• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Master's Dissertation
DOI
https://doi.org/10.11606/D.3.2006.tde-13032007-162724
Document
Author
Full name
Márcio Seiti Kawamura
E-mail
Institute/School/College
Knowledge Area
Date of Defense
Published
São Paulo, 2006
Supervisor
Committee
Ronconi, Débora Pretti (President)
Santoro, Miguel Cezar
Toledo, Franklina Maria Bragion de
Title in Portuguese
Aplicação do método branch-and-bound na programação de tarefas em uma única máquina com data de entrega comum sob penalidades de adiantamento e atraso.
Keywords in Portuguese
Branch-and-bound
Pesquisa operacional
Programação de produção
Abstract in Portuguese
O objetivo desse trabalho é o de estudar o problema de programação de tarefas num ambiente produtivo com uma única máquina com data comum de entrega. Nesse caso, as tarefas, depois de processadas uma única vez na máquina, devem ser entregues em uma data comum e sofrem penalidades de adiantamento e de atraso conforme o instante em que são completadas. Na prática, esse problema é encontrado em casos de pedidos de lotes de produtos com data de entrega comum préespecificada, embarques para exportação e material químico ou misturas que têm vida média de curta duração. Problemas desse tipo são NP-hard (Hall, Kubiak & Sethi, 1991; Hoogeven & van de Velde, 1991), sendo comumente tratados na literatura através de heurísticas e meta-heurísticas. Visto não ser de nosso conhecimento a existência na literatura de tratamento desse problema através de métodos exatos, propôs-se a utilização de um algoritmo do tipo branch-and-bound para obtenção da solução ótima do problema que minimize a soma das penalidades de adiantamento e de atraso. No desenvolvimento do algoritmo, a utilização de propriedades do problema foi importante na elaboração de limitantes inferiores e regras de dominância que melhoraram a eficiência do modelo. Os experimentos realizados avaliaram o desempenho de diferentes critérios elaborados, como escolha do nó pai, limitante inferior, ordem de execução das estratégias e ordem de construção da seqüência. Os resultados obtidos mostraram-se robustos quando comparados com o benchmark da literatura e revelaram o bom desempenho do modelo para problemas de pequeno porte, superando o desempenho de programas de otimização comerciais.
Title in English
Branch-and-bound method application in a single machine earliness/tardiness scheduling problem with a common due date.
Keywords in English
Brand-and-bound
Operations research
Scheduling
Abstract in English
The objective of this work is to study the single-machine scheduling problem with a common due date. In this case, jobs, after be processed only once in the machine, must be delivered in a common due date and they are penalized of earliness or tardiness according to their completion time. This problem is found in cases of batch production with prespecified common due date, exportation shipping and chemical material that has short half-life period. This kind of problem is NP-hard (Hall, Kubiak & Sethi, 1991; Hoogeven & van de Velde, 1991) and it has been treated in the literature by heuristics and meta-heuristics. Not having knowledge about previous treatment by exact methods in the literature, it was proposed the implementation of a branch-and-bound algorithm to obtain the optimal solution that minimizes the total weighted earliness and tardiness penalties. In the development of the algorithm, the utilization of problem properties was important to the elaboration of lower bounds and pruning rules that have enhanced the efficiency of the model. The realized tests have evaluated the performance of different criteria, like the choice of father node, lower bound, strategy execution order and sequence construction order. The obtained results have demonstrated robustness comparing to benchmark and they have revealed the good working of the model for small problems, overcoming optimization software performance.
 
WARNING - Viewing this document is conditioned on your acceptance of the following terms of use:
This document is only for private use for research and teaching activities. Reproduction for commercial use is forbidden. This rights cover the whole data about this document as well as its contents. Any uses or copies of this document in whole or in part must include the author's name.
FichaCatalografica.pdf (12.04 Kbytes)
teseMarcioKawamura.pdf (493.07 Kbytes)
Publishing Date
2007-04-03
 
WARNING: Learn what derived works are clicking here.
All rights of the thesis/dissertation are from the authors
CeTI-SC/STI
Digital Library of Theses and Dissertations of USP. Copyright © 2001-2024. All rights reserved.