• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Dissertação de Mestrado
DOI
https://doi.org/10.11606/D.3.2014.tde-22052015-155307
Documento
Autor
Nome completo
Leonardo Gurgel Cálipo
E-mail
Unidade da USP
Área do Conhecimento
Data de Defesa
Imprenta
São Paulo, 2014
Orientador
Banca examinadora
Mesquita, Marco Aurélio de (Presidente)
Biazzi, Jorge Luiz de
Ronconi, Debora Pretti
Título em português
Análise do problema de controle de estoques dinâmico para demanda não estacionária e lead-time positivo.
Palavras-chave em português
Controle de estoques
Demanda não-estacionária
Heurística
Programação dinâmica
Simulação
Resumo em português
O problema de controle de estoques com demanda não estacionária e lead-time positivo tem se tornado cada vez mais relevante em virtude da crescente tendência de redução do ciclo de vida dos produtos e internacionalização das cadeias de suprimentos. Embora haja uma solução exata para a minimização do custo esperado da política de estoques para este cenário, baseado no método de programação dinâmica, o custo computacional deste método ainda é considerado elevado. Este trabalho detalha e avalia através de simulação o método exato e duas aproximações para a minimização do custo esperado da política de estoques, em termos do desempenho em custo e eficiência computacional. Os resultados experimentais permitem a análise dos métodos disponíveis. Enquanto a abordagem heurística de Bollapragada e Morton, que utiliza o nivelamento da demanda não estacionária, perde desempenho de custo com o aumento do lead-time, a nova heurística proposta, que aproxima os parâmetros da política ótima por valores limitantes, produz resultados sucessivamente melhores com o aumento do lead-time.
Título em inglês
Analysis of the dynamic inventory control problem with nonstationary demand and positive lead-time.
Palavras-chave em inglês
Dynamic programming
Heuristic
Inventory control
Non-stationary demand
Simulation
Resumo em inglês
The inventory control problem with nonstationary demand and positive lead-time has become increasingly important due to the growing trend of reduction in product life cycle and internationalization of the supply chain. Although there is an exact solution to the minimization of the expected cost of inventory policy on this environment, through the method of dynamic programming, the computational cost of this method is still considered high. This work details and evaluates through simulation the exact method and two heuristic solutions for the minimization of expected cost of inventory policy, in terms of cost performance and computational efficiency. The experimental results allow the analysis of the available methods. While the Bollapragada and Morton heuristic approach, which levels the non-stationary demand, decreases the cost performance when lead-time is increased, the new heuristic proposed, that approximates the optimal policy parameters by limiting values, successively produces better results with increasing lead-times.
 
AVISO - A consulta a este documento fica condicionada na aceitação das seguintes condições de uso:
Este trabalho é somente para uso privado de atividades de pesquisa e ensino. Não é autorizada sua reprodução para quaisquer fins lucrativos. Esta reserva de direitos abrange a todos os dados do documento bem como seu conteúdo. Na utilização ou citação de partes do documento é obrigatório mencionar nome da pessoa autora do trabalho.
ERRATA.pdf (37.19 Kbytes)
FichaCatalografica.pdf (13.67 Kbytes)
Data de Publicação
2015-05-27
 
AVISO: O material descrito abaixo refere-se a trabalhos decorrentes desta tese ou dissertação. O conteúdo desses trabalhos é de inteira responsabilidade do autor da tese ou dissertação.
  • CÁLIPO, L. G., e MESQUITA, M. A. Planejamento e Controle de Separação em um Sistema Picking by Monitor: um estudo em uma empresa de cosméticos. In XXXII Encontro Nacional de Engenharia de Produção, Bento Gonçalves - RS, 2012. Anais do XXXII Encontro Nacional de Engenharia de Produção., 2012.
Todos os direitos da tese/dissertação são de seus autores
CeTI-SC/STI
Biblioteca Digital de Teses e Dissertações da USP. Copyright © 2001-2024. Todos os direitos reservados.