Mémoire de Maîtrise
DOI
https://doi.org/10.11606/D.3.2006.tde-08122006-164741
Document
Auteur
Nom complet
Gabriel dos Santos Cruz Rocha
Adresse Mail
Unité de l'USP
Domain de Connaissance
Date de Soutenance
Editeur
São Paulo, 2006
Directeur
Jury
Tamada, Kikuo (Président)
Kanashiro, Winston Hisasi
Pimenta, Jaime Flavio
Titre en portugais
Desvio de rios para a construção de barragens.
Mots-clés en portugais
Barragem
Desvio de rios
Ensecadeira
Estruturas de desvio
Riscos de desvio
Resumé en portugais
As obras de desvio de rios para a construção de barragens, embora tenham caráter provisório, são de estrema importância, pois definem como o empreendimento será executado, garantindo segurança à sua construção, dentro de riscos calculados, devendo no entanto ser o mais econômica possível. As estruturas de desvio devem se encaixar no arranjo das estruturas permanentes, podendo ser utilizadas como tal. Este trabalho tem o intuito de apresentar as principais estruturas utilizadas em esquemas de desvio de rios e caracterizar sua utilização e aplicabilidade. Sempre que possível foram apresentados esquemas utilizados na prática ou previstos em projeto, para melhor exemplificar e caracterizar as diversas estruturas e as possíveis soluções para desvio de rios.
Titre en anglais
River diversion for dam construction.
Mots-clés en anglais
Cofferdam
Dam
Diversion risks
Diversion structures
River diversion
Resumé en anglais
Diversion works for dam construction are temporary. Nevertheless, they are extremely important, since they define how the construction is going to be made, and assuring its safety, within calculated risks. But, they have to be as economical as possible. The diversion structures must fit the global arrangement of the project, being in some cases be used as permanent structures. This document has the objective of present the main diversion structures used in diversion works schemes, as well as characterize their utilization and applicability. Whenever possible, it was presented examples of schemes either already used or just previewed on design, to better characterize and exemplify the many structures and possible solutions for river diversion.
 
AVERTISSEMENT - Regarde ce document est soumise à votre acceptation des conditions d'utilisation suivantes:
Ce document est uniquement à des fins privées pour la recherche et l'enseignement. Reproduction à des fins commerciales est interdite. Cette droits couvrent l'ensemble des données sur ce document ainsi que son contenu. Toute utilisation ou de copie de ce document, en totalité ou en partie, doit inclure le nom de l'auteur.
ErrataGabrielRocha.pdf (87.81 Kbytes)
Date de Publication
2006-12-19
 
AVERTISSEMENT: Apprenez ce que sont des œvres dérivées cliquant ici.
Tous droits de la thèse/dissertation appartiennent aux auteurs
CeTI-SC/STI
Bibliothèque Numérique de Thèses et Mémoires de l'USP. Copyright © 2001-2024. Tous droits réservés.