• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Master's Dissertation
DOI
https://doi.org/10.11606/D.3.2018.tde-20092018-105541
Document
Author
Full name
Carlos Henrique Azevedo Duarte
E-mail
Institute/School/College
Knowledge Area
Date of Defense
Published
São Paulo, 2018
Supervisor
Committee
Mesquita, Marco Aurélio de (President)
Júnior, Alceu Salles Camargo
Mota, Daniel de Oliveira
Title in Portuguese
Programação da descarga de navios graneleiros de carvão: um estudo de caso na Companhia Siderúrgica do Pecém.
Keywords in Portuguese
Carvão
Indústria siderúrgica
Navios
Abstract in Portuguese
De acordo com Babu et al. (2015), o carvão mineral é um importante recurso natural devido à sua aplicação em várias atividades econômicas, como geração de energia, produção de aço, fabricação de cimento e produção de combustível líquido. Em função do custo e da baixa qualidade do carvão brasileiro (não coqueificável, na maioria das reservas, com elevado teor de cinzas e baixo poder calorífico), como apontado por Süffert (1997), as empresas brasileiras dos setores siderúrgico e termoelétrico necessitam importar este insumo, por via marítima. O desafio no planejamento da logística de suprimento desta matéria prima é garantir o abastecimento ao mínimo custo de estoque e de espera dos navios. A garantia de abastecimento passa por uma programação adequada da chegada e descarga dos navios. Quando a descarga de navios é uma operação gargalo, é necessário maior cuidado com a programação de recebimento, de maneira com que não haja atrasos, que causem a falta de produto, nem em muita antecipação, que podem significar excessivos tempo de fila para recebimento do material por falta de área para estocagem. Com o objetivo de se programar adequadamente a chegada de navios, de forma a evitar filas muito grandes e desabastecimento foi proposto um modelo de programação de chegada de navios, com base nos dados do complexo de Pecém. Este modelo proposto utilizou um buffer de tempo pré-determinado, que foi testado e validado através de simulação, com objetivo de minimizar os atrasos, de forma que possam ser absorvidos por um estoque de segurança, e as antecipações, de forma que não haja risco de falta de área de estocagem.
Title in English
Schedule for coal bulk carriers discharge: a case study at Companhia Siderúrgica do Pecém.
Keywords in English
Coal
DBR
Ship scheduling
Simulation
Steel industry
Abstract in English
According to Babu et al. (2015), coal is an important natural resource due to its application in various economic activities, such as power generation, steel production, cement manufacturing and liquid fuel production. Due to the cost and low quality of Brazilian coal (not coking, in most reserves, with high ash content and low calorific value), as pointed out by Süffert (1997), Brazilian companies in the steel and thermoelectric sectors need to import this input, by sea. The challenge in planning the logistics of supply of this raw material is to guarantee the supply at the minimum cost of inventory and waiting of the ships. The supply guarantee is subject to adequate scheduling of arrival and unloading of ships. When ship unloading is a bottleneck operation, greater care is required with the scheduling of receipt, so that there are no delays, which cause the lack of product, or in much anticipation, that can mean excessive queue time for receiving the shipment material for lack of storage area. In order to properly program, the arrival of ships, in order to avoid very large queues and shortage, a model for the arrival of ships was proposed, based on data from the Pecém complex. This proposed model used a pre-determined time buffer, which was tested and validated through simulation, in order to minimize the delays, so that they can be absorved by a security stock, and the anticipations, so that there is no risk lack of storage area.
 
WARNING - Viewing this document is conditioned on your acceptance of the following terms of use:
This document is only for private use for research and teaching activities. Reproduction for commercial use is forbidden. This rights cover the whole data about this document as well as its contents. Any uses or copies of this document in whole or in part must include the author's name.
Publishing Date
2018-09-20
 
WARNING: Learn what derived works are clicking here.
All rights of the thesis/dissertation are from the authors
CeTI-SC/STI
Digital Library of Theses and Dissertations of USP. Copyright © 2001-2024. All rights reserved.