• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Master's Dissertation
DOI
https://doi.org/10.11606/D.3.2009.tde-18122009-154702
Document
Author
Full name
Raphael Bertrand Heideier
E-mail
Institute/School/College
Knowledge Area
Date of Defense
Published
São Paulo, 2009
Supervisor
Committee
Saidel, Marco Antonio (President)
Barros, Virginia Parente de
Ramos, Dorel Soares
Title in Portuguese
Conceitos básicos de risco na comercialização de energia elétrica no Setor Elétrico Brasileiro e a atuação governamental.
Keywords in Portuguese
Eletrotécnica
Energia elétrica
Engenharia elétrica
Sistemas elétricos de potência
Abstract in Portuguese
Buscou-se refletir de que forma as decisões governamentais afetam o setor energético e como os agentes reagem ao modelo e à instabilidade das regras vigentes. O estudo compreende uma breve revisão da estrutura do atual modelo e dos principais riscos que envolvem a comercialização de eletricidade. Partiu-se do pressuposto que o preço é o maior risco presente no Setor Elétrico Brasileiro (SEB), uma vez que é o reflexo de uma somatória de riscos. Os preços analisados são: i) o preço de curto prazo de energia elétrica (PLD), sua relação com as usinas termoelétricas e o despacho fora da ordem de mérito; ii) a tarifa de energia elétrica no ambiente cativo e livre, as principais variáveis de influência e uma projeção dos valores futuros; e iii) o preço de longo prazo de energia elétrica, uma revisão do resultado dos leilões e a discussão sobre a prorrogação / licitação das concessões de geração pelo governo. Entendendo a estreita relação que existe entre os três preços discutidos (tarifa, PLD e contratação de longo prazo) propõe-se uma metodologia alternativa para formação de carteiras eficientes de recursos de geração com o objetivo de demonstrar a importância de promover a expansão através de um sólido planejamento de longo prazo. Demonstra-se a metodologia em um estudo de caso em que se discute os resultados alcançados. Por fim, três medidas de melhoria ao atual modelo do SEB são sugeridas: 1) O planejamento de longo prazo da expansão da geração ser feito de forma integrada, considerando aspectos sociais, políticos, ambientais e econômicos; 2) Desassociar o custo marginal de expansão do custo marginal de operação; e 3) Criar um mecanismo para que o próprio mercado possa estabelecer o preço de curto prazo da energia elétrica.
Title in English
Basic risk concepts in electric power trade in Brazilian Electric Sector and the Governmental performance.
Keywords in English
Brazilian electric sector
Electric power trade
Federal Government
Regulatory risk
Abstract in English
It is intended to reflect how the governmental decisions affect the energy sector, as the agents react to the model and the instability of the effective rules. The research understands a brief of the current electric sector model structure and the main risks that involve the electricity trade. It was assumed that the price is the largest present risk in the Brazilian Electric Sector (BES), because it is the consequence of a sum of risks. The prices analyzed are: i) the short term price of electric power, its relation with the thermoelectric plants and the out of merit order dispatch; ii) the tariff of electric power in the captive and free environments, the main influence variable and a projection of the future values; and iii) the long term price of electric power, an auctions results revision and the question of to renew or to bid the currents concessions for generation plants at the end of the granted period. Understanding the narrow relationships existent between the three argued prices (tariff, short and long term prices) it is proposed an alternative methodology to build efficient portfolio of generation resources to demonstrate the importance of long term plan to promote the expansion. The methodology is demonstrated in a study case where the results are discussed. Finally, three measures of improvement to the current model of the BES are suggested: 1) A long term plan to expand the generation resources based in an integrated methodology that involves social, ambiental politics and economics aspects; 2) To disassociate the operational marginal costs to the expansion marginal costs; and 3) To create a mechanism in order that the market itself can to establish the spot price of electric power.
 
WARNING - Viewing this document is conditioned on your acceptance of the following terms of use:
This document is only for private use for research and teaching activities. Reproduction for commercial use is forbidden. This rights cover the whole data about this document as well as its contents. Any uses or copies of this document in whole or in part must include the author's name.
dissRaphael.pdf (924.52 Kbytes)
Publishing Date
2010-05-19
 
WARNING: Learn what derived works are clicking here.
All rights of the thesis/dissertation are from the authors
CeTI-SC/STI
Digital Library of Theses and Dissertations of USP. Copyright © 2001-2024. All rights reserved.