• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Mémoire de Maîtrise
DOI
https://doi.org/10.11606/D.3.2006.tde-05092006-141310
Document
Auteur
Nom complet
Ricardo Basile Pucci
Adresse Mail
Unité de l'USP
Domain de Connaissance
Date de Soutenance
Editeur
São Paulo, 2006
Directeur
Jury
Gualda, Nicolau Dionisio Fares (Président)
John, Vanderley Moacyr
Silva, Vanessa Gomes da
Titre en portugais
Logística de resíduos da construção civil atendendo à resolução CONAMA 307.
Mots-clés en portugais
logística (administração de materiais)
reciclagem de resíduos urbanos
resíduos de construção
simulação
Resumé en portugais
O Resíduo de Construção e Demolição (RCD), devido ao seu volume, gera um alto impacto ambiental, social e econômico, trazendo assim a preocupação crescente sobre sua gestão. Essa gestão sempre foi responsabilidade do poder público. Porém, com a Resolução 307 do Conselho Nacional do Meio Ambiente (CONAMA), de 05 de julho de 2002, ela foi transferida para os geradores de resíduos, que devem segregar o resíduo em quatro classes diferentes e encaminhá-las para reciclagem ou deposição final. Assim, este trabalho propõe uma metodologia, baseada no enfoque sistêmico e em técnicas de pesquisa operacional, para tratar o problema de gestão de resíduos da Construção Civil, em conformidade com a Resolução CONAMA 307. A metodologia proposta compreende a elaboração de um Plano de Gestão de Resíduos que contemple a fase de projeto, minimizando a geração de resíduos; a segregação e o transporte do resíduo gerado dentro da obra; e a sua destinação final, incluíndo o controle da segregação e deposição do resíduo gerado. No trabalho são comparadas duas obras, uma onde não houve nenhuma forma de gestão sobre o resíduo e outra onde o Plano de Gestão proposto foi aplicado. Além disso, foi feito um modelo de simulação utilizando o programa de computador Arena 7.0, utilizado para avaliação do impacto do Plano em diversos cenários de geração, segrega ção e transporte dos resíduos. Como resultado do trabalho apresenta-se um Plano de Gestão de Resíduos que possui viabilidade econômica, social e ambiental, além de ser legalmente adequado, para ser usado por profissionais do setor público e privado no tratamento e gestão do resíduo gerado em suas obras.
Titre en anglais
The logistic of construction waste according to CONAMA 307 resolution.
Mots-clés en anglais
construction waste
logistic (materials management)
simulation
urban waste recycling
Resumé en anglais
The Construction and Demolition Waste (C&DW), because of its high volume, brings high environmental social and economical impacts, therefore the worries about its management has grown. This management has always been responsibility of the governments. But with the Resolution 307 of CONAMA (Brazilian Environmental National Council) of July 22nd, 2002, it was transferred to the waste producer, which has to segregate it in four different categories and ship it to be recycled or disposed properly. The proposal is to create a method, based on system approach and operations research, to deal with C&DW management, respecting Resolution 307 guidelines. The proposed method encompasses the creation of a Waste Management Plan, whichconsiders the aspects of the project, to minimize waste generation; the segregation and transport within the construction site; and the final destination of the waste, including a method to control its segregation and shipping. Two construction sites were considered, one that did not have any kind of waste management and one on which the Management Plan was implemented. In addition, it was developed a simulation model using the computer software Arena 7.0, to analyze the Plan under different scenarios of generation, segregation and shipping of construction waste. As a result, a Plan of C&DW Management was proposed and validated, which is economic, social and environmental feasible and legally adequate, to be used by public and private professionals when dealing with the C&DW of their constructions.
 
AVERTISSEMENT - Regarde ce document est soumise à votre acceptation des conditions d'utilisation suivantes:
Ce document est uniquement à des fins privées pour la recherche et l'enseignement. Reproduction à des fins commerciales est interdite. Cette droits couvrent l'ensemble des données sur ce document ainsi que son contenu. Toute utilisation ou de copie de ce document, en totalité ou en partie, doit inclure le nom de l'auteur.
Date de Publication
2006-09-13
 
AVERTISSEMENT: Apprenez ce que sont des œvres dérivées cliquant ici.
Tous droits de la thèse/dissertation appartiennent aux auteurs
CeTI-SC/STI
Bibliothèque Numérique de Thèses et Mémoires de l'USP. Copyright © 2001-2024. Tous droits réservés.