Disertación de Maestría
DOI
https://doi.org/10.11606/D.106.2023.tde-11122023-185032
Documento
Autor
Nombre completo
Paulo Rodolpho de Oliveira Moreira
Dirección Electrónica
Instituto/Escuela/Facultad
Área de Conocimiento
Fecha de Defensa
Publicación
São Paulo, 2023
Director
Tribunal
Pacca, Sérgio Almeida (Presidente)
Bargos, Fabiano Fernandes
Barros, Virginia Parente de
Correia, Paulo de Barros
Título en portugués
Avaliação da usina hidrelétrica Henry Borden como usina reversível auxiliada por usina fotovoltaica flutuante
Palabras clave en portugués
Fontes Renováveis Intermitentes
Otimização
Usina Fotovoltaica Flutuante
Usina Hidrelétrica Henry Borden
Usina Hidrelétrica Reversível
Resumen en portugués
A Usina Hidrelétrica Henry Borden, com capacidade instalada de 889 MW e 711,5m de queda dágua, está localizada na região metropolitana de São Paulo. Seu fator de capacidade é, no entanto, de 23%, devido à implementação da regulação SMA-SSE-92, que limita o uso da água do Rio Pinheiros. Essa restrição, aliada à introdução do Preço de Liquidação de Diferenças horário em 2021, que aproxima o preço de comercialização da eletricidade do seu valor de equilíbrio, e a crescente participação de fontes renováveis intermitentes na oferta de eletricidade do Sistema Interligado Nacional, que introduz instabilidade à rede, induzem à condução de um estudo que considera transformar a usina Henry Borden em reversível. O objetivo deste estudo foi avaliar a operação e venda da geração de eletricidade produzida pelo conjunto usina Henry Borden reversível e fotovoltaica flutuante no Reservatório Rio das Pedras durante 20 anos, por meio da evolução do volume de água no reservatório superior. Para isso, maximizou-se sua receita pelo método de Programação Linear. A previsão das séries temporais de demanda e geração foi executada mediante os métodos SARIMAX, mínimos quadrados e Monte Carlo. Obteve-se a total depleção do reservatório superior em 2022, condição mantida até 2037, quando a geração projetada supera a demanda em horários específicos. Entre 2037 e 2042, utilizou-se apenas 10% do volume máximo do reservatório superior, com capacidade de 1 hm³, atingindo uma receita máxima de R$ 3,83 bilhões.
Título en inglés
Evaluation of the Henry Borden hydroelectric plant as a pumped storage hydropower assisted by a floating photovoltaic plant
Palabras clave en inglés
Floating Photovoltaic Plant
Henry Borden Plant
Optimization
Pumped Storage Hydropower Plant
Variable Energy Sources
Resumen en inglés
With an installed capacity of 889 MW and 711.5 m of waterfall, the Henry Borden Hydroelectric Plant is in the metropolitan region of São Paulo. The capacity factor is, however, 23%, due to the implementation of regulation SMA-SSE-92, which restricts the use of water from the Pinheiros River. The introduction of the hourly differences settlement price in 2021, which brings the electricity commercialization price closer to its break-even value, and the growing share of intermittent renewable sources in the electricity supply of the National Interconnected System, which introduces instability to the network, led to the conduct of a study that considers the possibility of transforming the Henry Borden plant into a reversible one. This study aimed to evaluate the operation and sale of electricity generation produced by the Pumped Storage Hydropower Henry Borden reversible and floating photovoltaic plant set in the Rio das Pedras Reservoir for 20 years, through the evolution of the water volume in the upper reservoir. For this, the Linear Programming method was used to maximize its revenue. The forecast of demand and generation time series was conducted by employing SARIMAX, the least squares, and Monte Carlo techniques. In 2022, the upper reservoir was completely depleted, a condition that was maintained until 2037, when projected generation exceeded demand at specific times. Between the years 2037 and 2042, a mere 10% of the maximum volume of the upper reservoir was utilized, with a capacity of 1 hm³, resulting in a maximum revenue of R$ 3.83 billion.
 
ADVERTENCIA - La consulta de este documento queda condicionada a la aceptación de las siguientes condiciones de uso:
Este documento es únicamente para usos privados enmarcados en actividades de investigación y docencia. No se autoriza su reproducción con finalidades de lucro. Esta reserva de derechos afecta tanto los datos del documento como a sus contenidos. En la utilización o cita de partes del documento es obligado indicar el nombre de la persona autora.
Fecha de Publicación
2023-12-22
 
ADVERTENCIA: Aprenda que son los trabajos derivados haciendo clic aquí.
Todos los derechos de la tesis/disertación pertenecen a los autores
CeTI-SC/STI
Biblioteca Digital de Tesis y Disertaciones de la USP. Copyright © 2001-2024. Todos los derechos reservados.