• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Tesis Doctoral
DOI
https://doi.org/10.11606/T.8.2022.tde-06022023-113653
Documento
Autor
Nombre completo
Michelle Sena da Silva
Dirección Electrónica
Instituto/Escuela/Facultad
Área de Conocimiento
Fecha de Defensa
Publicación
São Paulo, 2022
Director
Tribunal
Lencioni, Sandra (Presidente)
Rocha, Gilberto de Miranda
Théry, Hervé Émilien René
Trindade Junior, Saint-Clair Cordeiro da
Título en portugués
O projeto hidrelétrico de Belo Monte: complexidade e particularidades da reestruturação regional
Palabras clave en portugués
Belo Monte
Desenvolvimento regional
Hidrelétrica
Reestruturação regional
Resumen en portugués
Considerando que a relação da implantação da Hidrelétrica de Belo Monte com a sua região de abrangência desenvolveu uma reestruturação regional da mesma forma que outras experiências de implantação de hidrelétricas na Amazônia, o questionamento que norteia esta pesquisa é: em que consiste a complexidade (gênese do processo na década de 1970, redefinição do projeto com inovação tecnológica e mudança na configuração espacial da área atingida) e as particularidades (operação à fio d'água, planos de desenvolvimento e inserção regional e comitê gestor do desenvolvimento regional) deste processo? Para a compreensão desta problemática objetiva-se compreender a relação estabelecida entre o projeto de implantação da Hidrelétrica de Belo Monte e a sua região de abrangência, evidenciando a complexidade e particularidades do processo de reestruturação regional. Desse modo, observa-se que a partir da relação estabelecida entre a implantação de Belo Monte e sua região de abrangência se desenvolveu uma reestruturação regional com amplas características que a identificam como perversa, no momento em que se constituiu como um projeto inovador no que diz respeito a responsabilidade com o pretenso desenvolvimento regional, o que permite concluir que as transformações ocasionadas acirrou a desestruturação de atividades econômicas tradicionais ao criar novas formas de uso e ocupação na região de abrangência, que servem para a sustentação das necessidades da usina e secundarizam os interesses dos agentes regionais. E desta forma, consolidou um modelo de concentração de renda, mesmo com os instrumentos normativos inovadores que direcionariam as intervenções para a materialização do desenvolvimento regional mais equânime.
Título en inglés
The Belo Monte hydroelectric project: complexity and particularities of regional restructuring
Palabras clave en inglés
Belo Monte
Hydroelectric power plant
Regional development
Regional restructuring
Resumen en inglés
Considering that the relationship between the construction of the Belo Monte Hydroelectric Power Plant and its region of influence developed a regional restructuring in the same way as other experiences of construction of hydroelectric power plants in the Amazon region, the question that guides this research is: what are the complexity (genesis of the process in the 1970s, redefinition of the project with technological innovation and change in the spatial configuration of the affected area) and the particularities (run-of-river system, regional insertion and development plans and regional development management committee) of this process? In order to understand this question, the research aim is to understand the relationship between the Belo Monte Hydroelectric Power Plant project and its region of influence, highlighting the complexity and particularities of the regional restructuring process. In this regard, it is observed that from the relationship established between the construction of Belo Monte and its region of influence, a regional restructuring was developed with broad characteristics which identify it as perverse, at the time when it was built as an innovative project in terms of responsibility for the alleged regional development. It is possible to conclude that these transformations intensified the disruption of traditional economic activities by creating new forms of use and occupation in the region, which support the needs of the power plant and pretermit regional agents interests. In this way, it consolidated a model of income concentration, even with innovative normative instruments that would direct actions to produce a more equitable regional development.
 
ADVERTENCIA - La consulta de este documento queda condicionada a la aceptación de las siguientes condiciones de uso:
Este documento es únicamente para usos privados enmarcados en actividades de investigación y docencia. No se autoriza su reproducción con finalidades de lucro. Esta reserva de derechos afecta tanto los datos del documento como a sus contenidos. En la utilización o cita de partes del documento es obligado indicar el nombre de la persona autora.
Fecha de Publicación
2023-02-06
 
ADVERTENCIA: Aprenda que son los trabajos derivados haciendo clic aquí.
Todos los derechos de la tesis/disertación pertenecen a los autores
CeTI-SC/STI
Biblioteca Digital de Tesis y Disertaciones de la USP. Copyright © 2001-2024. Todos los derechos reservados.