Tese de Doutorado
DOI
https://doi.org/10.11606/T.12.2003.tde-10032023-171702
Documento
Autor
Nome completo
Alceu Salles Camargo Júnior
E-mail
Unidade da USP
Área do Conhecimento
Data de Defesa
Imprenta
São Paulo, 2003
Orientador
Banca examinadora
Yu, Abraham Sin Oih (Presidente)
Brinati, Marco Antonio
Nascimento, Paulo Tromboni de Souza
Siqueira, Jose de Oliveira
Toledo, José Carlos de
Título em português
Engenharia simultânea: uma comparação entre as abordagens "point-based" e "set-based"
Palavras-chave em português
Desenvolvimento de produtos
Engenharia simultânea
Modelos para processos estocásticos
Resumo em português
A Administração de Empresas tem sofrido grandes revoluções nas últimas décadas devido ao aumento na quantidade e na complexidade dos problemas em seu âmbito não pararam de crescer. Depois de décadas de acumulação de competências pelas empresas para poderem responder a demandas cada vez mais dinâmicas e diversificadas, a Inovação desponta como a grande competência proativa almejada pelas companhias. Neste contexto, a pesquisa compara, através de modelagens matemáticas, os desempenhos econômicos das duas abordagens diferentes de gestão da Engenharia Simultânea. A Engenharia Simultânea se apresenta atualmente como uma das formas mais eficientes de gestão do processo de inovação. As duas abordagens são conhecidas como Engenharia Simultânea ponto-a-ponto (Point-Based), pela qual se conduz o desenvolvimento através de melhorias a partir de um único conceito inicial e a Engenharia Simultânea Baseada em Conjunto de Alternativas (Set-Based) onde há um processo de convergência, desenvolvendo-se, em paralelo, várias de alternativas de projetos. Modelos matemáticos foram desenvolvidos com o objetivo de comparar o desempenho econômico do desenvolvimento de produtos, quando geridos pelo Set-Based ou pelo Point-Based, para projetos sob diferentes condições de incertezas, complexidades técnicas, diferentes custos de desenvolvimento e que se deparam com diferentes extensões de janelas de oportunidades para as vendas do produto. O principal resultado é a obtenção do mapeamento das regiões, definidas por determinadas condições de projetos, para as quais cada uma das estratégias apresenta-se como a de melhor resultado econômico. Tal mapeamento possibilita implicações gerenciais no sentido de que permite a associação imediata das condições do ambiente de negócios e do projeto em questão com a estratégia de inovação que levaria a melhores resultados. Foram encontrados resultados que confirmam a idéia, presente na literatura, de que o Set-Based deve apresentar um potencial maior para gerir projetos mais incertos e/ou de maiores complexidades. Outro resultado interessante é o que mostra ser o desempenho econômico do Set-Based também superior mesmo para projetos que apresentam baixos níveis de incerteza e/ou complexidade técnicas com custos de desenvolvimento altos se se depararem com extensões de janelas de oportunidades para as vendas relativamente pequenas.
Título em inglês
Simultaneous engineering: a comparison between "point-based" and "set-based" approaches
Palavras-chave em inglês
Concurrent engineering
Models for stochastic processes
Product development
Resumo em inglês
Business administration has been changing with great revolutions in the last decades, and by the way the quantity and its problems complexities didn't stop growing. After decades of competences accumulation by the companies to answer to the more dynamic and diversified demands, Innovation has became the great pro-ative competence craved by the surviving companies. Then, this research analyses, through mathematical models, the economic performance of the two different Concurrent Engineering strategies. Concurrent Engineering is one of the most efficient methods of innovation process management nowadays. The two strategies are known as Point-Based Concurrent Engineering that drives the development process through improvements from only one initial concept and Set-Based Concurrent Engineering that manage the product development with a process that begins with multiple concept alternatives and converges to the best one. Mathematical models were developed with the goal of comparing the economic performance ofthe product development, as managed by Set-Based Concurrent Engineering or by Point-Based Concurrent Engineering, for projects with different technical uncertainty and complexity leveis, different development costs and in the presence of different product sales opportunity window extensions. The most important result may be the regions mapping that are defined from well known project conditions, to what each one of the strategies get the best economic result. This mapping enables management implies because it allows the immediate association of business environment and considered project conditions with the strategy that will take the best result. We found results that confirm the idea, in the literature, that Set-Based Concurrent Engineering has a better potential to manage projects with higher leveis of technical uncertainty and complexity. Another interesting result is one that shows that Set-Based economic performance is also superior to projects with lower leveis of technical uncertainty and/or complexity with higher development costs in the presence of relatively small extensions of the product sales opportunity window.
 
AVISO - A consulta a este documento fica condicionada na aceitação das seguintes condições de uso:
Este trabalho é somente para uso privado de atividades de pesquisa e ensino. Não é autorizada sua reprodução para quaisquer fins lucrativos. Esta reserva de direitos abrange a todos os dados do documento bem como seu conteúdo. Na utilização ou citação de partes do documento é obrigatório mencionar nome da pessoa autora do trabalho.
Data de Publicação
2023-03-10
 
AVISO: Saiba o que são os trabalhos decorrentes clicando aqui.
Todos os direitos da tese/dissertação são de seus autores
CeTI-SC/STI
Biblioteca Digital de Teses e Dissertações da USP. Copyright © 2001-2024. Todos os direitos reservados.