Master's Dissertation
DOI
https://doi.org/10.11606/D.3.2013.tde-16102014-151805
Document
Author
Full name
Gilberto Koji Nishioka
E-mail
Institute/School/College
Knowledge Area
Date of Defense
Published
São Paulo, 2013
Supervisor
Committee
Carrillo Le Roux, Galo Antonio (President)
Brinati, Marco Antônio
Rocha, Roger
Title in Portuguese
Estudo da programação de atividades de desenvolvimento de poços de petróleo marítimos.
Keywords in Portuguese
Pesquisa operacional
Petróleo
Programação matemática
Abstract in Portuguese
Este trabalho detalha o problema de programação de atividades de desenvolvimento de poços marítimos (PPADPM), cujo objetivo é definir o uso de sondas e navios, de forma a otimizar a produção de óleo dos poços marítimos. São apresentados cinco modelos baseados em programação linear-inteira mista (MILP) e um modelo gerado via programação por restrições (PR) para este problema. Concluiu-se que, dentre os modelos MILP, aquele baseado em variáveis que definem a ordem de execução das atividades apresenta os melhores resultados, tanto em termos de qualidade de soluções quanto em termos de tamanho do modelo. O aumento do tamanho da instância (em número de poços e/ou em número de recursos) traz como consequência um menor número de nós analisados dentro de um tempo limite de execução do modelo, ao mesmo tempo em que se observa que as estratégias de escolha de variáveis, de escolha de nós e de uso de solução inicial nos modelos MILP tornam-se ineficientes. Na comparação entre modelos MILP e o modelo baseado em PR, constatou-se que este último obteve as melhores soluções em mais de 90% dos casos analisados e, consistentemente, obteve mais soluções viáveis para cada instância. Entretanto, por não fornecer informações sobre a qualidade da solução, o modelo baseado em PR somente obtém a solução ótima ao analisar todo o espaço de busca do modelo; desta forma, este apenas chegou à solução ótima em instâncias com até quatro poços, enquanto alguns dos modelos MILP obtiveram a solução ótima para instâncias com até treze poços.
Title in English
Study of the scheduling problem of offshore oil wells development activities.
Keywords in English
Mathematical optimization
Operational research
Petroleum
Abstract in English
This work details the offshore wells activities on specialized resources scheduling problem, focusing on the optimization of the total oil production. A Constraint Programming (CP) model and five Mixed-Integer Linear Programming (MILP) models were studied. Among the linear models, those based on activities order variables are smaller, and led to the better solutions for almost all of the instances analyzed. As far as the size of the instances (number of wells and/or number of resources) increases, the number of branched nodes in a limited time decreases and, consequently, the influence of B&B nodes and variable selection strategies and of the initial guesses on the MILP model solution gets less efficient. Comparing best solutions for each instance, the CP model outperformed MILP models in 90% of the studied cases. In addition, the CP based model consistently found more solutions per instance than the MILP based models did. However, because the CP model does not give information on the quality of a solution (gap), it was only able to obtain optimal solutions for instances with up to four wells, while MILP based models found optimal solutions for instances up to thirteen wells.
 
WARNING - Viewing this document is conditioned on your acceptance of the following terms of use:
This document is only for private use for research and teaching activities. Reproduction for commercial use is forbidden. This rights cover the whole data about this document as well as its contents. Any uses or copies of this document in whole or in part must include the author's name.
Publishing Date
2014-10-24
 
WARNING: The material described below relates to works resulting from this thesis or dissertation. The contents of these works are the author's responsibility.
  • NISHIOKA, G. K., JOLY, M., and Le Roux, G.A.C. Scheduling of Offshore Wells Activities in Petroleum Specific Resources. In ENGOTP2012 - 3rd International Conference on Engeneering Optimization, Rio de Janeiro, 2012. EngOpt 2012 - 3rd International Conference on Engineering Optimization.Rio de Janeiro : e-papers, 2012. Abstract.