Dissertação de Mestrado
DOI
https://doi.org/10.11606/D.3.2006.tde-08122006-164741
Documento
Autor
Nome completo
Gabriel dos Santos Cruz Rocha
E-mail
Unidade da USP
Área do Conhecimento
Data de Defesa
Imprenta
São Paulo, 2006
Orientador
Banca examinadora
Tamada, Kikuo (Presidente)
Kanashiro, Winston Hisasi
Pimenta, Jaime Flavio
Título em português
Desvio de rios para a construção de barragens.
Palavras-chave em português
Barragem
Desvio de rios
Ensecadeira
Estruturas de desvio
Riscos de desvio
Resumo em português
As obras de desvio de rios para a construção de barragens, embora tenham caráter provisório, são de estrema importância, pois definem como o empreendimento será executado, garantindo segurança à sua construção, dentro de riscos calculados, devendo no entanto ser o mais econômica possível. As estruturas de desvio devem se encaixar no arranjo das estruturas permanentes, podendo ser utilizadas como tal. Este trabalho tem o intuito de apresentar as principais estruturas utilizadas em esquemas de desvio de rios e caracterizar sua utilização e aplicabilidade. Sempre que possível foram apresentados esquemas utilizados na prática ou previstos em projeto, para melhor exemplificar e caracterizar as diversas estruturas e as possíveis soluções para desvio de rios.
Título em inglês
River diversion for dam construction.
Palavras-chave em inglês
Cofferdam
Dam
Diversion risks
Diversion structures
River diversion
Resumo em inglês
Diversion works for dam construction are temporary. Nevertheless, they are extremely important, since they define how the construction is going to be made, and assuring its safety, within calculated risks. But, they have to be as economical as possible. The diversion structures must fit the global arrangement of the project, being in some cases be used as permanent structures. This document has the objective of present the main diversion structures used in diversion works schemes, as well as characterize their utilization and applicability. Whenever possible, it was presented examples of schemes either already used or just previewed on design, to better characterize and exemplify the many structures and possible solutions for river diversion.
 
AVISO - A consulta a este documento fica condicionada na aceitação das seguintes condições de uso:
Este trabalho é somente para uso privado de atividades de pesquisa e ensino. Não é autorizada sua reprodução para quaisquer fins lucrativos. Esta reserva de direitos abrange a todos os dados do documento bem como seu conteúdo. Na utilização ou citação de partes do documento é obrigatório mencionar nome da pessoa autora do trabalho.
ErrataGabrielRocha.pdf (87.81 Kbytes)
Data de Publicação
2006-12-19
 
AVISO: Saiba o que são os trabalhos decorrentes clicando aqui.
Todos os direitos da tese/dissertação são de seus autores
CeTI-SC/STI
Biblioteca Digital de Teses e Dissertações da USP. Copyright © 2001-2024. Todos os direitos reservados.