• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Dissertação de Mestrado
DOI
https://doi.org/10.11606/D.3.2016.tde-19072016-120435
Documento
Autor
Nome completo
Renato Gioielli Basso
E-mail
Unidade da USP
Área do Conhecimento
Data de Defesa
Imprenta
São Paulo, 2015
Orientador
Banca examinadora
Laurindo, Fernando José Barbin (Presidente)
Mattos, Cláudia Aparecida de
Spinola, Mauro de Mesquita
Título em português
Estratégia de planejamento de produção e os sistemas ERP em ambientes sujeitos ao fenômeno hockey-stick.
Palavras-chave em português
Estoque (Gerenciamento)
Fenômeno hockey-stick
Pico de venda
Planejamento da produção
Push/pull
Sistema híbrido
Resumo em português
O ambiente competitivo atual tem colocado pressão no processo de tomada de decisão no mundo corporativo. Os trade-offs das prioridades competitivas discutidos na elaboração da estratégia como custo, qualidade, serviço e flexibilidade já não são suficientes. Estes trade-offs, embora importantes no curto prazo, devem ser compatibilizados de modo que as empresas que tenham o melhor balanço entre eles devam ter resultado superior. Um dos trade-offs bastante discutido é o equilíbrio entre serviço e estoque. A percepção é que seja improvável alcançar excelência no serviço sem ter um considerável nível de estoque. Deste cenário nasce então o paradoxo do uso de sistemas MRP (Material Requirement Planning) versus sistemas JIT (Just in Time), ou melhor, sistemas empurrados versus puxados, já que a escolha por um ou outro sistema tem ligação íntima com a gestão de estoque. Se por um lado os sistemas MRP são largamente utilizados, via softwares ERP, por outro sistemas JIT têm trazido importantes melhorias nos resultados. Embora muitas empresas considerem a adoção exclusiva de um ou outro sistema, algumas delas têm adotado um processo híbrido com o objetivo de tirar o melhor de cada sistema e gerar assim desempenho superior. O objetivo deste trabalho é investigar como as empresas inseridas em mercados caracterizados pela concentração de demanda no final do mês (fenômeno conhecido como hockey-stick), e baixo acerto nas previsões de demanda, estão aplicando suas estratégias de planejamento de produção e seus ERP. Se por um lado a baixa acurácia nas previsões causa um problema na aplicação de estratégias empurradas de planejamento, pois requer um alto estoque de segurança associado, por outro a concentração de embarque dificulta a adoção de uma estratégia puramente puxada, já que o sistema não tem a estabilidade necessária. Para cumprir com este objetivo seis estudos de caso foram conduzidos e os resultados encontrados, suportados pela teoria, sugerem o aparecimento de um modelo híbrido eficaz para planejamento no ambiente estudado assim como o aparecimento de um sistema DSS (Decision Support System). Outra contribuição desta pesquisa foi identificar, em um dos casos, uma empresa que conseguiu atacar de maneira eficaz o fenômeno em sua causa raiz neutralizando assim seus efeitos.
Título em inglês
Production planning strategy and ERP systems in environments subject to the hockey-stick phenomenon.
Palavras-chave em inglês
Hockey-stick phenomenon
Hybrid system
Inventory management
Production planning
Push/pull
Sales peak
Resumo em inglês
The highly competitive environment of modern times has put pressure on the decision-making process in the corporate world. The trade-offs of competitive priorities such as cost, quality, service and flexibility are no longer enough. These trade-offs, albeit important in the short term, must be matched so that companies that have the best balance between them should have superior results. One of the tradeoffs widely discussed is the balance between service level and inventory. The perception is that excellence is not likely to be achieved in service without having a significant level of inventory. From this scenario comes the paradox of using MRP systems (Material Requirement Planning) versus JIT systems (Just in Time), or rather "pushed" systems versus "pulled" systems since the option for one or the other system has a close connection with inventory management. On the one hand, MRP systems are widely used in industry through ERP software; on the other hand, JIT systems have obtained better results. While many companies consider adopting one or another system, some of them adopt a hybrid process with the goal of taking the best of each system and generate superior performance. The purpose of this research is to investigate how companies inserted in markets characterized by sales peak at the end of the month (hockey-stick phenomenon), and low accuracy in demand forecasts, are applying their production planning strategies and their ERP. Low forecast accuracy causes a problem in applying pushed strategies as it requires a high safety stock associated. Conversely, the sales peak hinders the adoption of a purely pull strategy since the system does not have the necessary stability. To meet this goal, six case studies were conducted and the results found and supported by the theory suggest the emergence of an effective hybrid model for planning in the environment studied as well as the appearance of a DSS (Decision Support System). Another contribution of this research was to identify in one of the cases a company that managed to effectively tackle the phenomenon in the root cause, neutralizing its effects.
 
AVISO - A consulta a este documento fica condicionada na aceitação das seguintes condições de uso:
Este trabalho é somente para uso privado de atividades de pesquisa e ensino. Não é autorizada sua reprodução para quaisquer fins lucrativos. Esta reserva de direitos abrange a todos os dados do documento bem como seu conteúdo. Na utilização ou citação de partes do documento é obrigatório mencionar nome da pessoa autora do trabalho.
Data de Publicação
2016-07-19
 
AVISO: O material descrito abaixo refere-se a trabalhos decorrentes desta tese ou dissertação. O conteúdo desses trabalhos é de inteira responsabilidade do autor da tese ou dissertação.
  • BASSO, R. G., MORAES, R. O., e LAURINDO, F. J. B. OPTIMIZATION OF A DSS COLLABORATION SYSTEM DEALING WITH INFORMATION OVERLOAD. In ICPR 2013 - 22nd International Conference on Production Research, Foz do Iguaçu, 2013. Proceedings of 10th CONTECSI International ICPR 2013 - 22nd International Conference on Production Research.Curitiba : IFPR, 2013.
  • BASSO, RENATO GIOIELLI, e LAURINDO, FERNANDO JOSÉ BARBIN. TPM IN THE DIGITAL ERA - THE EVOLUTION OF TPM AND THE USE OF INFORMATION TECHNOLOGY [doi:10.5748/9788599693094-10CONTECSI/RF-493]. In 10th CONTECSI International Conference on Information Systems and Technology Management, Sao Paulo. Proceedings of 10th CONTECSI International Conference on Information Systems and Technology Management.Sao Paulo : TECSI, 2013.
Todos os direitos da tese/dissertação são de seus autores
CeTI-SC/STI
Biblioteca Digital de Teses e Dissertações da USP. Copyright © 2001-2024. Todos os direitos reservados.