• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Mémoire de Maîtrise
DOI
https://doi.org/10.11606/D.18.2016.tde-01032016-114500
Document
Auteur
Nom complet
George Lauro Ribeiro de Brito
Unité de l'USP
Domain de Connaissance
Date de Soutenance
Editeur
São Carlos, 2003
Directeur
Jury
Bretas, Newton Geraldo (Président)
Andrade Filho, Marinho Gomes de
London Junior, João Bosco Augusto
Titre en portugais
Método para locação de medidores e UTRs para efeito de estimação de estados em sistemas elétricos de potência
Mots-clés en portugais
Estimação de estados
Locação de medidores e UTRs
Observabilidade de redes
Resumé en portugais
Desenvolveu-se neste trabalho um método para projeto e fortalecimento de planos de medição, para efeito de estimação de estados. O método proposto permite a obtenção de planos de medição que além de isentos de medidas críticas e de conjuntos críticos de medidas, garantem a observabilidade do sistema, mesmo com a perda simultânea de 1 ou 2 medidas quaisquer, ou, até mesmo, com a perda de 1 UTR. É um método numérico simples, de fácil implantação, que se baseia na análise da estrutura da matriz resultante da decomposição LDU, que é obtida através da fatoração triangular da matriz Jacobiana. Para comprovar a sua eficiência, vários testes foram realizados, utilizando os sistemas de 14 e 30 barras do IEEE, o sistema de 121 barras da ELETROSUL e o sistema de 383 barras da CHESF.
Titre en anglais
not available
Mots-clés en anglais
Meter placement
Network observability
RTU placement
State estimation
Resumé en anglais
In this work a method to design and to upgrade Measurements Placement Plan for state estimation is proposed. The proposed method allows the obtention of measurements placement plans that, besides free of both critical measurements and critical sets, maintain the system observability when 1 or 2 measurements are lost, at same time, or even when a Remote Terminal Unit (RTU) is lost. It is a simple numerical method, easy to implement and based on the analysis of the structure of the resultant matrix of the decomposition LDU, that it is obtained through a triangular factorization of the Jacobian matrix. To prove the efficiency of the proposed method, several tests were made using the IEEE 14 and 30-bus systems, a 121-bus system from ELETROSUL and a 383-bus system from CHESF.
 
AVERTISSEMENT - Regarde ce document est soumise à votre acceptation des conditions d'utilisation suivantes:
Ce document est uniquement à des fins privées pour la recherche et l'enseignement. Reproduction à des fins commerciales est interdite. Cette droits couvrent l'ensemble des données sur ce document ainsi que son contenu. Toute utilisation ou de copie de ce document, en totalité ou en partie, doit inclure le nom de l'auteur.
Date de Publication
2016-03-01
 
AVERTISSEMENT: Apprenez ce que sont des œvres dérivées cliquant ici.
Tous droits de la thèse/dissertation appartiennent aux auteurs
CeTI-SC/STI
Bibliothèque Numérique de Thèses et Mémoires de l'USP. Copyright © 2001-2024. Tous droits réservés.