Mémoire de Maîtrise
DOI
https://doi.org/10.11606/D.18.2011.tde-11052011-092917
Document
Auteur
Nom complet
Renato Billia de Miranda
Unité de l'USP
Domain de Connaissance
Date de Soutenance
Editeur
São Carlos, 2011
Directeur
Jury
Mauad, Frederico Fabio (Président)
Bermann, Celio
Pacheco, Iramir Barba
Titre en portugais
A influência do assoreamento na geração de energia hidrelétrica: estudo de caso na Usina de Três Irmãos - SP
Mots-clés en portugais
AcquaNet
Assoreamento
Setor hidroenergético - planejamento e gerenciamento
Usina de Três Irmãos
Resumé en portugais
Com a crescente demanda de energia elétrica há a necessidade da criação de novas fontes de energia e otimização das fontes já existentes. No caso de países que apresentam uma matriz energética predominantemente hidrelétrica como o Brasil, com grandes usinas e reservatórios, os estudos sedimentológicos e os levantamentos batimétricos se apresentam como importantes ferramentas para melhorar o planejamento e o gerenciamento dos recursos hídricos e energéticos. Atualmente, muitos reservatórios hidrelétricos operam com dados defasados devido, principalmente, ao contínuo processo de assoreamento dos reservatórios. Este fato faz com que as políticas de gestão e operação destes reservatórios sejam realizadas a partir de dados diferentes dos encontrados na realidade. Neste contexto, a dissertação apresenta um estudo de caso no Reservatório de Três Irmãos (SP), onde foi realizado um levantamento batimétrico em 2008, e a partir da comparação dos dados obtidos neste levantamento com os dados fornecidos pela concessionária de energia, de 1975, foi possível estimar as perdas de volume total, útil e morto do reservatório que correspondem a 14,3%, 14,5% e 14,2%, respectivamente. A partir da observação destas modificações nos dados operacionais do reservatório em estudo, foi realizada a simulação da operação do reservatório e da usina hidrelétrica por meio do software AcquaNet, com a intenção de analisar qual a interferência do assoreamento do reservatório na geração de energia elétrica, durante o período de 1993 a 2008. Com os resultados foi constatado que a diminuição do volume útil do reservatório (devido ao assoreamento) acarretou na redução da energia gerada pela usina durante o período analisado. Também foi possível estimar as perdas financeiras da concessionária de energia com a redução da produção energética. Foram sugeridas, ainda, algumas medidas preventivas e corretivas para a redução do processo de assoreamento do reservatório em estudo.
Titre en anglais
The influence of silting in the generation of hydroelectric energy: case study at Três Irmãos power plant - SP
Mots-clés en anglais
AcquaNet
Hydropower sector - planning and management
Silting
Três Irmãos power plant
Resumé en anglais
With the increasing demand of energy, it is necessary to create new sources and optimize the ones that already exist. In the case of countries that present an energy matrix predominantly hydroelectric such as Brazil, where there are huge power plants and reservoirs, the studies on sedimentation and beating surveys are presented as important tools to sharpen the planning and the management of water and energy resources. Currently, most of the hydroelectric reservoirs operate in gapped data, due to, mainly, the continuing process of reservoirs silting. This makes management policies and operation of these reservoirs be performed from data that differ from the ones found in reality. In this context, this dissertation presents a case study at the Três Irmãos Reservoir (SP), where a beating survey was carried out in 2008, and, from the comparison of the data revealed in that survey with the data provided by the power utility in 1975, it was possible to estimate the losses of total capacity, live storage and void volume of the reservoir, which correspond to 14,3%, 14,5% e 14,2%, respectively. From the observation of these operational data modification of the reservoir under study was performed the simulate of the operation of the reservoir and hydroelectric plant with the employing of the AcquaNet software with the intention to look into the interference of silting of the reservoir in generate electricity during the period 1993 to 2008. With the results was found that the decrease in the capacity of the reservoir (due to siltation) resulted in the reduction of energy generated by the plant during the period analyzed. With this verification, it was also possible to estimate the financial losses of the power utility with the reduction of energy production. Was suggested also, some preventive and corrective measures to reduce siltation process in the reservoir under study.
 
AVERTISSEMENT - Regarde ce document est soumise à votre acceptation des conditions d'utilisation suivantes:
Ce document est uniquement à des fins privées pour la recherche et l'enseignement. Reproduction à des fins commerciales est interdite. Cette droits couvrent l'ensemble des données sur ce document ainsi que son contenu. Toute utilisation ou de copie de ce document, en totalité ou en partie, doit inclure le nom de l'auteur.
Date de Publication
2011-05-13
 
AVERTISSEMENT: Apprenez ce que sont des œvres dérivées cliquant ici.
Tous droits de la thèse/dissertation appartiennent aux auteurs
CeTI-SC/STI
Bibliothèque Numérique de Thèses et Mémoires de l'USP. Copyright © 2001-2024. Tous droits réservés.