Disertación de Maestría
DOI
https://doi.org/10.11606/D.3.2007.tde-27072007-152858
Documento
Autor
Nombre completo
Carlos Augusto Dornellas do Nascimento
Dirección Electrónica
Instituto/Escuela/Facultad
Área de Conocimiento
Fecha de Defensa
Publicación
São Paulo, 2007
Director
Tribunal
Andrade, Bernardo Luís Rodrigues de (Presidente)
Biazzi, Jorge Luiz de
Sabbag, Paulo Yazigi
Título en portugués
Gerenciamento de prazos: uma revisão crítica das técnicas em uso em empreendimentos em regime EPC.
Palabras clave en portugués
Administração de projetos
Gestão de prazos
Método da corrente crítica
Método de Monte Carlo
Método do caminho crítico
Resumen en portugués
O segmento de Consultoria em Engenharia, ao lado das Universidades e Centros de Pesquisas, é um dos pilares do desenvolvimento científico-tecnológico do país e é considerado um dos responsáveis pela otimização de investimentos, redução dos prazos e dos custos de implantação de empreendimentos públicos e privados, industrial ou de infra-estrutura. Atualmente, esses empreendimentos vêm passando por modificações significativas, exigindo cada vez um melhor desempenho de seus contratados, tanto nos aspectos de qualidade, desempenho, prazo e custos, quanto nos aspectos associados aos riscos contratuais, pois tornaram -se freqüentes contratações nas modalidades EPC (engineering, procurement, construction) e "turn-key". Neste novo cenário, as organizações precisam ser mais competitivas para sobreviverem às condições impostas pelo mercado, e, neste novo contexto, o gerenciamento de prazos tem-se tornado um fator crítico de sucesso. Esta dissertação desenvolve uma extensa revisão das técnicas de gerenciamento de prazos, com ênfase na etapa de programação, e uma análise comparativa das principais técnicas utilizadas no gerenciamento de projetos. Para isto, tomou-se como referência o caso de um projeto real, contratado mediante a modalidade EPC, em desenvolvimento por uma Empresa de Consultoria em Engenharia. Foi realizada a comparação entre os Métodos do Caminho Crítico, Corrente Crítica, Análises Probabilísticas e de Monte Carlo, abordando a aplicabilidade dessas técnicas neste caso. Ao final é feita uma síntese dos principais resultados alcançados, bem como dos requisitos demandados na aplicação de cada uma destas técnicas.
Título en inglés
Time management: a critical review of the techniques used in EPC projects.
Palabras clave en inglés
Project management
The critical chain method
The critical path method
The Monte Carlo method
Time management
Resumen en inglés
The segment of Consultancy in Engineering, as well as the Universities and the Research Centers are some of the pillars of the scientific -technological development in the country and they have been responsible for optimizing the investments, reducing the deadlines and the costs of project implementation in the public and private sectors, along with the industrial and infra-structure sectors. Nowadays, these projects have been going through major changes, which have demanded better performances from those who are contracted, in areas such as the quality control, performa nces, time and costs, as well as the contract risks, which more often than ever, have fallen into the EPC category (engineering, procurement, and construction) and the 'turn-key' category. In this new scenario, companies need to be more competitive to live through the conditions imposed by the market, and, in this new context, time management has turned into a critical success factor. This dissertation develops an extensive review of the time management techniques focusing on scheduling and also a comparative analysis of the most important techniques used in Project Management. To do that, a real project was created as reference case in which the EPC category was defined and was developed by an Engineering Consultancy. A comparison among The Critical Path Method and The Critical Chain, Probability Analysis Method and The Monte Carlo Method was made, and it approached the applicability of these techniques in this case. At the end, there is a summary of the most important outcomes, as well as the necessary conditions to apply each of these techniques.
 
ADVERTENCIA - La consulta de este documento queda condicionada a la aceptación de las siguientes condiciones de uso:
Este documento es únicamente para usos privados enmarcados en actividades de investigación y docencia. No se autoriza su reproducción con finalidades de lucro. Esta reserva de derechos afecta tanto los datos del documento como a sus contenidos. En la utilización o cita de partes del documento es obligado indicar el nombre de la persona autora.
Fecha de Publicación
2007-08-24
 
ADVERTENCIA: Aprenda que son los trabajos derivados haciendo clic aquí.