• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Mémoire de Maîtrise
DOI
https://doi.org/10.11606/D.3.2005.tde-10112023-115404
Document
Auteur
Nom complet
Giovanni Gerson Catellino
Adresse Mail
Unité de l'USP
Domain de Connaissance
Date de Soutenance
Editeur
São Paulo, 2005
Directeur
Jury
Botter, Rui Carlos (Président)
Júnior, Alceu Salles Camargo
Toledo, Nilton Nunes
Titre en portugais
Análise da implantação de projetos de sistemas de gestão integrada no setor público militar.
Mots-clés en portugais
Gestão de projetos
Sistemas ERP
Tecnologia da informação
Resumé en portugais
Na busca de vencer os desafios da competitividade exigidos às organizações no final do século vinte, com a obtenção de vantagens competitivas que garantam a eficácia e eficiência de suas atividades, as organizações realizaram aprimoramentos tecnológicos de hardware e software, fazendo grandes investimentos em tecnologia de informação e implantação de sistemas integrados de gestão, conhecidos no mercado como ERP (Enterprise Resources Planning). Da mesma forma, a Força Aérea Brasileira não poderia perder o rumo da história e deixar de estar pronta às exigências da Indústria Aeronáutica futura, bem como de uma economia globalizada que se instala no mundo. Nos anos noventa do século XX, o planejamento estratégico resolveu desenvolver um sistema integrado de gestão denominado SILOMS (Sistema Integrado de Manutenção e Serviços), que possibilita o gerenciamento integrado de suas atividades logísticas quanto aos trabalhos de manutenção e suprimento de materiais para suas aeronaves. Este estudo tem a intenção de analisar as características organizacionais e de gerenciamento de projetos de implantação, com base no PMBOK (Project Management Body of Knowledge) para a implementação de programas integrados de gestão em um setor público, onde se pretende verificar as causas de fracassos na implantação e a relevância dos Fatores Críticos de Sucesso (FCS) técnicos e não técnicos para o êxito de projetos dessa natureza, considerando oambiente das Organizações Militares. Assim, foi desenvolvida uma metodologia de verificação desses FCS, customizada para o setor público. ) Desta maneira, ao identificar os problemas potenciais causados pela cultura organizacional e quais as ações necessárias para minimizá-los, foi possível descrever uma metodologia de forma a romper paradigmas, para uma implantação bem-sucedida; e caracterizar por meio do estudo quais os benefícios obtidos e as dificuldades a serem superadas com o emprego de Sistemas Integrados de Gestão em Organizações Militares.
Titre en anglais
Untitled in english
Mots-clés en anglais
ERP systems
Information technology
Project management
Resumé en anglais
With the aim of overcoming the competition challenges demanded on organizations in the late 20th century through the establishment of a competitive edge which guarantees efficiency and effectiveness, organizations have made considerable improvement in hardware and software, with huge investment in information technology and implementation of integrated management systems, best known as ERP (Enterprise Resource Planning). Likewise, the Brazilian Air Force could not stand aloof and be away from the future demands of the Aeronautical Industry; as well as, of a globalized economy. In the 90's of the 20th century, the Brazilian Air Force's strategic planning developed an integrated management systems called SILOMS (Sistema Integrado de Manutenção e Serviço / Maintenance and Service Integrated System), which would enable the integrated management of its logistic activities, in relation to the maintenance and material supply for its aircraft. The objective of this paper is to analyze the organizational and project implementation management on the basis of PMBOK (Project Management Body of Knowledge), for the implementation of such integrated management programs in a public sector, in order to verify the cause of implementation failures, the relevance of technical and non-technical Critical Success Factors (CSF) for the success of projects of this nature, considering the environment of the Military Organizations. Thus, to develop a verification methodology ofthese CSF, customized for the public sector. In this way, once the potential problems caused by the organizational culture and which possible actions to minimize them have been identified, it will be possible to describe a methodology to change paradigms, for a successful implementation; and to characterize through the study which benefits will be obtained and difficulties to be surpassed with the use of Integrated Management Systems in Military Organizations.
 
AVERTISSEMENT - Regarde ce document est soumise à votre acceptation des conditions d'utilisation suivantes:
Ce document est uniquement à des fins privées pour la recherche et l'enseignement. Reproduction à des fins commerciales est interdite. Cette droits couvrent l'ensemble des données sur ce document ainsi que son contenu. Toute utilisation ou de copie de ce document, en totalité ou en partie, doit inclure le nom de l'auteur.
Date de Publication
2023-11-10
 
AVERTISSEMENT: Apprenez ce que sont des œvres dérivées cliquant ici.
Tous droits de la thèse/dissertation appartiennent aux auteurs
CeTI-SC/STI
Bibliothèque Numérique de Thèses et Mémoires de l'USP. Copyright © 2001-2024. Tous droits réservés.