• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Mémoire de Maîtrise
DOI
https://doi.org/10.11606/D.3.2017.tde-27062017-105858
Document
Auteur
Nom complet
Patrícia Oliveira da Silveira
Unité de l'USP
Domain de Connaissance
Date de Soutenance
Editeur
São Paulo, 2017
Directeur
Jury
Jardini, José Antonio (Président)
Silva, Fabiana Aparecida de Toledo
Sousa, Thales
Titre en portugais
Planejamento de sistemas de transmissão em área com fonte de geração intermitente, apoiado no uso de tecnologias avançadas.
Mots-clés en portugais
Linhas de transmissão de energia elétrica (Planejamento; Economia)
Transmissão de energia elétrica por corrente alternada
Resumé en portugais
O Brasil é um país de dimensões continentais, onde existe uma considerável distância entre a geração e os principais centros de consumo. Dessa forma, o estudo e desenvolvimento de novas tecnologias de transmissão a longas distâncias é de fundamental importância para o desenvolvimento do país. A solução mais utilizada atualmente é a transmissão em corrente alternada. Entretanto a transmissão em corrente continua também é uma solução viável para longas distâncias. O sistema brasileiro é composto principalmente por linhas 500 kV em corrente alternada (também há 230; 345; 440 e 750 kV), bem como em corrente continua (em ±600 e ±800 kV). O presente estudo apresenta uma solução de transmissão em corrente alternada por linhas de 1000 kV, que se mostrou mais econômico na transmissão de potências superiores a 3.500 MW e distâncias de 1400km. Nos próximos anos, a geração de energia elétrica no Brasil será expandida de forma significativa, ocorrerá um aumento principalmente na geração de energia eólica e solar, localizadas em sua maioria na região Nordeste do país. Esse aumento na geração exigirá a transmissão de grandes blocos de energia elétrica por distâncias significativas, devido à falta de proximidade entre a geração e os principais centros consumidores, que estão localizados no Sudeste. Neste estudo, serão mostradas as etapas de definição de condutor economicamente mais adequado e projeto da geometria da torre. Com base nos dados obtidos, será feita a avaliação do desempenho da linha 1000 kV, durante a operação normal de fluxo de carga, curtos-circuitos e estabilidade.
Titre en anglais
Planning of transmission systems in an area with an intermittent generation source, based on the use of advanced technologies.
Mots-clés en anglais
alternating current Ultra-high-voltage transmission (UHV)
Economic transmission systems
Planning of power lines transmission
ultra-high-voltage transmission (UHV)
Resumé en anglais
Brazil, a country of continental proportions, have significant distance between the power generation centers and the main consumer centers. In such way, the study and development of new transmission technologies over long distances is of fundamental importance for the development of the country. Nowadays, the most commonly used solution is alternating current transmission. However, direct current transmission is also a viable solution for long distances. The Brazilian system mainly consists of 500 kV alternating current lines (along with 230, 345, 440 and 750 kV) and direct current lines (± 600 and ± 800 kV). This study provides a solution for transmission in alternating current by lines of 1000 kV, which proved to be more economical in power transmission over 3,500 MW and distances beyond 1400km. In the coming years, the electric power generation in Brazil will expand significantly; a boost will take place mainly in wind and solar power generation, located mostly in the Northeast of the country. This generation expansion will require transmission of large blocks of electric power over considerable distances, due to the lack of proximity between generation sites and main consumer centers located in the Southeast. This study will show the setting stages of the most economically applicable conductor and tower geometry design. Based on the data obtained, the performance of the 1000 kV line will be evaluated during the regular load flow operation, short circuits and stability.
 
AVERTISSEMENT - Regarde ce document est soumise à votre acceptation des conditions d'utilisation suivantes:
Ce document est uniquement à des fins privées pour la recherche et l'enseignement. Reproduction à des fins commerciales est interdite. Cette droits couvrent l'ensemble des données sur ce document ainsi que son contenu. Toute utilisation ou de copie de ce document, en totalité ou en partie, doit inclure le nom de l'auteur.
Date de Publication
2017-07-20
 
AVERTISSEMENT: Apprenez ce que sont des œvres dérivées cliquant ici.
Tous droits de la thèse/dissertation appartiennent aux auteurs
CeTI-SC/STI
Bibliothèque Numérique de Thèses et Mémoires de l'USP. Copyright © 2001-2024. Tous droits réservés.