• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Master's Dissertation
DOI
https://doi.org/10.11606/D.6.2017.tde-20012017-112837
Document
Author
Full name
Tania Regina Sano Sugawara
E-mail
Institute/School/College
Knowledge Area
Date of Defense
Published
São Paulo, 2016
Supervisor
Committee
Malheiros, Tadeu Fabricio (President)
Claudio, Celina Franco Bragança Rosa
Sanchez, Luis Enrique
Title in Portuguese
Licenciamento ambiental: acompanhamento de implantação de linhas de transmissão no Estado de São Paulo
Keywords in Portuguese
Acompanhamento Ambiental
Avaliação de Impacto Ambiental
Licenciamento Ambiental
Linha de Transmissão
Abstract in Portuguese
O licenciamento ambiental de linhas de transmissão no Estado de São Paulo é conduzido pela Companhia Ambiental do Estado de São Paulo (CETESB), com uso dos princípios da Avaliação de Impacto Ambiental (AIA). Na fase de planejamento dos projetos de Linhas de Transmissão (LTs), isto é, etapa de obtenção da Licença Ambiental Prévia, são estimados os impactos ambientais da implantação e operação do empreendimento, bem como as medidas mitigadoras ou minimizadoras destes impactos. Nas fases de instalação e operação de LTs ocorre a intervenção ambiental de fato. São implementadas e acompanhadas as medidas propostas pela AIA. O acompanhamento ambiental de empreendimentos licenciados com AIA é feito com base nas exigências expressas nas licenças emitidas e uso de vistorias técnicas. Dentre as exigências expressas nas licenças ambientais de LTs, destacam-se a elaboração de relatórios de acompanhamento das obras. Tais relatórios são elaborados pelo empreendedor responsável pela LT ou consultoria contratada pelo mesmo. Este projeto propõe um procedimento para acompanhamento ambiental de linhas de transmissão em licenciamento na CETESB, composto por Termo de Referência do Acompanhamento Ambiental das Obras de Linha de Transmissão e checklist para uso dos empreendedores e suas consultorias responsáveis pela elaboração dos relatórios de acompanhamento das obras e da operação e manutenção das linhas de transmissão.
Title in English
Environmental Permit: São Paulos Eletric Transmission Lines Construction Follow Up
Keywords in English
EIA Follow Up
Eletric Transmission Line
Environmental Impact Asessment
Environmental Permit
Abstract in English
Environmental permit for eletric transmission lines in the State of São Paulo is conducted by Companhia Ambiental do Estado de São Paulo (CETESB), using the principles of Environmental Impact Assessment (EIA). In the planning phase of the transmission lines projects, meaning, the phase of Preliminary Environmental Permit analisys, the environmental impacts of the implementation and operation of the aactivity are estimated, as well as mitigation our minimization measures. At the phases of installation and operation of transmission lines, occurs the environmental intervention itself. The minimization and mitigation measures estimated on the EIA are implemented and monitored. EIA follow up is based on the requirements expressed in the permits and technical inspections. Among the requirements set out in the environmental permits of transmission lines, highlight the construction environmental follow up reports. These reports are managed by the company responsible for the transmission line or consultant hired by it. This project proposes a procedure for environmental follow up of transmission lines in CETESBs permit process, composed by a Guideline for Transmission Line Construction Environmental Follow Up and a checklist meant to be applied by the company and their consultants responsible for that activity. The outcome expected are monitoring reports with standardized format and efficient information for the analysis of the technical team responsible for the CETESB permiting process. The construction of the proposed products was based on the literature review, documentary review and field observation and in a second stage, the development of pilot products, tests, interviews and construction of the final version.
 
WARNING - Viewing this document is conditioned on your acceptance of the following terms of use:
This document is only for private use for research and teaching activities. Reproduction for commercial use is forbidden. This rights cover the whole data about this document as well as its contents. Any uses or copies of this document in whole or in part must include the author's name.
Publishing Date
2017-02-15
 
WARNING: Learn what derived works are clicking here.
All rights of the thesis/dissertation are from the authors
CeTI-SC/STI
Digital Library of Theses and Dissertations of USP. Copyright © 2001-2024. All rights reserved.