Mémoire de Maîtrise
DOI
https://doi.org/10.11606/D.55.2010.tde-17112010-101418
Document
Auteur
Nom complet
Marcio Antonio Ferreira Belo Filho
Adresse Mail
Unité de l'USP
Domain de Connaissance
Date de Soutenance
Editeur
São Carlos, 2010
Directeur
Jury
Santos, Maristela Oliveira dos (Président)
Meneses, Cláudio Nogueira de
Toledo, Franklina Maria Bragion de
Titre en portugais
Programação de produção e dimensionamento de lotes para flowshop
Mots-clés en portugais
Dimensionamento de lotes
Flowshop
Programação de produção
Times assíncronos
Resumé en portugais
O problema integrado de programação de produção e dimensionamento de lotes em ambiente fowshop consiste em estabelecer tamanhos de lotes de produção e alocar máquinas para processá-los dentro de um horizonte de planejamento, em uma linha de produção com máquinas dispostas em série. O problema considera que a demanda deve ser atendida sem atrasos, que a capacidade das máquinas deve ser respeitada e que as preparações de máquinas são dependentes da sequência de produção e preservadas entre períodos do horizonte de planejamento. O objetivo é determinar uma programação de produção visando minimizar os custos de preparação de máquina, de produção e de estoque. Um modelo matemático da literatura é apresentado assim como procedimentos para obtenção de limitantes inferiores. Além disso, abordamos o problema por meio de distintas versões da metaheurística Times Assíncronos (A-Teams). Os procedimentos propostos foram comparados com heurísticas da literatura baseadas em Programação Inteira Mista (MIP). As metodologias desenvolvidas e os resultados obtidos são apresentados nesta dissertação
Titre en anglais
Production scheduling and lot sizing for flowshop
Mots-clés en anglais
Assunchronous teams
Flowshop
Lot sizing
Production scheduling
Resumé en anglais
The integrated production scheduling and lot sizing problem in a fowshop environment consists in establishing production lot sizes and alocate machines to process them inside a planning horizon, in a production line with machines arranged in series. The problem considers that demand must be met without backlogging, the capacity of the machines must be respected, machine setup are sequence-dependent and preserved between periods of the planning horizon. The objective is to determine a production schedule to minimize the setup, production and inventory costs. A mathematical model from the literature is presented as well as procedures for obtaining lower bounds. In addition, we propose to address the problem through different versions of the metaheuristic Asynchronous Teams (A-Teams). The procedures were compared with literature heuristics based on Mixed Integer Programming (MIP). The developed methodologies and the obtained results are presented in this dissertation
 
AVERTISSEMENT - Regarde ce document est soumise à votre acceptation des conditions d'utilisation suivantes:
Ce document est uniquement à des fins privées pour la recherche et l'enseignement. Reproduction à des fins commerciales est interdite. Cette droits couvrent l'ensemble des données sur ce document ainsi que son contenu. Toute utilisation ou de copie de ce document, en totalité ou en partie, doit inclure le nom de l'auteur.
Defesa_Marcio.pdf (788.16 Kbytes)
Date de Publication
2010-11-17
 
AVERTISSEMENT: Apprenez ce que sont des œvres dérivées cliquant ici.
Tous droits de la thèse/dissertation appartiennent aux auteurs
CeTI-SC/STI
Bibliothèque Numérique de Thèses et Mémoires de l'USP. Copyright © 2001-2024. Tous droits réservés.