• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Disertación de Maestría
DOI
https://doi.org/10.11606/D.3.2013.tde-10072014-011903
Documento
Autor
Nombre completo
Roberto Sarti Côrtes
Dirección Electrónica
Instituto/Escuela/Facultad
Área de Conocimiento
Fecha de Defensa
Publicación
São Paulo, 2013
Director
Tribunal
Zambon, Renato Carlos (Presidente)
Barbosa, Paulo Sérgio Franco
Francato, Alberto Luiz
Título en portugués
Otimização robusta aplicada à operação de reservatórios para a geração de energia.
Palabras clave en portugués
Geração de energia
Otimização robusta
Reservatórios
Resumen en portugués
Este trabalho tem como objetivo avaliar a viabilidade da aplicação de técnicas de otimização robusta (OR) no planejamento da operação de reservatórios para geração de energia hidrelétrica. A OR é uma técnica de otimização que visa encontrar resultados que sejam menos sensíveis às incertezas nas variáveis do modelo através da minimização da variância da função objetivo para diferentes cenários. Desta forma foi desenvolvido um modelo de otimização robusta aplicado à operação de reservatórios para a geração de energia hidrelétrica, chamado HIDRO-OR, utilizando o software General Algebraic Modeling System (GAMS). Para estudo de caso foram utilizados os dados da UHE Sinop, a ser instalada no rio Teles Pires MT. Inicialmente foi realizada uma análise de sensibilidade utilizando diferentes combinações dos coeficientes de ponderação da função objetivo e três conjuntos de cenários. Nesta abordagem, o modelo resultou em vertimentos indesejados para realizar a diminuição do desvio padrão dos resultados entre os diferentes cenários. Uma solução encontrada para o problema foi realizar a otimização em duas etapas. Na primeira etapa ocorre a otimização robusta propriamente dita e são fixados os resultados para o primeiro mês de operação. Na segunda etapa, apenas a função objetivo principal é otimizada e, assim, são corrigidos os vertimentos indesejados. No entanto, com a otimização em duas etapas, não ocorreram mudanças na operação do reservatório para os diferentes coeficientes de ponderação. Ao final do trabalho conclui-se que, apesar dos resultados da análise de sensibilidade terem sido praticamente iguais com a otimização em duas etapas, estes podem ser considerados robustos pois são factíveis para todos os cenários. Por fim, são realizadas sugestões para a continuidade das pesquisas utilizando as técnicas de OR para a operação de usinas hidrelétricas.
Título en inglés
Robust optimization applied to reservoirs operation for hydropower generation.
Palabras clave en inglés
Power generation
Reservoirs
Robust optimization
Resumen en inglés
This work aims to evaluate the feasibility of robust optimization techniques (OR) for reservoir management for hydropower production. The OR is an optimization technique which aims to find results that are less sensitive to the randomness of variables in the model by minimizing the variance of the objective function for different scenarios. One OR model was developed to the operation of reservoirs for hydropower production, called HYDRO-OR, using the software General Algebraic Modeling System (GAMS). As study case, data from the Sinop hydropower plant were used, which will be constructed in the Teles Pires river - MT. First, a sensitivity analysis was performed using different combinations of weigh coefficients of the objective function with three sets of scenarios. Preliminary results in this approach showed that the model resulted in unwanted spills to force the reduction of the standard deviation of the results from different scenarios. To correct this, the model was reconfigured to perform the optimization in two stages, the first one being the OR itself in which the results were obtained for the first month of planning. In the second step, the model was optimized again for subsequent months. In this case the model corrected the unnecessary spills but the results were quite similar for the three combinations of the weight coefficients. However the results can be considered robust because it is feasible for all scenarios. Finally, suggestions are made for further studies using the techniques of OR for the operation of hydropower plants.
 
ADVERTENCIA - La consulta de este documento queda condicionada a la aceptación de las siguientes condiciones de uso:
Este documento es únicamente para usos privados enmarcados en actividades de investigación y docencia. No se autoriza su reproducción con finalidades de lucro. Esta reserva de derechos afecta tanto los datos del documento como a sus contenidos. En la utilización o cita de partes del documento es obligado indicar el nombre de la persona autora.
Fecha de Publicación
2014-07-15
 
ADVERTENCIA: Aprenda que son los trabajos derivados haciendo clic aquí.
Todos los derechos de la tesis/disertación pertenecen a los autores
CeTI-SC/STI
Biblioteca Digital de Tesis y Disertaciones de la USP. Copyright © 2001-2024. Todos los derechos reservados.