Master's Dissertation
DOI
https://doi.org/10.11606/D.3.2016.tde-03052016-141852
Document
Author
Full name
André Sandor Kajdacsy-Balla Sosnoski
E-mail
Institute/School/College
Knowledge Area
Date of Defense
Published
São Paulo, 2015
Supervisor
Committee
Mello Júnior, Arisvaldo Vieira (President)
Porto, Rubem La Laina
Reis, Luisa Fernanda Ribeiro
Title in Portuguese
Produção de energia por mini e micro hidrelétricas na rede de distribuição de água.
Keywords in Portuguese
Geração de energia elétrica
Mini e micro hidrelétricas
Otimização
Redes de distribuição de água
Redução de perdas
Sistemas de abastecimento
Usinas hidrelétricas
Abstract in Portuguese
A geração de energia hidrelétrica enfrenta uma crescente restrição a sua expansão, diretamente relacionada a fatores ambientais e da limitação de terrenos com potencial economicamente aproveitável. A partir deste fato, é relacionada uma possível fonte de energia hidrelétrica, resultante do aproveitamento dos potenciais presentes na rede de distribuição de água das cidades, ainda sem nenhum aproveitamento. O desenvolvimento desta fonte de energia se dá com a instalação de mini e micro centrais hidrelétricas nos condutos da rede distribuidora de água. Este trabalho tem por objetivo avaliar o potencial de aproveitamento hidrelétrico por mini e micro hidrelétricas por meio de técnicas de modelagem e de otimização, para agilizar e facilitar o procedimento de identificação dos potenciais e a instalação na rede de abastecimento. O trabalho leva em conta as diversas peculiaridades das redes de distribuição de água e dos equipamentos eletro-hidráulicos, discorrendo sobre a possível complementariedade da geração de energia durante os picos de consumo. Discorre também sobre a contribuição para a rede de distribuição elétrica, na logística e nos custos de implantação além de discutir a tipologia das turbinas capazes de aproveitar o potencial energético. É avaliado, com o auxilio de modelos hidráulicos e de otimização, o posicionamento das centrais geradoras na rede e os possíveis benefícios, restrições e impedimentos ao seu uso, desenvolvendo uma metodologia para facilitar a tomada de decisão quanto ao aproveitamento para geração, ou não, em redes diversas. A construção deste procedimento e ferramenta são desenvolvidos a partir do estudo de caso do sistema distribuidor de água do Município de Piquete no estado de São Paulo, Brasil.
Title in English
Energy production with mini and micro hydropower plants in the water supply system network.
Keywords in English
Mini and micro hydropower
Optimization
Water losses
Water supply system
Abstract in English
Hydropower energy production is facing limitations in their capacity to grow due directly to environmental and space limitations, questioning the actual economic benefits that hydropower have always had compared to other energy sources. In order to face this problems and to propose a new technology, the study focus on the potential of hydropower generation in the water supply systems (WSSs) network that are yet to be studied. Developing this new technology means the introduction of mini and micro hydropower plants in the WSS network. This study intends to develop a methodology and evaluate mini and micro hydropower potential, adopting optimization and modeling tools to accelerate and facilitate the identification procedures of potential installation points and the possibility of implementing pressure controls in the form of turbines in the network. The study considers all WSS peculiarities and restrictions, evaluating the introduction of electro hydraulic equipment and their interference and complementarity when considering energy consumption and production that would make the installation feasible. There is also a discussion about how will this technique be implemented in the network without interfering in water supply, and the logistics, costs and how energy distribution issues can be treated, including turbines type and configuration and also the activation timetables. All these features will be linked and treated with an optimization method that can provide decision making easier, locating production units and evaluating benefits and restrictions imposed by the environment. The construction of this procedure will be applied in a case study in the Piquete municipality in São Paulo, Brazil.
 
WARNING - Viewing this document is conditioned on your acceptance of the following terms of use:
This document is only for private use for research and teaching activities. Reproduction for commercial use is forbidden. This rights cover the whole data about this document as well as its contents. Any uses or copies of this document in whole or in part must include the author's name.
Publishing Date
2016-06-07
 
WARNING: Learn what derived works are clicking here.
All rights of the thesis/dissertation are from the authors
CeTI-SC/STI
Digital Library of Theses and Dissertations of USP. Copyright © 2001-2024. All rights reserved.