• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Disertación de Maestría
DOI
https://doi.org/10.11606/D.86.2012.tde-16072012-144617
Documento
Autor
Nombre completo
Paula Matos Makaron
Dirección Electrónica
Instituto/Escuela/Facultad
Área de Conocimiento
Fecha de Defensa
Publicación
São Paulo, 2012
Director
Tribunal
Barros, Virginia Parente de (Presidente)
Reis, Lineu Belico dos
Tiago Filho, Geraldo Lúcio
Título en portugués
Análise de Viabilidade de Projetos de Pequenas Centrais Hidrelétricas: Pontos Críticos de Sucesso a Partir de Estudos de Caso no Estado de Santa Catarina
Palabras clave en portugués
Energia Renovável
Fluxo de Caixa
Pequena Central Hidrelétrica
Viabilidade
Resumen en portugués
MAKARON, Paula. Análise de Viabilidade de Projetos de Pequenas Centrais Hidrelétricas: Pontos Críticos de Sucesso a Partir de Estudos de Caso no Estado de Santa Catarina. 2012. 144f. Dissertação (Mestrado em Energia) - Programa de Pós-Graduação Em Energia - EP/FEA/IEE/IF da Universidade de São Paulo, São Paulo 2012. Esta dissertação analisa os pontos críticos de sucesso de projetos de Pequenas Centrais Hidrelétrica da perspectiva econômico-financeira. Para tal, foram percorridas três etapas. A primeira delas visou à análise dos contextos mundial e nacional desse segmento de geração de energia, seguindo os conceitos técnicos que caracterizam os empreendimentos de geração hidrelétricos de pequeno porte. Nessa etapa analisou-se o processo de implementação de uma PCH, desde o levantamento de potencias de aproveitamento de um rio até a sua entrada em operação comercial. A segunda etapa debruçou-se sobre a metodologia aplicada no cálculo da viabilidade de um projeto de infraestrutura e as adequações metodológicas necessárias para o caso de uma usina de pequeno porte. Tais adequações incluíram a seleção de componentes específicos do fluxo de caixa e de critérios para a escolha das variáveis-chave em projetos de PCHs. Outro importante conceito discutido nessa etapa foram os riscos inerentes a esses projetos e a forma como a materialização de cada risco pode afetar seus resultados. Por fim, na terceira etapa, à luz da teoria previamente visitada nas fases anteriores, foram analisados dois estudos de casos práticos de projetos reais localizados no Estado de Santa Catarina. Tais estudos de caso incluíram a análise de viabilidade para: (a) a construção da PCH Fartura e (b) a aquisição da PCH Santa Ana, estando essa última já em operação comercial. Em ambos os estudos foram testadas variações de algumas premissas tais como: o preço de venda da energia; o custo do capital; e aumento do custo da construção. Da análise realizada foi possível concluir que, no cenário do período estudado, a construção de uma PCH não é viável, o preço praticado nos ambientes livre e regulado de contratação não tem sido suficiente para pagar os investimentos realizados. Por outro lado, a compra de uma usina já em operação comercial se mostrou um ótimo negócio, uma vez que os principais riscos do período de construção já haviam sido superados no e a usina apresentava fluxo de receita garantido. Como as variáveis analisadas permeiam a maioria dos projetos de PCH, estima-se que este trabalho possa contribuir para o melhor entendimento da crise que o segmento de geração de pequenas usinas vem atravessando no Brasil nesses anos compreendidos entre 2008 e 2012.
Título en inglés
Feasibility Analysis of Small Hydro Power Projects: Critical Points of Success Drawn from Case Studies in the State of Santa Catarina.
Palabras clave en inglés
Cash Flow
Feasibility
Hydro Power Plant
Renewable Energy.
Resumen en inglés
MAKARON, Paula. Feasibility Analysis of Small Hydro Power Projects: Critical Points of Success Drawn from Case Studies in the State of Santa Catarina. 2012. 144f. Masters Dissertation Graduate Program on Energy, Universidade de São Paulo, São Paulo, 2012. This dissertation analyzes critical points of success of projects in Small Hydro Power Plants (SHP) from the economic/financial perspective. For this, three stages were drawn up. The first aimed at the analysis of world and national contexts of this segment of energy generation following the technical concepts which characterize the small-sized hydroelectric generating businesses. During this stage, the implementation process of a SHP was analyzed; starting with the survey of the potential of a river until the plant enters into commercial operation. The second stage focused on the methodology applied to calculating the viability of an infrastructure project and the necessary methodological adjustments for a small-sized plant. These adjustments include a selection of components specific to the cash flow and the criteria for choosing key-variants in SHC projects. Another important concept discussed during this stage was the inherent risks involved in these projects and the way in which each risk can affect the results. Finally, during the third stage, in light of the theory reviewed in previous stages, two practical case studies of real projects from the state of Santa Catarina were analyzed. Such case studies included the viability analysis for decision making regarding: (a) the construction of the SHP Fartura and (b) the acquisition of the SHP Santa Ana, the latter already in full commercial operation. In both studies, it was tested a variation of some key elements such as: the price of energy; the capital cost; the cost overruns. From the aforementioned analysis, it was possible to conclude that in studied scenario, the construction of a SHP is not viable. The energy price level in the free hiring and in the regulated environments has not been sufficient to pay back original investment. On the other hand, buying a plant already in commercial operation proved to be a good business proposition, once the main development risks during the construction period had been overcome and the plant presented a flow of guaranteed income. Seeming as the variables permeate most SHP projects, it is foreseen that this work can contribute to the better understanding of the crisis in which this segment of small generation plants are going through here in Brazil during the years 2008 to 2012.
 
ADVERTENCIA - La consulta de este documento queda condicionada a la aceptación de las siguientes condiciones de uso:
Este documento es únicamente para usos privados enmarcados en actividades de investigación y docencia. No se autoriza su reproducción con finalidades de lucro. Esta reserva de derechos afecta tanto los datos del documento como a sus contenidos. En la utilización o cita de partes del documento es obligado indicar el nombre de la persona autora.
Fecha de Publicación
2012-08-01
 
ADVERTENCIA: Aprenda que son los trabajos derivados haciendo clic aquí.
Todos los derechos de la tesis/disertación pertenecen a los autores
CeTI-SC/STI
Biblioteca Digital de Tesis y Disertaciones de la USP. Copyright © 2001-2024. Todos los derechos reservados.