• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Tesis Doctoral
DOI
https://doi.org/10.11606/T.3.2001.tde-23052001-171051
Documento
Autor
Nombre completo
Elvira Gabriela Ciacco da Silva Dias
Dirección Electrónica
Instituto/Escuela/Facultad
Área de Conocimiento
Fecha de Defensa
Publicación
São Paulo, 2001
Director
Tribunal
Sanchez, Luis Enrique (Presidente)
Eston, Sergio Medici de
Herrmann, Hildebrando
Rovere, Emilio Lébre La
Santos, Rozely Ferreira dos
Título en portugués
Avaliação de impacto ambiental de projetos de mineração no Estado de São Paulo: a etapa de acompanhamento.
Palabras clave en portugués
avaliação
impacto ambiental
implementação de projetos
mineração
Resumen en portugués
Desde a regulamentação dos procedimentos de avaliação de impacto ambiental (AIA), em meados dos anos oitenta, numerosos projetos de mineração foram avaliados, aprovados e licenciados no Estado de São Paulo, consumindo grande parte dos escassos recursos humanos e materiais disponíveis para análise técnica de estudos ambientais. Pouco se sabe, no entanto, sobre os resultados efetivamente alcançados com a aplicação do novo instrumento de gestão ambiental. Esta pesquisa teve como propósito geral avaliar a eficácia da aplicação dos procedimentos de AIA aos projetos de mineração no Estado de São Paulo. O foco principal da análise foi a etapa de acompanhamento, ou mais precisamente, a atuação dos órgãos governamentais no sentido de garantir a correta implementação do projeto, bem como do programa de gerenciamento ambiental definido no processo de AIA como condicionante à outorga da licença. Analisaram-se em profundidade seis casos escolhidos entre os estudos de impacto ambiental aprovados no Estado no período compreendido entre os anos de 1987 e 1997. Em cada caso estudado, examinaram-se todos os documentos e registros administrativos disponíveis nos principais órgãos de governo que participam do processo de AIA. Esta tarefa objetivou principalmente (1) obter dados sobre cada projeto; (2) pesquisar todas as medidas mitigadoras e outras medidas de gerenciamento ambiental propostas e incorporadas aos termos e condições de aprovação do projeto; e (3) verificar as ações de controle executadas após a aprovação do projeto. Complementarmente, visitaram-se as minas para observação das condições de implementação dos projetos e das medidas de gerenciamento ambiental. Os resultados do estudo confirmaram largamente suas hipóteses iniciais de que a implementação dos projetos é falha e compromete severamente o processo. Concluiu-se, ainda, que esta situação decorre não somente das deficiências dos órgãos fiscalizadores, incapazes de garantir o cumprimento dos termos e condições estabelecidos na aprovação do estudo de impacto ambiental, mas de uma cadeia de imperfeições que atinge praticamente todas as atividades do processo de AIA. Para superar as deficiências da etapa de acompanhamento, propõem-se, portanto, intervenções nas várias etapas do processo, que deve ser aprimorado e fortalecido, sob pena de transformar-se um poderoso instrumento de gestão como a avaliação de impacto ambiental em apenas mais um obstáculo em meio às já enormes dificuldades burocráticas impostas para a regularização de empreendimentos de mineração.
Título en inglés
Environmental impact assessment of mining projects: the follow-up phase.
Palabras clave en inglés
effectiveness
evaluation
follow-up
impact assessment
implementation problems
mining
small-scale projects
Resumen en inglés
Since procedures of environmental impact assessment (EIA) were regulated in Brazil, in the mid eighties, numerous mining projects have been assessed, approved and granted environmental permits in the State of São Paulo, draining a great part of the scarce human and material resources available for reviewing environmental studies. Notwithstanding, there are few data concerning the actual results achieved by this new environmental management tool. This research aimed at evaluating the effectiveness of the EIA procedures applied to mining projects in the State of São Paulo. The analysis focused mainly on the follow-up phase, or more precisely, on the government branches’ performance in enforcing the proper implementation of terms and conditions of project approval. The study examined in full detail six cases selected among the environmental impact studies approved in the State of São Paulo between 1987 and 1997. In each case studied, all the documents and administrative records of relevant government organisms that take part in the EIA process have been reviewed. This task aimed mainly at (1) obtaining data on each project, (2) surveying all mitigation and other management measures proposed and incorporated into the terms and conditions of project approval and (3) checking the control actions performed after project approval. Additionally, site visits were carried out in order to check the implementation of the project and the environmental management measures. The study widely confirmed its initial hypothesis that the implementation of mining projects is actually faulty, severely harming the whole process. The research also showed that this situation is not uniquely due to the weak performance of the surveillance agency, which is not able to enforce the terms and conditions of project approval, but also because of several imperfections that pervade most of the EIA process activities. To overcome the deficiencies in the follow-up phase, changes are proposed in several steps of the process, which should be improved and strengthened. If not, a powerful management tool as the environmental impact assessment is endangered to be transformed in just one more obstacle among the already enormous bureaucratic hindrances imposed to mining projects regularization.
 
ADVERTENCIA - La consulta de este documento queda condicionada a la aceptación de las siguientes condiciones de uso:
Este documento es únicamente para usos privados enmarcados en actividades de investigación y docencia. No se autoriza su reproducción con finalidades de lucro. Esta reserva de derechos afecta tanto los datos del documento como a sus contenidos. En la utilización o cita de partes del documento es obligado indicar el nombre de la persona autora.
Elviradias.pdf (4.83 Mbytes)
Fecha de Publicación
2001-05-28
 
ADVERTENCIA: Aprenda que son los trabajos derivados haciendo clic aquí.
Todos los derechos de la tesis/disertación pertenecen a los autores
CeTI-SC/STI
Biblioteca Digital de Tesis y Disertaciones de la USP. Copyright © 2001-2024. Todos los derechos reservados.