• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Master's Dissertation
DOI
https://doi.org/10.11606/D.3.2014.tde-22052015-155307
Document
Author
Full name
Leonardo Gurgel Cálipo
E-mail
Institute/School/College
Knowledge Area
Date of Defense
Published
São Paulo, 2014
Supervisor
Committee
Mesquita, Marco Aurélio de (President)
Biazzi, Jorge Luiz de
Ronconi, Debora Pretti
Title in Portuguese
Análise do problema de controle de estoques dinâmico para demanda não estacionária e lead-time positivo.
Keywords in Portuguese
Controle de estoques
Demanda não-estacionária
Heurística
Programação dinâmica
Simulação
Abstract in Portuguese
O problema de controle de estoques com demanda não estacionária e lead-time positivo tem se tornado cada vez mais relevante em virtude da crescente tendência de redução do ciclo de vida dos produtos e internacionalização das cadeias de suprimentos. Embora haja uma solução exata para a minimização do custo esperado da política de estoques para este cenário, baseado no método de programação dinâmica, o custo computacional deste método ainda é considerado elevado. Este trabalho detalha e avalia através de simulação o método exato e duas aproximações para a minimização do custo esperado da política de estoques, em termos do desempenho em custo e eficiência computacional. Os resultados experimentais permitem a análise dos métodos disponíveis. Enquanto a abordagem heurística de Bollapragada e Morton, que utiliza o nivelamento da demanda não estacionária, perde desempenho de custo com o aumento do lead-time, a nova heurística proposta, que aproxima os parâmetros da política ótima por valores limitantes, produz resultados sucessivamente melhores com o aumento do lead-time.
Title in English
Analysis of the dynamic inventory control problem with nonstationary demand and positive lead-time.
Keywords in English
Dynamic programming
Heuristic
Inventory control
Non-stationary demand
Simulation
Abstract in English
The inventory control problem with nonstationary demand and positive lead-time has become increasingly important due to the growing trend of reduction in product life cycle and internationalization of the supply chain. Although there is an exact solution to the minimization of the expected cost of inventory policy on this environment, through the method of dynamic programming, the computational cost of this method is still considered high. This work details and evaluates through simulation the exact method and two heuristic solutions for the minimization of expected cost of inventory policy, in terms of cost performance and computational efficiency. The experimental results allow the analysis of the available methods. While the Bollapragada and Morton heuristic approach, which levels the non-stationary demand, decreases the cost performance when lead-time is increased, the new heuristic proposed, that approximates the optimal policy parameters by limiting values, successively produces better results with increasing lead-times.
 
WARNING - Viewing this document is conditioned on your acceptance of the following terms of use:
This document is only for private use for research and teaching activities. Reproduction for commercial use is forbidden. This rights cover the whole data about this document as well as its contents. Any uses or copies of this document in whole or in part must include the author's name.
ERRATA.pdf (37.19 Kbytes)
FichaCatalografica.pdf (13.67 Kbytes)
Publishing Date
2015-05-27
 
WARNING: The material described below relates to works resulting from this thesis or dissertation. The contents of these works are the author's responsibility.
  • CÁLIPO, L. G., e MESQUITA, M. A. Planejamento e Controle de Separação em um Sistema Picking by Monitor: um estudo em uma empresa de cosméticos. In XXXII Encontro Nacional de Engenharia de Produção, Bento Gonçalves - RS, 2012. Anais do XXXII Encontro Nacional de Engenharia de Produção., 2012.
All rights of the thesis/dissertation are from the authors
CeTI-SC/STI
Digital Library of Theses and Dissertations of USP. Copyright © 2001-2024. All rights reserved.