Master's Dissertation
DOI
https://doi.org/10.11606/D.3.2006.tde-05092006-141310
Document
Author
Full name
Ricardo Basile Pucci
E-mail
Institute/School/College
Knowledge Area
Date of Defense
Published
São Paulo, 2006
Supervisor
Committee
Gualda, Nicolau Dionisio Fares (President)
John, Vanderley Moacyr
Silva, Vanessa Gomes da
Title in Portuguese
Logística de resíduos da construção civil atendendo à resolução CONAMA 307.
Keywords in Portuguese
logística (administração de materiais)
reciclagem de resíduos urbanos
resíduos de construção
simulação
Abstract in Portuguese
O Resíduo de Construção e Demolição (RCD), devido ao seu volume, gera um alto impacto ambiental, social e econômico, trazendo assim a preocupação crescente sobre sua gestão. Essa gestão sempre foi responsabilidade do poder público. Porém, com a Resolução 307 do Conselho Nacional do Meio Ambiente (CONAMA), de 05 de julho de 2002, ela foi transferida para os geradores de resíduos, que devem segregar o resíduo em quatro classes diferentes e encaminhá-las para reciclagem ou deposição final. Assim, este trabalho propõe uma metodologia, baseada no enfoque sistêmico e em técnicas de pesquisa operacional, para tratar o problema de gestão de resíduos da Construção Civil, em conformidade com a Resolução CONAMA 307. A metodologia proposta compreende a elaboração de um Plano de Gestão de Resíduos que contemple a fase de projeto, minimizando a geração de resíduos; a segregação e o transporte do resíduo gerado dentro da obra; e a sua destinação final, incluíndo o controle da segregação e deposição do resíduo gerado. No trabalho são comparadas duas obras, uma onde não houve nenhuma forma de gestão sobre o resíduo e outra onde o Plano de Gestão proposto foi aplicado. Além disso, foi feito um modelo de simulação utilizando o programa de computador Arena 7.0, utilizado para avaliação do impacto do Plano em diversos cenários de geração, segrega ção e transporte dos resíduos. Como resultado do trabalho apresenta-se um Plano de Gestão de Resíduos que possui viabilidade econômica, social e ambiental, além de ser legalmente adequado, para ser usado por profissionais do setor público e privado no tratamento e gestão do resíduo gerado em suas obras.
Title in English
The logistic of construction waste according to CONAMA 307 resolution.
Keywords in English
construction waste
logistic (materials management)
simulation
urban waste recycling
Abstract in English
The Construction and Demolition Waste (C&DW), because of its high volume, brings high environmental social and economical impacts, therefore the worries about its management has grown. This management has always been responsibility of the governments. But with the Resolution 307 of CONAMA (Brazilian Environmental National Council) of July 22nd, 2002, it was transferred to the waste producer, which has to segregate it in four different categories and ship it to be recycled or disposed properly. The proposal is to create a method, based on system approach and operations research, to deal with C&DW management, respecting Resolution 307 guidelines. The proposed method encompasses the creation of a Waste Management Plan, whichconsiders the aspects of the project, to minimize waste generation; the segregation and transport within the construction site; and the final destination of the waste, including a method to control its segregation and shipping. Two construction sites were considered, one that did not have any kind of waste management and one on which the Management Plan was implemented. In addition, it was developed a simulation model using the computer software Arena 7.0, to analyze the Plan under different scenarios of generation, segregation and shipping of construction waste. As a result, a Plan of C&DW Management was proposed and validated, which is economic, social and environmental feasible and legally adequate, to be used by public and private professionals when dealing with the C&DW of their constructions.
 
WARNING - Viewing this document is conditioned on your acceptance of the following terms of use:
This document is only for private use for research and teaching activities. Reproduction for commercial use is forbidden. This rights cover the whole data about this document as well as its contents. Any uses or copies of this document in whole or in part must include the author's name.
Publishing Date
2006-09-13
 
WARNING: Learn what derived works are clicking here.