• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Disertación de Maestría
DOI
https://doi.org/10.11606/D.17.2020.tde-08022021-144109
Documento
Autor
Nombre completo
Willian Pires Loddi
Dirección Electrónica
Instituto/Escuela/Facultad
Área de Conocimiento
Fecha de Defensa
Publicación
Ribeirão Preto, 2020
Director
Tribunal
Nunes, Altacilio Aparecido (Presidente)
Costa, Wangner Barbosa da
Júnior, Jorge Elias
Título en portugués
Análise do sistema de manutenção preventiva de aparelhos de ultrassonografia em hospital de alta complexidade, ensino e pesquisa
Palabras clave en portugués
Engenharia clínica
Manutenção preventiva
Ultrassom
Resumen en portugués
Os avanços tecnológicos aplicados aos equipamentos médicos passam por um processo evolutivo constante no ambiente hospitalar. Atualmente, pode-se notar a diversidade de doenças e o quanto estas evoluem rapidamente, pesando nisso, faz-se necessário a união do conhecimento clínico ao conhecimento tecnológico, a fim de propiciar cuidados mais assertivos e confiáveis aos pacientes. Na busca incessante pela mantenabilidade e confiabilidade na família de equipamento médico de ultrassom, voltado ao diagnóstico clínico, desenvolveu-se um estudo comparativo, por meio do software institucional Sistema Ordem de Serviço, considerando os momentos anteriores à implantação da manutenção preventiva (2013 a 2015) e posteriores a implantação da ação preventiva (2017 a 2019) no Hospital das Clínicas da Faculdade de Medicina de Ribeirão Preto (HCFMRP). Diante deste cenário que envolve a Engenharia Clínica do HCFMRP, foram utilizados indicadores de porcentagem de conclusão do programa de manutenção preventiva, número de ordem de serviço de manutenção corretiva, porcentagem de reparos realizados internamente, porcentagem de reparos realizados externamente, indisponibilidade dos equipamentos advinda da manutenção corretiva e o impacto que a manutenção preventiva trouxe quanto à realização dos exames, para constatar a efetividade de se ter um programa de manutenção preventiva. Diante da coleta destes dados foi possível quantificar o impacto positivo em ter um programa de manutenção preventiva desenvolvido dentro da própria instituição. Em suma, a implantação da manutenção preventiva dentro do HCFMRP, na família de equipamento de ultrassom, foi de grande importância, pois seu desenvolvimento implicou na redução das manutenções corretivas, na diminuição da indisponibilidade do equipamento e dos custos envolvidos de equipamento parado, na diminuição do impacto no atendimento ao público, bem como no maior envolvimento entre usuários e equipe mantenedora, além de elucidar o início de uma mudança cultural dentro da instituição.
Título en inglés
Analysis of the preventive maintenance system for ultrasound devices in a highly complex hospital, teaching and research
Palabras clave en inglés
Clínical engineering
Preventive maintenance
Ultrasound
Resumen en inglés
Technological advances applied to medical equipment undergo a constant evolutionary process in the hospital environment. Currently, it is possible to notice the diversity of diseases and how quickly they evolve, weighing this, it is necessary to combine Clínical knowledge with technological knowledge, in order to provide more assertive and reliable care to patients. In the relentless search for maintainability and reliability in the family of medical ultrasound equipment, aimed at Clínical diagnosis, a comparative study was developed, using the institutional software Order of Service, considering the moments prior to the implementation of preventive maintenance (2013 to 2015) and subsequent to the implementation of the preventive action (2016 to 2019) at the Hospital das Clínicas of the Ribeirão Preto Medical School (HCFMRP). In view of this scenario involving HCFMRP Clínical Engineering, indicators of percentage of completion of the preventive maintenance program, number of corrective maintenance work order, percentage of repairs carried out internally, percentage of repairs carried out externally, equipment unavailability due to corrective maintenance and the impact that preventive maintenance had on the performance of exams, to verify the effectiveness of having a preventive maintenance program. Given the collection of these data, it was possible to quantify the positive impact of having a preventive maintenance program developed within the institution itself. In short, the implementation of preventive maintenance within the HCFMRP, in the family of ultrasound equipment, was extremely important, since its development implied in the reduction of corrective maintenance, in the reduction of equipment unavailability and in the costs of stopped equipment, in the decrease the impact on public service, as well as greater involvement between users and the maintenance team, in addition to elucidating the beginning of cultural change within the institution.
 
ADVERTENCIA - La consulta de este documento queda condicionada a la aceptación de las siguientes condiciones de uso:
Este documento es únicamente para usos privados enmarcados en actividades de investigación y docencia. No se autoriza su reproducción con finalidades de lucro. Esta reserva de derechos afecta tanto los datos del documento como a sus contenidos. En la utilización o cita de partes del documento es obligado indicar el nombre de la persona autora.
Fecha de Publicación
2021-03-24
 
ADVERTENCIA: Aprenda que son los trabajos derivados haciendo clic aquí.
Todos los derechos de la tesis/disertación pertenecen a los autores
CeTI-SC/STI
Biblioteca Digital de Tesis y Disertaciones de la USP. Copyright © 2001-2024. Todos los derechos reservados.