Mémoire de Maîtrise
DOI
https://doi.org/10.11606/D.106.2023.tde-11122023-185032
Document
Auteur
Nom complet
Paulo Rodolpho de Oliveira Moreira
Adresse Mail
Unité de l'USP
Domain de Connaissance
Date de Soutenance
Editeur
São Paulo, 2023
Directeur
Jury
Pacca, Sérgio Almeida (Président)
Bargos, Fabiano Fernandes
Barros, Virginia Parente de
Correia, Paulo de Barros
Titre en portugais
Avaliação da usina hidrelétrica Henry Borden como usina reversível auxiliada por usina fotovoltaica flutuante
Mots-clés en portugais
Fontes Renováveis Intermitentes
Otimização
Usina Fotovoltaica Flutuante
Usina Hidrelétrica Henry Borden
Usina Hidrelétrica Reversível
Resumé en portugais
A Usina Hidrelétrica Henry Borden, com capacidade instalada de 889 MW e 711,5m de queda dágua, está localizada na região metropolitana de São Paulo. Seu fator de capacidade é, no entanto, de 23%, devido à implementação da regulação SMA-SSE-92, que limita o uso da água do Rio Pinheiros. Essa restrição, aliada à introdução do Preço de Liquidação de Diferenças horário em 2021, que aproxima o preço de comercialização da eletricidade do seu valor de equilíbrio, e a crescente participação de fontes renováveis intermitentes na oferta de eletricidade do Sistema Interligado Nacional, que introduz instabilidade à rede, induzem à condução de um estudo que considera transformar a usina Henry Borden em reversível. O objetivo deste estudo foi avaliar a operação e venda da geração de eletricidade produzida pelo conjunto usina Henry Borden reversível e fotovoltaica flutuante no Reservatório Rio das Pedras durante 20 anos, por meio da evolução do volume de água no reservatório superior. Para isso, maximizou-se sua receita pelo método de Programação Linear. A previsão das séries temporais de demanda e geração foi executada mediante os métodos SARIMAX, mínimos quadrados e Monte Carlo. Obteve-se a total depleção do reservatório superior em 2022, condição mantida até 2037, quando a geração projetada supera a demanda em horários específicos. Entre 2037 e 2042, utilizou-se apenas 10% do volume máximo do reservatório superior, com capacidade de 1 hm³, atingindo uma receita máxima de R$ 3,83 bilhões.
Titre en anglais
Evaluation of the Henry Borden hydroelectric plant as a pumped storage hydropower assisted by a floating photovoltaic plant
Mots-clés en anglais
Floating Photovoltaic Plant
Henry Borden Plant
Optimization
Pumped Storage Hydropower Plant
Variable Energy Sources
Resumé en anglais
With an installed capacity of 889 MW and 711.5 m of waterfall, the Henry Borden Hydroelectric Plant is in the metropolitan region of São Paulo. The capacity factor is, however, 23%, due to the implementation of regulation SMA-SSE-92, which restricts the use of water from the Pinheiros River. The introduction of the hourly differences settlement price in 2021, which brings the electricity commercialization price closer to its break-even value, and the growing share of intermittent renewable sources in the electricity supply of the National Interconnected System, which introduces instability to the network, led to the conduct of a study that considers the possibility of transforming the Henry Borden plant into a reversible one. This study aimed to evaluate the operation and sale of electricity generation produced by the Pumped Storage Hydropower Henry Borden reversible and floating photovoltaic plant set in the Rio das Pedras Reservoir for 20 years, through the evolution of the water volume in the upper reservoir. For this, the Linear Programming method was used to maximize its revenue. The forecast of demand and generation time series was conducted by employing SARIMAX, the least squares, and Monte Carlo techniques. In 2022, the upper reservoir was completely depleted, a condition that was maintained until 2037, when projected generation exceeded demand at specific times. Between the years 2037 and 2042, a mere 10% of the maximum volume of the upper reservoir was utilized, with a capacity of 1 hm³, resulting in a maximum revenue of R$ 3.83 billion.
 
AVERTISSEMENT - Regarde ce document est soumise à votre acceptation des conditions d'utilisation suivantes:
Ce document est uniquement à des fins privées pour la recherche et l'enseignement. Reproduction à des fins commerciales est interdite. Cette droits couvrent l'ensemble des données sur ce document ainsi que son contenu. Toute utilisation ou de copie de ce document, en totalité ou en partie, doit inclure le nom de l'auteur.
Date de Publication
2023-12-22
 
AVERTISSEMENT: Apprenez ce que sont des œvres dérivées cliquant ici.
Tous droits de la thèse/dissertation appartiennent aux auteurs
CeTI-SC/STI
Bibliothèque Numérique de Thèses et Mémoires de l'USP. Copyright © 2001-2024. Tous droits réservés.