• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Disertación de Maestría
DOI
https://doi.org/10.11606/D.3.2006.tde-08122006-164741
Documento
Autor
Nombre completo
Gabriel dos Santos Cruz Rocha
Dirección Electrónica
Instituto/Escuela/Facultad
Área de Conocimiento
Fecha de Defensa
Publicación
São Paulo, 2006
Director
Tribunal
Tamada, Kikuo (Presidente)
Kanashiro, Winston Hisasi
Pimenta, Jaime Flavio
Título en portugués
Desvio de rios para a construção de barragens.
Palabras clave en portugués
Barragem
Desvio de rios
Ensecadeira
Estruturas de desvio
Riscos de desvio
Resumen en portugués
As obras de desvio de rios para a construção de barragens, embora tenham caráter provisório, são de estrema importância, pois definem como o empreendimento será executado, garantindo segurança à sua construção, dentro de riscos calculados, devendo no entanto ser o mais econômica possível. As estruturas de desvio devem se encaixar no arranjo das estruturas permanentes, podendo ser utilizadas como tal. Este trabalho tem o intuito de apresentar as principais estruturas utilizadas em esquemas de desvio de rios e caracterizar sua utilização e aplicabilidade. Sempre que possível foram apresentados esquemas utilizados na prática ou previstos em projeto, para melhor exemplificar e caracterizar as diversas estruturas e as possíveis soluções para desvio de rios.
Título en inglés
River diversion for dam construction.
Palabras clave en inglés
Cofferdam
Dam
Diversion risks
Diversion structures
River diversion
Resumen en inglés
Diversion works for dam construction are temporary. Nevertheless, they are extremely important, since they define how the construction is going to be made, and assuring its safety, within calculated risks. But, they have to be as economical as possible. The diversion structures must fit the global arrangement of the project, being in some cases be used as permanent structures. This document has the objective of present the main diversion structures used in diversion works schemes, as well as characterize their utilization and applicability. Whenever possible, it was presented examples of schemes either already used or just previewed on design, to better characterize and exemplify the many structures and possible solutions for river diversion.
 
ADVERTENCIA - La consulta de este documento queda condicionada a la aceptación de las siguientes condiciones de uso:
Este documento es únicamente para usos privados enmarcados en actividades de investigación y docencia. No se autoriza su reproducción con finalidades de lucro. Esta reserva de derechos afecta tanto los datos del documento como a sus contenidos. En la utilización o cita de partes del documento es obligado indicar el nombre de la persona autora.
ErrataGabrielRocha.pdf (87.81 Kbytes)
Fecha de Publicación
2006-12-19
 
ADVERTENCIA: Aprenda que son los trabajos derivados haciendo clic aquí.
Todos los derechos de la tesis/disertación pertenecen a los autores
CeTI-SC/STI
Biblioteca Digital de Tesis y Disertaciones de la USP. Copyright © 2001-2024. Todos los derechos reservados.