• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Dissertação de Mestrado
DOI
https://doi.org/10.11606/D.3.2006.tde-05092006-141310
Documento
Autor
Nome completo
Ricardo Basile Pucci
E-mail
Unidade da USP
Área do Conhecimento
Data de Defesa
Imprenta
São Paulo, 2006
Orientador
Banca examinadora
Gualda, Nicolau Dionisio Fares (Presidente)
John, Vanderley Moacyr
Silva, Vanessa Gomes da
Título em português
Logística de resíduos da construção civil atendendo à resolução CONAMA 307.
Palavras-chave em português
logística (administração de materiais)
reciclagem de resíduos urbanos
resíduos de construção
simulação
Resumo em português
O Resíduo de Construção e Demolição (RCD), devido ao seu volume, gera um alto impacto ambiental, social e econômico, trazendo assim a preocupação crescente sobre sua gestão. Essa gestão sempre foi responsabilidade do poder público. Porém, com a Resolução 307 do Conselho Nacional do Meio Ambiente (CONAMA), de 05 de julho de 2002, ela foi transferida para os geradores de resíduos, que devem segregar o resíduo em quatro classes diferentes e encaminhá-las para reciclagem ou deposição final. Assim, este trabalho propõe uma metodologia, baseada no enfoque sistêmico e em técnicas de pesquisa operacional, para tratar o problema de gestão de resíduos da Construção Civil, em conformidade com a Resolução CONAMA 307. A metodologia proposta compreende a elaboração de um Plano de Gestão de Resíduos que contemple a fase de projeto, minimizando a geração de resíduos; a segregação e o transporte do resíduo gerado dentro da obra; e a sua destinação final, incluíndo o controle da segregação e deposição do resíduo gerado. No trabalho são comparadas duas obras, uma onde não houve nenhuma forma de gestão sobre o resíduo e outra onde o Plano de Gestão proposto foi aplicado. Além disso, foi feito um modelo de simulação utilizando o programa de computador Arena 7.0, utilizado para avaliação do impacto do Plano em diversos cenários de geração, segrega ção e transporte dos resíduos. Como resultado do trabalho apresenta-se um Plano de Gestão de Resíduos que possui viabilidade econômica, social e ambiental, além de ser legalmente adequado, para ser usado por profissionais do setor público e privado no tratamento e gestão do resíduo gerado em suas obras.
Título em inglês
The logistic of construction waste according to CONAMA 307 resolution.
Palavras-chave em inglês
construction waste
logistic (materials management)
simulation
urban waste recycling
Resumo em inglês
The Construction and Demolition Waste (C&DW), because of its high volume, brings high environmental social and economical impacts, therefore the worries about its management has grown. This management has always been responsibility of the governments. But with the Resolution 307 of CONAMA (Brazilian Environmental National Council) of July 22nd, 2002, it was transferred to the waste producer, which has to segregate it in four different categories and ship it to be recycled or disposed properly. The proposal is to create a method, based on system approach and operations research, to deal with C&DW management, respecting Resolution 307 guidelines. The proposed method encompasses the creation of a Waste Management Plan, whichconsiders the aspects of the project, to minimize waste generation; the segregation and transport within the construction site; and the final destination of the waste, including a method to control its segregation and shipping. Two construction sites were considered, one that did not have any kind of waste management and one on which the Management Plan was implemented. In addition, it was developed a simulation model using the computer software Arena 7.0, to analyze the Plan under different scenarios of generation, segregation and shipping of construction waste. As a result, a Plan of C&DW Management was proposed and validated, which is economic, social and environmental feasible and legally adequate, to be used by public and private professionals when dealing with the C&DW of their constructions.
 
AVISO - A consulta a este documento fica condicionada na aceitação das seguintes condições de uso:
Este trabalho é somente para uso privado de atividades de pesquisa e ensino. Não é autorizada sua reprodução para quaisquer fins lucrativos. Esta reserva de direitos abrange a todos os dados do documento bem como seu conteúdo. Na utilização ou citação de partes do documento é obrigatório mencionar nome da pessoa autora do trabalho.
Data de Publicação
2006-09-13
 
AVISO: Saiba o que são os trabalhos decorrentes clicando aqui.
Todos os direitos da tese/dissertação são de seus autores
CeTI-SC/STI
Biblioteca Digital de Teses e Dissertações da USP. Copyright © 2001-2024. Todos os direitos reservados.