Disertación de Maestría
DOI
https://doi.org/10.11606/D.3.2009.tde-13072009-172614
Documento
Autor
Nombre completo
Guilherme Barroso Mainieri
Dirección Electrónica
Instituto/Escuela/Facultad
Área de Conocimiento
Fecha de Defensa
Publicación
São Paulo, 2009
Director
Tribunal
Ronconi, Débora Pretti (Presidente)
Pureza, Vitória Maria Miranda
Santoro, Miguel Cezar
Título en portugués
Heurísticas para a minimização do atraso total no ambiente flowshop com múltiplos processadores.
Palabras clave en portugués
Heurística
Pesquisa operacional
Programação da produção
Scheduling
Sequenciação da produção
Resumen en portugués
Neste trabalho será estudado um ambiente de produção que é freqüentemente encontrado na prática: o flowshop com múltiplos processadores. No caso estudado existem estágios em série e em cada estágio existe um número de máquinas idênticas em paralelo. Todas as tarefas devem ser processadas por todos os estágios. O objetivo é minimizar o atraso das tarefas. Primeiramente o problema foi abordado através de um método que programa as tarefas por estágio e em ordem direta, ou seja, do primeiro para o último estágio. Em seguida, foram desenvolvidas duas novas regras que utilizam o mesmo método de programação, porém consideram o ambiente como uma série de problemas de máquinas em paralelo. Uma das regras desenvolvidas tem como característica principal considerar estados futuros do sistema. Também foi desenvolvido um novo método de programação em ordem inversa, no qual as tarefas são programadas do último para o primeiro estágio. Este método apresenta melhor desempenho se comparado com o método de programação em ordem inversa da literatura. Por último foi desenvolvido um método de programação com foco no estágio gargalo, visto que este estágio pode impedir um bom fluxo das tarefas pelo sistema e resultar em uma conclusão tardia das mesmas. Este método é mais simples, rápido e tem resultados competitivos frente ao método com foco no gargalo da literatura.
Título en inglés
Heuristics for the total tardiness minimization in flexible flow shops.
Palabras clave en inglés
Flexible flow shop
Heuristic
Scheduling
Tardiness
Resumen en inglés
This work considers a production environment that is frequently found in practice: the flexible flowshop. In the case studied, there are stages in series and in each stage there are a number of identical parallel machines. All jobs must be processed by all stages. The objective is to minimize the tardiness of jobs. First the problem was addressed by a method in which jobs are schedule forward, that is, from first to last stage. Two new rules were developed using this same method, but considering the environment as a series of parallel machines problems. One of the rules is able to consider future states of the system. It was also developed a new method in which jobs are scheduled backward, i.e., from last to first stage. This method shows better performance compared to the literature method. At last, it was developed a method that focus on the bottleneck stage scheduling (since this stage may prevent a good flow of jobs throughout the system and result in late completions). This method is simpler, faster and competitive next to the literature method.
 
ADVERTENCIA - La consulta de este documento queda condicionada a la aceptación de las siguientes condiciones de uso:
Este documento es únicamente para usos privados enmarcados en actividades de investigación y docencia. No se autoriza su reproducción con finalidades de lucro. Esta reserva de derechos afecta tanto los datos del documento como a sus contenidos. En la utilización o cita de partes del documento es obligado indicar el nombre de la persona autora.
Fecha de Publicación
2009-08-18
 
ADVERTENCIA: El material descrito abajo se refiere a los trabajos derivados de esta tesis o disertación. El contenido de estos documentos es responsabilidad del autor de la tesis o disertación.
  • MAINIERI, G., and RONCONI, D. P. New heuristics for total tardiness minimization in a flexible flowshop [doi:10.1007/s11590-012-0448-x]. Optimization Letters [online], 2013, vol. 7, p. 665-684.
  • MAINIERI, G., e RONCONI, D. P. Regras de despacho para a minimização do atraso total no ambiente flowshop flexível [doi:10.1590/S0104-530X2010000400004]. Gestão & Produção (UFSCAR. Impresso) [online], 2010, vol. 17, p. 683-692.
  • MAINIERI, G., e RONCONI, D. P. UMA HEURÍSTICA PARA A MINIMIZAÇÃO DO ATRASO TOTAL NO AMBIENTE FLOWSHOP FLEXÍVEL. In XL Simposio Brasileiro de Pesquisa Operacional, João Pessoa, 2008. XL Simposio Brasileiro de Pesquisa Operacional. : SOBRAPO, 2008.
  • RONCONI, D. P., and MAINIERI, G. A Dispatching rule-based approach for total tardiness minimization in a flexible flowshop. In International Symposium on Mathematical Programming, Chicago, 2009. International Symposium on Mathematical Programming. : Mathematical Programming Society, 2009. Abstract.
Todos los derechos de la tesis/disertación pertenecen a los autores
CeTI-SC/STI
Biblioteca Digital de Tesis y Disertaciones de la USP. Copyright © 2001-2024. Todos los derechos reservados.