• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Disertación de Maestría
DOI
https://doi.org/10.11606/D.3.2009.tde-18122009-154702
Documento
Autor
Nombre completo
Raphael Bertrand Heideier
Dirección Electrónica
Instituto/Escuela/Facultad
Área de Conocimiento
Fecha de Defensa
Publicación
São Paulo, 2009
Director
Tribunal
Saidel, Marco Antonio (Presidente)
Barros, Virginia Parente de
Ramos, Dorel Soares
Título en portugués
Conceitos básicos de risco na comercialização de energia elétrica no Setor Elétrico Brasileiro e a atuação governamental.
Palabras clave en portugués
Eletrotécnica
Energia elétrica
Engenharia elétrica
Sistemas elétricos de potência
Resumen en portugués
Buscou-se refletir de que forma as decisões governamentais afetam o setor energético e como os agentes reagem ao modelo e à instabilidade das regras vigentes. O estudo compreende uma breve revisão da estrutura do atual modelo e dos principais riscos que envolvem a comercialização de eletricidade. Partiu-se do pressuposto que o preço é o maior risco presente no Setor Elétrico Brasileiro (SEB), uma vez que é o reflexo de uma somatória de riscos. Os preços analisados são: i) o preço de curto prazo de energia elétrica (PLD), sua relação com as usinas termoelétricas e o despacho fora da ordem de mérito; ii) a tarifa de energia elétrica no ambiente cativo e livre, as principais variáveis de influência e uma projeção dos valores futuros; e iii) o preço de longo prazo de energia elétrica, uma revisão do resultado dos leilões e a discussão sobre a prorrogação / licitação das concessões de geração pelo governo. Entendendo a estreita relação que existe entre os três preços discutidos (tarifa, PLD e contratação de longo prazo) propõe-se uma metodologia alternativa para formação de carteiras eficientes de recursos de geração com o objetivo de demonstrar a importância de promover a expansão através de um sólido planejamento de longo prazo. Demonstra-se a metodologia em um estudo de caso em que se discute os resultados alcançados. Por fim, três medidas de melhoria ao atual modelo do SEB são sugeridas: 1) O planejamento de longo prazo da expansão da geração ser feito de forma integrada, considerando aspectos sociais, políticos, ambientais e econômicos; 2) Desassociar o custo marginal de expansão do custo marginal de operação; e 3) Criar um mecanismo para que o próprio mercado possa estabelecer o preço de curto prazo da energia elétrica.
Título en inglés
Basic risk concepts in electric power trade in Brazilian Electric Sector and the Governmental performance.
Palabras clave en inglés
Brazilian electric sector
Electric power trade
Federal Government
Regulatory risk
Resumen en inglés
It is intended to reflect how the governmental decisions affect the energy sector, as the agents react to the model and the instability of the effective rules. The research understands a brief of the current electric sector model structure and the main risks that involve the electricity trade. It was assumed that the price is the largest present risk in the Brazilian Electric Sector (BES), because it is the consequence of a sum of risks. The prices analyzed are: i) the short term price of electric power, its relation with the thermoelectric plants and the out of merit order dispatch; ii) the tariff of electric power in the captive and free environments, the main influence variable and a projection of the future values; and iii) the long term price of electric power, an auctions results revision and the question of to renew or to bid the currents concessions for generation plants at the end of the granted period. Understanding the narrow relationships existent between the three argued prices (tariff, short and long term prices) it is proposed an alternative methodology to build efficient portfolio of generation resources to demonstrate the importance of long term plan to promote the expansion. The methodology is demonstrated in a study case where the results are discussed. Finally, three measures of improvement to the current model of the BES are suggested: 1) A long term plan to expand the generation resources based in an integrated methodology that involves social, ambiental politics and economics aspects; 2) To disassociate the operational marginal costs to the expansion marginal costs; and 3) To create a mechanism in order that the market itself can to establish the spot price of electric power.
 
ADVERTENCIA - La consulta de este documento queda condicionada a la aceptación de las siguientes condiciones de uso:
Este documento es únicamente para usos privados enmarcados en actividades de investigación y docencia. No se autoriza su reproducción con finalidades de lucro. Esta reserva de derechos afecta tanto los datos del documento como a sus contenidos. En la utilización o cita de partes del documento es obligado indicar el nombre de la persona autora.
dissRaphael.pdf (924.52 Kbytes)
Fecha de Publicación
2010-05-19
 
ADVERTENCIA: Aprenda que son los trabajos derivados haciendo clic aquí.
Todos los derechos de la tesis/disertación pertenecen a los autores
CeTI-SC/STI
Biblioteca Digital de Tesis y Disertaciones de la USP. Copyright © 2001-2024. Todos los derechos reservados.