• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Master's Dissertation
DOI
https://doi.org/10.11606/D.3.2004.tde-11042005-100645
Document
Author
Full name
Manuel Romero De La Iglesia
E-mail
Institute/School/College
Knowledge Area
Date of Defense
Published
São Paulo, 2004
Supervisor
Committee
Piveli, Roque Passos (President)
Além Sobrinho, Pedro
Chernicharo, Carlos Augusto de Lemos
Title in Portuguese
Avaliação de um sistema piloto composto de reator UASB seguido de lagoa aerada aeróbia e lagoa de decantação no tratamento de esgotos sanitários com elevada contribuição de despejos industriais.
Keywords in Portuguese
Decantação
Lagoa aerada
Pós-tratamento
Reator UASB
Tratamento de esgoto sanitário
Abstract in Portuguese
Este trabalho experimental apresenta os resultados da avaliação do desempenho de uma instalação piloto, composta por reator UASB seguido de lagoa aerada aeróbia e lagoa de decantação, no tratamento dos esgotos afluente a ETE - Jundiaí, que contém elevada contribuição de despejos industriais. O reator UASB e a lagoa de decantação tem volume útil de 3,0 m3 e 2,0 m3, respectivamente. O volume da lagoa aerada aeróbia é variável entre 7,2 m3 e 21,6 m3 de modo a permitir variar o tempo de detenção hidráulica. O sistema foi avaliado em termos da eficiência de remoção de DQO, DBO5, sólidos suspensos, nitrogênio total, fósforo total e cor verdadeira para tempos de detenção hidráulica na lagoa aerada aeróbia variando entre 1,0 e 3,5 dias mantendo, tanto no reator UASB quanto, na lagoa de decantação o tempo de detenção constante em 8,0 horas e 1,8 dia, respectivamente. O sistema completo apresentou uma eficiência de remoção de DQO total entre 85% e 87%, de DBO5 total entre 92% e 96%, de SST entre 81% e 87%, de SSV entre 80 e 88%, de nitrogênio total entre 55 e 57%, de fósforo total entre 60 e 70% e de cor verdadeira entre 50 e 60%, para tempos de detenção hidráulica na lagoa aerada aeróbia variando entre 1,5 e 3,5 dias. O reator UASB foi responsável pela remoção de cerca de 50% da DQO total, 60% da DBO5 total e 40% dos SST do afluente, operando em média com um tempo de detenção hidráulica de 8,0 horas. As eficiências alcançadas no sistema completo produziram um efluente final com uma concentração de DQO total entre 170 e 230 mg/L, de DBO5 total entre 30 e 60 mg/L, de SST entre 30 e 45 mg/L, de SSV entre 24 e 40 mg/L, de nitrogênio total entre 24 e 28 mg NH3/L, de fósforo total entre 3,5 e 5,5 mg P/L e de cor verdadeira entre 375 e 600 mg Pt/L. O sistema pesquisado mostrou-se uma alternativa viável para o tratamento do esgoto afluente à ETE - Jundiaí e poderá resultar em redução da área e em menor consumo de energia que os hoje necessários na ETE - Jundiaí, que emprega um sistema composto por lagoas aeradas aeróbias seguidas de lagoas de decantação.
Title in English
Treatment of sewage containing expressive amount of industrial effluents in a pilot plant system consisted of an UASB reactor followed by an aerated lagoon and a settling pond.
Keywords in English
Aerated lagoon
Anaerobic sewage treatment
Post-treatment
Settling pond
UASB reactor
Abstract in English
This experimental investigation was carried out in order to evaluate the performance of a pilot plant, composed of an UASB reactor followed by an aerated lagoon and a settling pond, treating the Wastewater Treatment Plant of Jundiaí city (WWTPJ) influent sewage, which contains in its composition an expressive amount of industrial effluents. The UASB reactor and settling pond have an useful volume of 3.0 m3 and 2.0 m3, respectively. The aerated lagoon volume is variable from 7.2 m3 to 21.6 m3 to make possible the hydraulic retention time variation. The COD, BOD5, suspended solids, total nitrogen, total phosphorus and true colour removal efficiencies of the system were evaluated when the aerated lagoon hydraulic retention time varied from 1.0 to 3.5 days and in the UASB reactor and settling pond was mainteined constant at 8.0 hours and 1.8 day, respectively. The range of removal efficiencies obtained in the system are: 85 - 87% for total COD, 92 - 96% for total BOD5, 81 - 87% for TSS, 80 - 88% for VSS, 55 - 57% for total nitrogen, 60 - 70% for total phosphorus, and 50 - 60% for true color, when the aerated lagoon hydraulic retention time varied from 1.5 to 3.5 days. The UASB reactor operating at 8.0 hours hydraulic retention time removes almost 50% of total COD, 60% of total BOD5 and 40% of TSS from the influent contents. The system performance lead to a final effluent with a total COD, total BOD5, TSS, VSS, total nitrogen, total phosphorus, and true color concentrations in the range of: 170 - 230 mg/L, 30 - 60 mg/L and 30 - 45 mg/L, 24 - 40 mg/L, 24 - 28 mg N/L, 3,5 - 5,5 mg P/L and 375 - 600 mg Pt/L, respectively. The system studied is a practicable alternative for the treatment of the WWTPJ influent sewage, probably with less area and energy saving whem compared to the WWTPJ current needs, which uses a system composed by an aerated lagoon followed by a settling pond
 
WARNING - Viewing this document is conditioned on your acceptance of the following terms of use:
This document is only for private use for research and teaching activities. Reproduction for commercial use is forbidden. This rights cover the whole data about this document as well as its contents. Any uses or copies of this document in whole or in part must include the author's name.
Publishing Date
2010-05-19
 
WARNING: Learn what derived works are clicking here.
All rights of the thesis/dissertation are from the authors
CeTI-SC/STI
Digital Library of Theses and Dissertations of USP. Copyright © 2001-2024. All rights reserved.