Thèse de Doctorat
DOI
https://doi.org/10.11606/T.44.2002.tde-15042015-142727
Document
Auteur
Nom complet
Adalberto Aurelio Azevedo
Unité de l'USP
Domain de Connaissance
Date de Soutenance
Editeur
São Paulo, 2002
Directeur
Jury
Taioli, Fabio (Président)
Carvalho, Celso Santos
Celestino, Tarcisio Barreto
Iyomasa, Wilson Shoji
Yamamoto, Jorge Kazuo
Titre en portugais
A incorporação de incertezas de natureza geológica no projeto e construção de túneis urbanos: proposta metodológica baseada na teoria da decisão
Mots-clés en portugais
São Paulo (SP)
Teoria da Decisão (Administração Executiva)
Túneis Urbanos
Resumé en portugais
Acidentes em obras de engenharia são frequentemente atribuídos a "imprevistos ou surpresas geológicas". Tal denominação denota um desconhecimento relativo da geologia dos maciços rochosos nos quais estas obras são implantadas. Este desconhecimento traduz o quadro de incertezas que permeia o ambiente geológico, responsável por inúmeros insucessos em obras de engenharia. Em vista das dificuldades que o meio técnico encontra para equacionar o problema o estudo propõe a incorporação destas incertezas ao projeto e construção de túneis em áreas urbanas, através da análise de decisão. A metodologia e o modelo de decisão propostos envolveram uma estratégia para redução do risco, apoiada em dois princípios básicos: reduzir as incertezas através da obtenção de um maior número de informações geológicas do maciço ou limitar o impacto das incertezas no desempenho técnico e econômico do projeto, adotando-se alternativas de construção que, em princípio, podem parecer mais caras. A aplicação do modelo de decisão exige a estimativa de probabilidades da ocorrência de eventos aleatórios, que são tratadas segundo os princípios da Teoria das Probabilidades, em sua visão subjetiva. A proposta metodológica desenvolvida foi aplicada na região das marginais do rio Pinheiros, correspondente a um subtrecho do túnel da Linha 4 - Amarela, da Companhia do Metropolitano de São Paulo - METRO, atualmente em processo de licitação. O trecho analisado foi caracterizado como de alto risco nas análises efetuadas, e os resultados obtidos demonstraram que o modelo de decisão adotado foi capaz de diferenciar a melhor alternativa para redução do risco bem como indicar o método de escavação do túnel que, frente ao critério de risco inicialmente estabelecido, fosse o mais econômico.
Titre en anglais
Not available.
Mots-clés en anglais
Not available.
Resumé en anglais
Failures in engineering works are always attributed to geological uncertainty. These facts denote that there is a significant lack of knowledge of the rock mass behavior where the works are developed. This lack of knowledge reflects the uncertainty associated to the geological environment, and responsible for several accidents in civil works. Aiming at solving that problem, this thesis proposes to incorporate these uncertainties in the design and construction of tunnels in urban areas, using decision theory. The methodology and decision model suggested evolves a risk reduction strategy based on two basic principles: 1) to reduce the uncertainty through the addition of more geologic information (obtained by more investigation) and 2) to limit the impact of the uncertainty in the technical and economical performance of the design, adopting construction alternatives that, initially, may appear more expensive. The application of the decision model implies the estimation of the probabilities that aleatory events may occur, which are analyzed according the Probability Theory in its subjective approach. The methodology here proposed was applied in the region of the marginal Rio Pinheiros avenue, corresponding to a portion of the Line 4 - Yellow, of the Metropolitano de São Paulo - METRO. The portion submitted to the analysis showed to be of high risk and the results obtained demonstrated that the decision model proposed and adopted was able to differ the best alternative to reduce the risk, as well as to indicate the most appropriate construction method considering the risk criterion initially established.
 
AVERTISSEMENT - Regarde ce document est soumise à votre acceptation des conditions d'utilisation suivantes:
Ce document est uniquement à des fins privées pour la recherche et l'enseignement. Reproduction à des fins commerciales est interdite. Cette droits couvrent l'ensemble des données sur ce document ainsi que son contenu. Toute utilisation ou de copie de ce document, en totalité ou en partie, doit inclure le nom de l'auteur.
Azevedo_Doutorado.pdf (20.65 Mbytes)
Date de Publication
2015-04-23
 
AVERTISSEMENT: Apprenez ce que sont des œvres dérivées cliquant ici.
Tous droits de la thèse/dissertation appartiennent aux auteurs
CeTI-SC/STI
Bibliothèque Numérique de Thèses et Mémoires de l'USP. Copyright © 2001-2024. Tous droits réservés.