• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Thèse de Doctorat
DOI
https://doi.org/10.11606/T.86.2009.tde-09062011-163554
Document
Auteur
Nom complet
Paulo Ernesto Strazzi
Adresse Mail
Unité de l'USP
Domain de Connaissance
Date de Soutenance
Editeur
São Paulo, 2009
Directeur
Jury
Guerra, Sinclair Mallet-guy (Président)
Penteado Junior, Aderbal de Arruda
Penteado, Claudio Luis de Camargo
Ribeiro, Fernando Selles
Scarpinella, Claudio Antonio
Titre en portugais
Desenvolvimento social e programas de eletrificação rural de não atendidos
Mots-clés en portugais
desenvolvimento social
eletrificação rural
energia e desenvolvimento.
planejamento energético
política pública
Resumé en portugais
O trabalho de pesquisa tem por objetivo estudar e oferecer uma nova política de eletrificação rural para o Estado de São Paulo, tendo por base o seguinte questionamento: cabe ao Estado de São Paulo manter política própria de eletrificação rural após a lei da universalização, nº 10.438/2002, do programa Luz para Todos e, ainda, do conjunto de Resoluções da ANEEL sobre o assunto? A abordagem do assunto tem por base a experiência do autor sobre o tema eletrificação rural, em especial com os programas desenvolvidos no Estado a partir de 1996, sob gestão ou coordenação da CERESP, órgão da Secretaria de Saneamento e Energia (SSE). A regulação da época previa que o interessado deveria pagar pelo custo de conexão à rede elétrica das concessionárias, assim, os programas desenvolvidos até então, tratavam de complexos sistemas de financiamento dessas conexões. As inovações desses programas contribuíram para a implantação da lei da universalização 10.438/2002 e do programa Luz para Todos. O programa Luz para Todos trata a universalização de modo diferente daquele determinado pela Resolução 456/2000, em que os benefícios concedidos aos interessados atendidos pelo programa são mais abrangentes daqueles permitidos pela regulação atual. A pesquisa mostra que esse é o diferencial que permite a real universalização do acesso ao serviço público de eletricidade no meio rural, de forma adequada. O programa será encerrado em dezembro de 2010, cabendo às concessionárias atender os interessados apenas pelos critérios da universalização. O trabalho aponta grande possibilidade de exclusão do acesso à eletricidade a partir desse momento, e propõe oferecer ao Estado uma pesquisa que indique caminhos que possibilite a São Paulo antecipar-se às consequências que virão com fim do Programa Luz para Todos. Trata-se, assim, de pesquisa que envolve experiência profissional e conhecimento acadêmico.
Titre en anglais
Social development and rural electrification programs not met
Mots-clés en anglais
development and energy.
energetic planning
public policy
rural electrification
social development
Resumé en anglais
The research work aims to study and provide a new policy of rural electrification in the State of Sao Paulo, based on the following question: "the State of Sao Paulo must maintain its own policy of rural electrification after the universal law, nº 10.438/2002, the Light for All program and also the set of resolutions by ANEEL on the matter?" The approach to the subject is based on the author's experience on the subject of rural electrification, especially through programs developed in the state since 1996, under the management or coordination of CERESP, organ of the SSE. The regulation of time provided that the person should pay for the cost of grid connection to the utilities power grids, therefore the programs developed so far, dealt with complex financial systems of these connections. The innovations of these programs contributed to the implementation of the law universal nº 10438/2002 and the Light for All program. The Light for All Program is universal and so different from that determined by ANEEL Resolution 456/2000, where the benefits granted to persons enrolled in the program are the most comprehensive of those allowed by current regulation. Research shows that this is the differential that allows the real universal access to public electricity in rural areas, as appropriate. The program will end in December 2010, leaving it to dealers only meet the criteria of universality. The work shows great possibility of exclusion from access to electricity from that time, and proposes giving the state a survey indicating that enable paths to Sao Paulo to anticipate the consequences that come with the end of the Light for All Program. Therefore, it is a research that involves work experience and academic knowledge.
 
AVERTISSEMENT - Regarde ce document est soumise à votre acceptation des conditions d'utilisation suivantes:
Ce document est uniquement à des fins privées pour la recherche et l'enseignement. Reproduction à des fins commerciales est interdite. Cette droits couvrent l'ensemble des données sur ce document ainsi que son contenu. Toute utilisation ou de copie de ce document, en totalité ou en partie, doit inclure le nom de l'auteur.
TESE_PauloStrazzi.pdf (2.05 Mbytes)
Date de Publication
2011-06-20
 
AVERTISSEMENT: Apprenez ce que sont des œvres dérivées cliquant ici.
Tous droits de la thèse/dissertation appartiennent aux auteurs
CeTI-SC/STI
Bibliothèque Numérique de Thèses et Mémoires de l'USP. Copyright © 2001-2024. Tous droits réservés.