Disertación de Maestría
DOI
https://doi.org/10.11606/D.18.2018.tde-25092018-143916
Documento
Autor
Nombre completo
João Vitor Silva Robazzi
Instituto/Escuela/Facultad
Área de Conocimiento
Fecha de Defensa
Publicación
São Carlos, 2018
Director
Tribunal
Nagano, Marcelo Seido (Presidente)
Ribeiro, José Francisco Ferreira
Tavares Neto, Roberto Fernandes
Título en portugués
Novos limitantes inferiores para o flowshop com buffer zero
Palabras clave en portugués
Branch & Bound
Flowshop
Setup Dependente da Sequência
Bloqueio
Programação da Produção
Programação Linear Inteira Mista
Tempo Total de Atraso
Tempo Total de Fluxo
Resumen en portugués
O sequenciamento e a programação da produção trazem grandes benefícios financeiros às empresas se realizados de forma adequada. Atualmente, soluções generalizadas apresentam resultados aceitáveis, porém têm como consequência benefícios inferiores quando comparados a estudos específicos. O ramo da otimização de resultados possui dois tipos de soluções: as exatas para problemas de menores dimensões e não exatas, ou heurísticas, para problemas de médias e grandes dimensões. Este trabalho apresenta algoritmos exatos do tipo Branch & Bound e Modelos de Programação Linear Inteira Mista para solucionar quatro variações de problemas de scheduling: Fm|block|∑Cjm, Fm|block|∑Tj, Fm|block, Sijk|∑Cjm e Fm|block, Sijk|∑Tj. As abordagens utilizadas são inéditas na literatura e apresentaram resultados animadores para a maioria dos cenários. O limitante para o tempo total de fluxo obteve resposta ótima em 100% dos casos para problemas de até 20 tarefas e 4 máquinas em menos de uma hora. Para o tempo total de atraso, o limitante se mostrou mais eficiente quando os valores das due dates apresentam alta taxa de dispersão. Para os casos com setup, foram elaboradas três variações de limitantes para cada problema. O limitante com setup que apresentou o melhor desempenho foi o que obteve a melhor relação entre o seu valor numérico e seu custo computacional. Os modelos MILP solucionaram 100% dos problemas sem setup para até 20 tarefas e 4 máquinas e para os casos com setup, foram solucionados problemas de até 14 tarefas e 4 máquinas no tempo limite de uma hora. Os testes computacionais mostram a eficiência na redução do número de nós e, consequentemente, no tempo de execução. Portanto, o estudo realizado indica que, para problemas de pequeno porte e médio, os métodos em questão possuem grande potencial para aplicações práticas.
Título en inglés
New lower bounds for the zero buffer flowshop
Palabras clave en inglés
Blocking
Branch & Bound
Flowshop
Mixed Integer Linear Program
Scheduling
Sequence Dependent setup
Total Flow Time
Total Tardiness
Resumen en inglés
Job Sequence and Programming give benefits both financial and organizational to any company when performed properly. Nowadays, there is still a gap between theory and practice due to solutions that are short in specification. The analyzed problems differ in type and dimension thus modifying its complexity. The results optimization field is divided into two types of solution: the exact solution for minor problems and the non-exact solution for greater dimension problems. The present paper presents exact algorithms to solve the problems Fm|block|∑Cjm, Fm|block|∑Tj, Fm|block, Sijk|∑Cjm by the Branch & Bounds and Mixed Integer Linear Program models. The approaches are new and presented good results for most cases. Bounds for the no-setup total flow time scenario solved 100% of the 20 jobs and 4 machines cases. High dispersion range due dates contributed for the effectiveness of the no-setup total tardiness bound's effectiveness. Three different approaches were developed for the setup cases. The best approach aimed to optimize the value/effort factor for the B&B. The Mixed Integer Linear Program models solved 100% of the no-setup cases for 20 jobs and 4 machines. The MILPs setup cases solved optimally 14 jobs and 4 machines cases. Computational tests were executed and analyzed and they highlighted the node count reduction and, consequently, the execution time. The present study points out that the exact methods can be applied to small and medium scheduling problems in practice.
 
ADVERTENCIA - La consulta de este documento queda condicionada a la aceptación de las siguientes condiciones de uso:
Este documento es únicamente para usos privados enmarcados en actividades de investigación y docencia. No se autoriza su reproducción con finalidades de lucro. Esta reserva de derechos afecta tanto los datos del documento como a sus contenidos. En la utilización o cita de partes del documento es obligado indicar el nombre de la persona autora.
Fecha de Publicación
2018-09-27
 
ADVERTENCIA: Aprenda que son los trabajos derivados haciendo clic aquí.
Todos los derechos de la tesis/disertación pertenecen a los autores
CeTI-SC/STI
Biblioteca Digital de Tesis y Disertaciones de la USP. Copyright © 2001-2024. Todos los derechos reservados.