• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Tesis Doctoral
DOI
https://doi.org/10.11606/T.3.2012.tde-11062013-145122
Documento
Autor
Nombre completo
Jefferson Rocco
Dirección Electrónica
Instituto/Escuela/Facultad
Área de Conocimiento
Fecha de Defensa
Publicación
São Paulo, 2012
Director
Tribunal
Cintra, Jorge Pimentel (Presidente)
Dalazoana, Regiane
Fonseca Júnior, Edvaldo Simões da
Paciléo Netto, Nicola
Veiga, Luís Augusto Koenig
Título en portugués
Metodologia para o posicionamento de poligonais em obras metroviárias.
Palabras clave en portugués
Controle da qualidade
Locação
Metrô (traçado)
Qualidade do projeto
Topografia (classificação)
Túneis (projeto)
Resumen en portugués
Entre os principais problemas na execução de túneis metroviários e rodoviários estão a manutenção da posição (coordenadas) de pontos de uma poligonal aberta (sem pontos de controle), o monitoramento do alinhamento da escavação, o transporte da posição da superfície para níveis subterrâneos, a locação das cambotas e, como ferramenta para tudo isso, o controle de qualidade dos equipamentos, em especial a estação total na operação da medição de direções. Por isso, a presente pesquisa voltou-se para os métodos e procedimentos para a execução de poligonais subterrâneas, destinadas a escavação de túneis metroviários, rodoviários e assemelhados, focando a precisão e acurácia na medição de direções. Para conseguir o objetivo, foi estudada a precisão de diversas estações totais, na operação de medir direções. Foram feitas diversas campanhas e foi estabelecido um campo de provas que permite avaliar a precisão e acurácia dos equipamentos. Além disso, visando simular as condições de campo, os problemas e as precisões possíveis, implantou-se uma poligonal referente a um projeto geométrico de túnel na Raia Olímpica da USP com características semelhantes a um projeto metroviário. A Base Multipilar existente foi utilizada para o controle da poligonal ao longo do túnel simulado para verificar a precisão efetivamente alcançada com os equipamentos e metodologias. Outra contribuição foi o estabelecimento de um quadrilátero de controle, com ângulos conhecidos com desvio-padrão na ordem de 0,36", servindo para verificar a precisão dos equipamentos (conjunto operador, equipamento e acessórios). Dos experimentos com diversos equipamentos surgiram propostas para serem incorporadas à norma de controle de qualidade da medição de direção.
Título en inglés
Methodology for the placement of polygon works in subway.
Palabras clave en inglés
Location
Project quality
Quality control
Subway (outline)
Topography (classification)
Tunnels (project)
Resumen en inglés
Among the main problems in the implementation of subway and road tunnels are the maintenance of the correct position (coordinates) of points of an open traverse (without control points), the monitoring of the excavation alignment, the connection of the surface network with the points underground, the location of crankshafts and, as a tool for all this, the equipment quality control, particularly the total station in the direction measurement operation. Therefore, the current study is based on methods and procedures to implement underground traverse, intended to the excavation of subway and road tunnels and similar structures, focusing on the precision and accuracy in the measurement of directions. In order to achieve its aim, the precision of several total stations was studied in the operation of measuring directions. Several campaigns were made and a test field work was established allowing the assessment of the precision and accuracy of the equipment. Moreover, aiming to simulate the field conditions, the problems and possible precisions, a traverse was implemented referring to a tunnel geometrical project located at the University of São Paulo with similar characteristics to a subway project. The existing Multi-pillar Base was used to control the polygon along the simulated tunnel in order to verify the precision effectively reached with the equipment and methodology. Another contribution was the establishment of a control quadrangle, which the angles standard deviation is 0,36", and it was used to verify the equipment precision. By testing several equipments some proposals arose to be incorporated to the direction measurement quality control.
 
ADVERTENCIA - La consulta de este documento queda condicionada a la aceptación de las siguientes condiciones de uso:
Este documento es únicamente para usos privados enmarcados en actividades de investigación y docencia. No se autoriza su reproducción con finalidades de lucro. Esta reserva de derechos afecta tanto los datos del documento como a sus contenidos. En la utilización o cita de partes del documento es obligado indicar el nombre de la persona autora.
Fecha de Publicación
2013-06-24
 
ADVERTENCIA: Aprenda que son los trabajos derivados haciendo clic aquí.
Todos los derechos de la tesis/disertación pertenecen a los autores
CeTI-SC/STI
Biblioteca Digital de Tesis y Disertaciones de la USP. Copyright © 2001-2024. Todos los derechos reservados.