. Reproduction à des fins commerciales est interdite. Cette droits couvrent l'ensemble des données sur ce document ainsi que son contenu. Toute utilisation ou de copie de ce document, en totalité ou en partie, doit inclure le nom de l'auteur.
Date de Publication
2023-11-14
 
AVERTISSEMENT: Apprenez ce que sont des œvres dérivées cliquant ici.
Tous droits de la thèse/dissertation appartiennent aux auteurs
CeTI-SC/STI
Bibliothèque Numérique de Thèses et Mémoires de l'USP. Copyright © 2001-2024. Tous droits réservés.