• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Thèse de Doctorat
DOI
https://doi.org/10.11606/T.55.2014.tde-12032015-161656
Document
Auteur
Nom complet
Tamara Angélica Baldo
Unité de l'USP
Domain de Connaissance
Date de Soutenance
Editeur
São Carlos, 2014
Directeur
Jury
Morabito Neto, Reinaldo (Président)
França, Paulo Morelato
Rangel, Maria do Socorro Nogueira
Toledo, Franklina Maria Bragion de
Toso, Eli Angela Vitor
Titre en portugais
O problema integrado de dimensionamento e sequenciamento de lotes no processo de fabricação da cerveja: modelos e métodos de solução
Mots-clés en portugais
Dimensionamento de lotes e sequenciamento
Grasp
Indústria cervejeira
MIP-heurísticas
Planejamento e programação da produção multiestágio
Programação inteira mista
Resumé en portugais
Este trabalho aborda o problema multiestágio de planejamento e programação da produção em indústrias cervejeiras. O processo de fabricação de cerveja pode ser dividido em duas etapas principais: preparação do líquido e envase. A primeira etapa ocorre, na maior parte do tempo, dentro de tanques de fermentação e maturação. A segunda ocorre nas linhas de envase, podendo ter início assim que o líquido estiver pronto nos tanques. O tempo de preparação do líquido demora vários dias, enquanto que na maioria das indústrias de bebidas carbonatadas este tempo é de no máximo algumas horas. O objetivo deste estudo é obter planos de produção viáveis que visam otimizar as decisões de programação envolvidas nestes processos. Visitas a cervejarias no Brasil e em Portugal foram realizadas para uma maior familiaridade do processo de produção e dados foram coletados. Modelos de programação inteira mista para representar o problema foram desenvolvidos, baseados em abordagens CSLP (The Continuous Setup Lot-Sizing Problem), GLSP (General Lot Sizing and Scheduling Problem), SPL (Simple Plant Location Problem) e ATSP (Asymmetric Travelling Salesman Problem). Os resultados mostram que os modelos são coerentes e representam adequadamente o problema, entretanto, mostram-se difíceis de serem resolvidos na otimalidade. Esta dificuldade de resolução dos modelos motivou o desenvolvimento de procedimentos MIP-heurísticos, como também de uma metaheurística GRASP (Greedy Randomized Adaptive Search Procedure). As soluções obtidas pelos procedimentos heurísticos são de boa qualidade, quando comparadas ao melhor limitante inferior encontrado por meio da resolução dos modelos matemáticos. Os testes computacionais foram realizados utilizando instâncias geradas com base em dados reais.
Titre en anglais
The integrated lot sizing and scheduling problem in the brewing process: models and solution methods
Mots-clés en anglais
Brewery industry
GRASP
MIP-heuristic
MIxed integer mathematical model
Multistage lot-sizing and scheduling problem
Resumé en anglais
This study deals with the multistage lot-sizing and scheduling problem in breweries. The brewing process can be divided into two main stages: preparation and filling of the liquid. The first stage occurs most of the time in fermentation and maturation tanks. The second stage occurs in the filling lines and it can start as soon as the liquid gets ready. The preparation time of the liquid takes several days, while in the carbonated beverage industries this time is at most a few hours. The purpose of this study is to obtain feasible production plans aimed at optimizing the decisions involved in these processes. Visits to brewery industries in Brazil and Portugal were held to a greater familiarity of the production process and data were collected. Mixed integer programming models have been developed to represent the problem, based on approaches for the CSLP (The Continuous Setup Lot-Sizing Problem), GLSP (General Lot Sizing and Scheduling Problem), SPL (Simple Plant Location Problem) and ATSP (Asymmetric Travelling Salesman Problem). The results show that the models are consistent and adequately represent the problem; however, they are difficult to be solved at optimality. This motivated the development of MIP-heuristic procedures, as well as a meta-heuristic GRASP (Greedy Randomized Adaptive Search Procedure). The obtained solutions by the heuristics are of good quality, when compared to the best lower bound found by solving the mathematical models. The tests were conducted using generated instances based on real data.
 
AVERTISSEMENT - Regarde ce document est soumise à votre acceptation des conditions d'utilisation suivantes:
Ce document est uniquement à des fins privées pour la recherche et l'enseignement. Reproduction à des fins commerciales est interdite. Cette droits couvrent l'ensemble des données sur ce document ainsi que son contenu. Toute utilisation ou de copie de ce document, en totalité ou en partie, doit inclure le nom de l'auteur.
Date de Publication
2015-03-17
 
AVERTISSEMENT: Apprenez ce que sont des œvres dérivées cliquant ici.
Tous droits de la thèse/dissertation appartiennent aux auteurs
CeTI-SC/STI
Bibliothèque Numérique de Thèses et Mémoires de l'USP. Copyright © 2001-2024. Tous droits réservés.