Master's Dissertation
DOI
https://doi.org/10.11606/D.3.2009.tde-26012009-154659
Document
Author
Full name
María Fernanda Quintana Ytza
E-mail
Institute/School/College
Knowledge Area
Date of Defense
Published
São Paulo, 2009
Supervisor
Committee
Stucchi, Fernando Rebouças (President)
El Debs, Mounir Khalil
Ishitani, Hideki
Title in Portuguese
Métodos construtivos de pontes estaiadas - estudo da distribuição de forças nos estais.
Keywords in Portuguese
Forças de Implantação dos estais
Pontes estaiadas (comportamento estrutural)
Sistemas e processos construtivos
Abstract in Portuguese
As pontes estaiadas são pontes que consistem de um tabuleiro suportado por cabos retos e inclinados (estais) fixados nos mastros. Este tipo de estrutura é altamente hiperestática, bastante sensível à seqüência construtiva, mas mesmo assim aceitando, por conta a flexibilidade do tabuleiro uma considerável gama de esforços de instalação dos estais. É importante escolher uma distribuição inicial apropriada para esses esforços sob carregamento permanente tal que a flexão no tabuleiro seja limitada. A presente pesquisa tem como objetivo estudar diferentes métodos para a obtenção de uma boa distribuição de esforços nos estais em pontes estaiadas. Os métodos estudados nesta pesquisa são: o método do tabuleiro articulado (uma articulação em cada cruzamento com os estais - MTA), o método de anulação dos deslocamentos (MAD), o método de anulação das reações em apoios fictícios (MAR) e o método de anulação dos deslocamentos ao longo do processo construtivo. A idéia final de todos eles é obter para o tabuleiro uma resposta próxima à de uma viga continua. Porém, se for necessário, pode-se controlar também os deslocamentos do mastro. Os três primeiros métodos são estudados para a configuração final da ponte, mas também foram verificados seus resultados considerando o processo construtivo, já que durante esta etapa ocorrem variações nos esforços internos da ponte alterando assim o resultado final. Todos os resultados são comparados com a finalidade de escolher um método que além de controlar a configuração final da ponte apresente uma distribuição aceitável de esforços ao final da construção. Desta forma, pode-se obter uma boa estimativa dos esforços de instalação dos estais.
Title in English
Construction methods of cabled-stayed bridges - study of cable forces distribution.
Keywords in English
Cable installation forces
Cable-stayed bridges (structural behavior)
Construction procedures
Abstract in English
Cable-stayed bridges consists of a deck supported by inclined and straight cables anchored to the pylons. This type of structure is highly hyperestatic and quite sensitive to the construction sequence, but yet supporting a considerable range of loadings from the cable installation due to the deck flexibility. Nevertheless, due to the deck flexibility the cables can accept a considerable range of loadings. It is important to choose an appropriate initial distribution for those loadings under permanent load, so that the bending moment on the bridge deck is limited. The main goal of this research is to study the different methods for obtaining a good load distribution in cables in cable-stayed bridges. The methods that are studied in this research are: The articulated deck method (there is a joint in every cable-deck junction - MTA), the zero displacement method (MAD), the ficticious support force equilibrium method (MAR), and the construction process zero displacement method. The objective of them all is to obtain a deck bending moment similar to that of a continuous beam. However, if necessary, the displacements of the pylon can be controlled. The first three methods are studied for the bridge final configuration. However, their results for the initial configuration during the construction process are also verified, since there are significant bridge internal loading variations which may change the final outcome. All the results are evaluated in order to choose a method that not also controls the bridge final configuration, but also presents an acceptable cable loading distribution at the end of the construction. This way, a good estimative of the loadings from the pylons installation can be obtained.
 
WARNING - Viewing this document is conditioned on your acceptance of the following terms of use:
This document is only for private use for research and teaching activities. Reproduction for commercial use is forbidden. This rights cover the whole data about this document as well as its contents. Any uses or copies of this document in whole or in part must include the author's name.
Publishing Date
2009-07-07
 
WARNING: Learn what derived works are clicking here.
All rights of the thesis/dissertation are from the authors
CeTI-SC/STI
Digital Library of Theses and Dissertations of USP. Copyright © 2001-2024. All rights reserved.