• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Disertación de Maestría
DOI
https://doi.org/10.11606/D.3.2004.tde-11042005-100645
Documento
Autor
Nombre completo
Manuel Romero De La Iglesia
Dirección Electrónica
Instituto/Escuela/Facultad
Área de Conocimiento
Fecha de Defensa
Publicación
São Paulo, 2004
Director
Tribunal
Piveli, Roque Passos (Presidente)
Além Sobrinho, Pedro
Chernicharo, Carlos Augusto de Lemos
Título en portugués
Avaliação de um sistema piloto composto de reator UASB seguido de lagoa aerada aeróbia e lagoa de decantação no tratamento de esgotos sanitários com elevada contribuição de despejos industriais.
Palabras clave en portugués
Decantação
Lagoa aerada
Pós-tratamento
Reator UASB
Tratamento de esgoto sanitário
Resumen en portugués
Este trabalho experimental apresenta os resultados da avaliação do desempenho de uma instalação piloto, composta por reator UASB seguido de lagoa aerada aeróbia e lagoa de decantação, no tratamento dos esgotos afluente a ETE - Jundiaí, que contém elevada contribuição de despejos industriais. O reator UASB e a lagoa de decantação tem volume útil de 3,0 m3 e 2,0 m3, respectivamente. O volume da lagoa aerada aeróbia é variável entre 7,2 m3 e 21,6 m3 de modo a permitir variar o tempo de detenção hidráulica. O sistema foi avaliado em termos da eficiência de remoção de DQO, DBO5, sólidos suspensos, nitrogênio total, fósforo total e cor verdadeira para tempos de detenção hidráulica na lagoa aerada aeróbia variando entre 1,0 e 3,5 dias mantendo, tanto no reator UASB quanto, na lagoa de decantação o tempo de detenção constante em 8,0 horas e 1,8 dia, respectivamente. O sistema completo apresentou uma eficiência de remoção de DQO total entre 85% e 87%, de DBO5 total entre 92% e 96%, de SST entre 81% e 87%, de SSV entre 80 e 88%, de nitrogênio total entre 55 e 57%, de fósforo total entre 60 e 70% e de cor verdadeira entre 50 e 60%, para tempos de detenção hidráulica na lagoa aerada aeróbia variando entre 1,5 e 3,5 dias. O reator UASB foi responsável pela remoção de cerca de 50% da DQO total, 60% da DBO5 total e 40% dos SST do afluente, operando em média com um tempo de detenção hidráulica de 8,0 horas. As eficiências alcançadas no sistema completo produziram um efluente final com uma concentração de DQO total entre 170 e 230 mg/L, de DBO5 total entre 30 e 60 mg/L, de SST entre 30 e 45 mg/L, de SSV entre 24 e 40 mg/L, de nitrogênio total entre 24 e 28 mg NH3/L, de fósforo total entre 3,5 e 5,5 mg P/L e de cor verdadeira entre 375 e 600 mg Pt/L. O sistema pesquisado mostrou-se uma alternativa viável para o tratamento do esgoto afluente à ETE - Jundiaí e poderá resultar em redução da área e em menor consumo de energia que os hoje necessários na ETE - Jundiaí, que emprega um sistema composto por lagoas aeradas aeróbias seguidas de lagoas de decantação.
Título en inglés
Treatment of sewage containing expressive amount of industrial effluents in a pilot plant system consisted of an UASB reactor followed by an aerated lagoon and a settling pond.
Palabras clave en inglés
Aerated lagoon
Anaerobic sewage treatment
Post-treatment
Settling pond
UASB reactor
Resumen en inglés
This experimental investigation was carried out in order to evaluate the performance of a pilot plant, composed of an UASB reactor followed by an aerated lagoon and a settling pond, treating the Wastewater Treatment Plant of Jundiaí city (WWTPJ) influent sewage, which contains in its composition an expressive amount of industrial effluents. The UASB reactor and settling pond have an useful volume of 3.0 m3 and 2.0 m3, respectively. The aerated lagoon volume is variable from 7.2 m3 to 21.6 m3 to make possible the hydraulic retention time variation. The COD, BOD5, suspended solids, total nitrogen, total phosphorus and true colour removal efficiencies of the system were evaluated when the aerated lagoon hydraulic retention time varied from 1.0 to 3.5 days and in the UASB reactor and settling pond was mainteined constant at 8.0 hours and 1.8 day, respectively. The range of removal efficiencies obtained in the system are: 85 - 87% for total COD, 92 - 96% for total BOD5, 81 - 87% for TSS, 80 - 88% for VSS, 55 - 57% for total nitrogen, 60 - 70% for total phosphorus, and 50 - 60% for true color, when the aerated lagoon hydraulic retention time varied from 1.5 to 3.5 days. The UASB reactor operating at 8.0 hours hydraulic retention time removes almost 50% of total COD, 60% of total BOD5 and 40% of TSS from the influent contents. The system performance lead to a final effluent with a total COD, total BOD5, TSS, VSS, total nitrogen, total phosphorus, and true color concentrations in the range of: 170 - 230 mg/L, 30 - 60 mg/L and 30 - 45 mg/L, 24 - 40 mg/L, 24 - 28 mg N/L, 3,5 - 5,5 mg P/L and 375 - 600 mg Pt/L, respectively. The system studied is a practicable alternative for the treatment of the WWTPJ influent sewage, probably with less area and energy saving whem compared to the WWTPJ current needs, which uses a system composed by an aerated lagoon followed by a settling pond
 
ADVERTENCIA - La consulta de este documento queda condicionada a la aceptación de las siguientes condiciones de uso:
Este documento es únicamente para usos privados enmarcados en actividades de investigación y docencia. No se autoriza su reproducción con finalidades de lucro. Esta reserva de derechos afecta tanto los datos del documento como a sus contenidos. En la utilización o cita de partes del documento es obligado indicar el nombre de la persona autora.
Fecha de Publicación
2010-05-19
 
ADVERTENCIA: Aprenda que son los trabajos derivados haciendo clic aquí.
Todos los derechos de la tesis/disertación pertenecen a los autores
CeTI-SC/STI
Biblioteca Digital de Tesis y Disertaciones de la USP. Copyright © 2001-2024. Todos los derechos reservados.