• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Master's Dissertation
DOI
https://doi.org/10.11606/D.85.2023.tde-06102023-142525
Document
Author
Full name
Jerônimo Moraes Gomes
E-mail
Institute/School/College
Knowledge Area
Date of Defense
Published
São Paulo, 2023
Supervisor
Committee
Mattar Neto, Miguel (President)
Martins, Marcelo Ramos
Melo, Paulo Fernando Ferreira Frutuoso e
Title in Portuguese
Desenvolvimento do Programa da Garantia da Confiabilidade em uma planta nuclear brasileira subsidiado por um modelo de Confiabilidade, Disponibilidade e Manutenibilidade 
Keywords in Portuguese
Confiabilidade, Disponibilidade e Manutenibilidade
planta nuclear brasileira
Programa de Garantia da Confiabilidade
Abstract in Portuguese
O principal objetivo deste trabalho é implementar de uma metodologia para o desenvolvimento de um Programa de Garantia da Confiabilidade (PGC) específico para uma instalação nuclear experimental PWR em implantação no Brasil, através da análise da instalação experimental e do desenvolvimento de um PGC preliminar subsidiado por um modelo de Confiabilidade, Disponibilidade e Manutenibilidade (RAM, do inglês Reliability, Availability and Maintainability). Para isso, é realizada uma ampla pesquisa bibliográfica nos bancos de dados da área nuclear disponíveis, além do estudo de uma avaliação realizada no sistema de remoção de calor de decaimento de longo prazo durante uma parada para reabastecimento da planta experimental estudada, cujos dados foram usados para aplicação do PGC. Os passos necessários para aplicação do PGC desenvolvido são seguidos, usando-se os dados da avaliação do sistema da planta estudada, resultando em uma lista de componentes de risco significativo para o PGC, que têm uma influência importante no potencial de garantia de segurança, para os quais o objetivo do PGC deve ser garantir que o risco não aumente e proteger contra a deterioração do desempenho (manutenção e capacidade de manutenção aprimoradas e tempo fora de serviço minimizado). Destes últimos, foram identificados os que têm uma influência importante também no potencial de redução de risco, sendo que o objetivo do PGC para eles deve ser tornar o risco presente menor e receber a maior atenção na busca de possíveis melhorias.
Title in English
Development of the Reliability Assurance Program for a Brazilian nuclear power plant subsidized by a Reliability, Availability and Maintainability model
Keywords in English
Brazilian nuclear power plant
Reliability Assurance Program
Reliability, Availability and Maintainability
Abstract in English
The main purpose of this work is to present a methodology for the development of a Reliability Assurance Program (PGC) specific for a PWR experimental nuclear installation under implementation in Brazil, through the analysis of the experimental facility and the development of a preliminary PGC subsidized by a Reliability, Availability and Maintainability (RAM) model. For this, an extensive bibliographical research is carried out in the available nuclear area databases, in addition to the study of an evaluation carried out in the long-term decay heat removal system during a tire refueling of the studied experimental plant, whose data were used for application of the PGC. The necessary steps for applying the developed PGC are followed, using data from the system assessment of the studied plant, resulting in a list of components of significant risk for the PGC, which have an important influence on the safety guarantee potential, to which the objective of the PGC should be to ensure that risk does not increase and to protect against performance deterioration (improved maintainability and serviceability and minimized out-of-service time). Of the latter, those that also have an important influence on the risk reduction potential were identified, and the objective of the PGC for them should be to make the present risk smaller and receive the greatest attention in the search for possible improvements.
 
WARNING - Viewing this document is conditioned on your acceptance of the following terms of use:
This document is only for private use for research and teaching activities. Reproduction for commercial use is forbidden. This rights cover the whole data about this document as well as its contents. Any uses or copies of this document in whole or in part must include the author's name.
Publishing Date
2023-11-14
 
WARNING: Learn what derived works are clicking here.
All rights of the thesis/dissertation are from the authors
CeTI-SC/STI
Digital Library of Theses and Dissertations of USP. Copyright © 2001-2024. All rights reserved.