• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Mémoire de Maîtrise
DOI
https://doi.org/10.11606/D.3.2009.tde-13072009-161424
Document
Auteur
Nom complet
Elvis Richard Tello Ortíz
Adresse Mail
Unité de l'USP
Domain de Connaissance
Date de Soutenance
Editeur
São Paulo, 2009
Directeur
Jury
Prieto Schmidt, Hernán (Président)
Magrini, Luiz Carlos
Tahan, Carlos Márcio Vieira
Titre en portugais
Metodologia para atendimento de novas cargas em sistemas de distribuição de energia elétrica.
Mots-clés en portugais
Distribuição de energia elétrica
Sistemas elétricos de potência
Subestações elétricas
Resumé en portugais
Nos países em desenvolvimento, como o Brasil, novos requerimentos de conexão às redes elétricas são solicitados constantemente como conseqüência do crescimento econômico e da conseqüente expansão da rede elétrica. Uma empresa distribuidora que atenda a uma cidade de grande porte recebe a cada mês um elevado número de solicitações de conexão de novas cargas. Assim, um dos principais desafios das áreas de projeto das empresas distribuidoras é encontrar a melhor forma, tanto técnica como economicamente, de atender a estas solicitações. Devido ao volume do trabalho envolvido, bem como à escassez de dados detalhados da rede elétrica, a prática convencional estabelece filtros para reduzir o número de estudos associados às novas cargas. Normalmente, estes filtros são baseados em um valor limite de demanda máxima. Se a nova carga possui uma demanda máxima inferior ao limite, a nova carga é ligada diretamente, sem a execução de estudos elétricos. Se, por outro lado, a demanda máxima da nova carga excede o limite, então um estudo detalhado é iniciado. Esta prática pode levar a duas decisões equivocadas por parte da empresa: (i) não-execução de um estudo quando ele era necessário, e (ii) execução de um estudo desnecessariamente. A situação de escassez de dados detalhados está mudando rapidamente nos últimos anos no mundo da distribuição de energia elétrica. Há atualmente poderosos sistemas geo-referenciados que permitem associar cada elemento da rede elétrica a uma posição geográfica bem definida. Além disso, estes sistemas contam com o apoio de bases de dados que possuem recursos para cadastrar e administrar o enorme volume de dados associados às redes de distribuição de energia elétrica. Esta nova realidade conduz naturalmente ao desenvolvimento de modelos mais sofisticados que permitem aprimorar muito a qualidade dos serviços prestados pelas empresas distribuidoras. Este trabalho propõe, desenvolve e implementa uma nova metodologia de apoio à decisão no que se refere à ligação de novas cargas em redes de distribuição de energia elétrica. A metodologia está baseada no conceito inovador de folga de potência, estabelecido no âmbito deste trabalho, pelo qual calcula-se a priori e em cada ponto da rede a máxima carga que pode ser conectada sem que os critérios técnicos, de tensão mínima e máximo carregamento, sejam transgredidos. A natureza da metodologia proposta elimina automaticamente a possibilidade de ocorrência das duas decisões equivocadas comentadas anteriormente. A utilização da metodologia desenvolvida é ilustrada através de diversos exemplos de aplicação que utilizam redes reais de distribuição, em baixa e média tensão.
Titre en anglais
Methodology for assessing the impact for new loads in eletric power distribution systems.
Mots-clés en anglais
Electric substations
Electricity distribution
Power electric systems
Resumé en anglais
Economic growth and the associated expansion of the electrical power system naturally lead to a large number of new loads being connected to the existing network. As a consequence, one of the main challenges faced by the design areas in electrical utilities refers to the problem of finding the best solution among various alternatives for connecting a new load, from both technical and economic viewpoints. Owing to the large size of the problem, and also to the lack of detailed data associated with distribution systems, electrical utilities adopted in the past a few filtering techniques so as to reduce the amount of work to reasonable levels. These filters usually define a limit for the maximum demand declared by a new customer. If the required maximum demand does not exceed the limit, the new load is connected straight away without carrying out any electrical study. On the other hand, when the maximum demand does exceed this limit, a detailed analysis is executed. Despite the savings brought about by this technique, it may lead to two potentially wrong decisions: (i) overseeing a detailed analysis when it is needed, and (ii) carrying out a study when it is not necessary. Concerning the lack of detailed data, fortunately this situation has been improving rapidly in the last few years. Currently, there exist powerful georreferenced systems capable of associating every component of the electrical system with a well-defined geographical location. These systems usually rely on supporting databases which allow efficient management of the huge amount of data normally associated with distribution networks. This new standpoint naturally leads to the development of more sophisticated models which allow considerable improvements on the quality of services offered by the utilities. This work presents a new methodology aimed at supporting the decision-making process regarding the connection of new loads in electrical distribution networks. The methodology is based upon the innovative concept of capacity margin, established within this work, by which the maximum load that can be connected to any given point is computed in advance in offline mode. The criteria for finding the maximum load are based on the common requirements of minimum voltage and maximum loading. The proposed methodology automatically eliminates the two wrong decisions mentioned above. The application of the proposed methodology is illustrated through various examples which use real distribution networks, at both low and medium voltage levels.
 
AVERTISSEMENT - Regarde ce document est soumise à votre acceptation des conditions d'utilisation suivantes:
Ce document est uniquement à des fins privées pour la recherche et l'enseignement. Reproduction à des fins commerciales est interdite. Cette droits couvrent l'ensemble des données sur ce document ainsi que son contenu. Toute utilisation ou de copie de ce document, en totalité ou en partie, doit inclure le nom de l'auteur.
dissertacao_final.pdf (617.83 Kbytes)
Date de Publication
2009-07-16
 
AVERTISSEMENT: Le matériau se réfère à des documents provenant de cette thèse ou mémoire. Le contenu de ces documents est la responsabilité de l'auteur de la thèse ou mémoire.
  • ORTIZ, Elvis Richard Tello, y SCHMIDT, H. P. Programa de apoyo a la toma de decisiones sobre nuevas cargas en sistemas de distribución mediante margen de capacidad. Ingeniería Energética [online], 2009, vol. 30, p. 47-54. Disponible en Internet: http://rie.cujae.edu.cu/index.php/RIE/article/viewFile/39/38.
  • ORTIZ, Elvis Richard Tello, e Schmidt, H.P. Cálculo de folga de potência para apoio às decisões mediante modelo de máxima demanda em redes de distribuição de energia elétrica. In XVII Congresso Brasileiro de Automática, Juiz de Fora, 2008. Anais do XVII Congresso Brasileiro de Automática., 2008.
  • ORTIZ, Elvis Richard Tello, y SCHMIDT, H. P. Programa de apoyo a la toma de decisiones sobre nuevas cargas en sistemas de distribución mediante margen de capacidad. In Conferencia Técnica Andina - IEEE ANDESCON 2008, Cusco (Perú), 2008. Conferencia Técnica Andina - IEEE ANDESCON 2008., 2008.
Tous droits de la thèse/dissertation appartiennent aux auteurs
CeTI-SC/STI
Bibliothèque Numérique de Thèses et Mémoires de l'USP. Copyright © 2001-2024. Tous droits réservés.