Mémoire de Maîtrise
DOI
https://doi.org/10.11606/D.3.2008.tde-03022009-105530
Document
Auteur
Nom complet
Marcos Rosa dos Santos
Adresse Mail
Unité de l'USP
Domain de Connaissance
Date de Soutenance
Editeur
São Paulo, 2008
Directeur
Jury
Pereira, Carlos Eduardo de Morais (Président)
Martinez, Manuel Luís Barreira
Zanetta Júnior, Luiz Cera
Titre en portugais
Paralelismo de alimentadores através de seccionadoras de vis-à-vis na rede aérea primária de distribuição.
Mots-clés en portugais
Alimentadores
Distribuição de energia elétrica
Fechamento em anel
Paralelismo
Redes de distribuição de energia elétrica
Seccionadoras de vis-à-vis
Sistemas elétricos de potência
Resumé en portugais
Um aspecto importante relacionado à operação de sistemas de distribuição é o referente à segurança nas ações de restabelecimento pós-perturbações, em manobras emergenciais e programadas, onde necessite de transferência de cargas entre alimentadores aéreos primários de uma mesma subestação ou para uma subestação adjacente, de forma segura e confiável. Devem-se observar os requisitos de carregamento, tensão a nível sistêmico, proteção, entre outros. Atualmente as decisões e tomadas de ações referentes às manobras necessárias para os remanejamentos de cargas são de competência dos operadores que atuam nas salas de controle de operações e, em muitos casos, respaldadas somente na experiência de cada operador, acumulada ao longo do tempo. Este trabalho visa o estudo dos fenômenos físicos envolvidos em situações que coloquem alimentadores aéreos primários de distribuição em paralelo ou mesmo quando se forme uma configuração em anel fechado. Estas manobras podem ser executadas através de alimentadores e transformadores distintos, de mesma potência ou de potências diferentes, estabelecendo diretrizes e respaldando os operadores das salas de controle em situações de emergência, urgência ou programadas no sistema aéreo de distribuição. O objetivo principal é oferecer informações técnicas, possibilitando as tomadas de decisões mais adequadas na coordenação de manobras no sistema aéreo de distribuição, em tempo real. Cada uma delas tem condições que se pode considerar como a mais adequada para a execução dos procedimentos estabelecidos, porém sem os principais subsídios técnicos. Desta forma, algumas variáveis como tensão mínima, limites de carregamento de equipamentos, ângulo de fase dos transformadores, restrições operativas do sistema e de consumidores, devem ser aplicadas em tempo real para a tomada de decisão por parte dos operadores do sistema elétrico.
Titre en anglais
Feeders parallelism through vis-a-vis disconnecting switches in aerial primary distribution network.
Mots-clés en anglais
Closed-loop
Closed-loop arrangement
Feeder
Sectionalizing and tie switches
Resumé en anglais
An important aspect related to the distribution systems operation concerns the safety required in the post-disturbances restorement actions or in the emergency and scheduled maneuvers, which involve the need for load transfer between primary overhead feeders of a same sub-station or for an adjacent sub-station, in a safe and reliable way, complying with the loading requirements, voltage at systemic level and protection, among others. Currently the decisions and taking actions related to the necessary maneuvers to carry out the load transfers are responsibility of the operators who work in the operations control rooms, and in many cases, only endorsed by each operator´s own experience, gathered along the time. This paper aims at the study of the involved physical phenomena in situations that place distribution primary overhead feeders in parallel or even when a configuration in closed ring is formed, via distinct transformers and feeders of same or different powers, establishing guidelines and endorsing the control rooms operators in emergency, urgency or scheduled situations in the distribution overhead system. The main objective is to provide technical information, enabling more adequate taking decisions in the distribution overhead system maneuvers coordination, in real time. Each of them has conditions that can be considered the most adequate to carry out the established procedures, however without the main technical information. Thus, some variables such as minimum voltage, equipment loading limits, transformers´ phase angle, the operational restrictions of the system and customers must be applied in real time for the taking decision by the electrical system operators.
 
AVERTISSEMENT - Regarde ce document est soumise à votre acceptation des conditions d'utilisation suivantes:
Ce document est uniquement à des fins privées pour la recherche et l'enseignement. Reproduction à des fins commerciales est interdite. Cette droits couvrent l'ensemble des données sur ce document ainsi que son contenu. Toute utilisation ou de copie de ce document, en totalité ou en partie, doit inclure le nom de l'auteur.
marcos_santos1.pdf (44.98 Kbytes)
marcos_santos2.pdf (79.58 Kbytes)
marcos_santos3.pdf (230.63 Kbytes)
marcos_santos4.pdf (815.70 Kbytes)
marcos_santos5.pdf (375.46 Kbytes)
marcos_santos6.pdf (6.04 Mbytes)
marcos_santos7.pdf (1.77 Mbytes)
marcos_santos8.pdf (11.71 Kbytes)
Date de Publication
2009-02-06
 
AVERTISSEMENT: Apprenez ce que sont des œvres dérivées cliquant ici.
Tous droits de la thèse/dissertation appartiennent aux auteurs
CeTI-SC/STI
Bibliothèque Numérique de Thèses et Mémoires de l'USP. Copyright © 2001-2024. Tous droits réservés.