• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Mémoire de Maîtrise
DOI
https://doi.org/10.11606/D.3.2012.tde-13062013-170706
Document
Auteur
Nom complet
Victor Cavinato Moura
Adresse Mail
Unité de l'USP
Domain de Connaissance
Date de Soutenance
Editeur
São Paulo, 2012
Directeur
Jury
Mendes, André Bergsten (Président)
Arenales, Marcos Nereu
Brinati, Marco Antônio
Titre en portugais
Programação de frota de embarcações de lançamento de dutos.
Mots-clés en portugais
Apoio marítimo offshore
Heurísticas
Programação de veículos
Programação Linear Inteira Mista
Relaxação Lagrangiana
Resumé en portugais
A presente pesquisa considera o problema de programação de uma frota de embarcações de lançamentos de dutos, conhecidas como Pipe Layer Support Vessel (PLSVs), as quais fazem parte da frota de apoio marítimo de uma operação offshore. As embarcações do tipo PLSVs são responsáveis pelas tarefas de lançamento de dutos submarinos, que escoam a produção dos poços de petróleo, e pela interligação destes dutos à infraestrutura submarina. A programação da frota deve atender uma demanda de serviço conhecida, em um horizonte de médio prazo, respeitando restrições operacionais, visando minimizar o atraso ponderado total das tarefas ou evitar que existam atrasos. Foi desenvolvido um método para estimar o valor da solução ótima do problema, baseado na técnica de relaxação Lagrangiana, e um conjunto de heurísticas para gerar soluções viáveis para o problema.
Titre en anglais
Fleet scheduling of pipe layer vessels.
Mots-clés en anglais
Heuristics
Lagrangean relaxation
Mixed Integer Linear Programming
Offshore support vessels
Vehicle scheduling
Resumé en anglais
This research considers the problem of scheduling a fleet of specialized vessels used for launching pipes and connecting them to the subsea infrastructure, in an offshore oil production environment. The Pipe Layer Support Vessels (PLSV) must be scheduled such that the demand is fully attended within the planning horizon, observing other operational constraints, with the purpose of minimizing the total weighted tardiness. The solution method is based on constructive and local search heuristics. Bounds on the optimal solution were derived by a Lagrangean relaxation algorithm.
 
AVERTISSEMENT - Regarde ce document est soumise à votre acceptation des conditions d'utilisation suivantes:
Ce document est uniquement à des fins privées pour la recherche et l'enseignement. Reproduction à des fins commerciales est interdite. Cette droits couvrent l'ensemble des données sur ce document ainsi que son contenu. Toute utilisation ou de copie de ce document, en totalité ou en partie, doit inclure le nom de l'auteur.
Date de Publication
2013-06-20
 
AVERTISSEMENT: Apprenez ce que sont des œvres dérivées cliquant ici.
Tous droits de la thèse/dissertation appartiennent aux auteurs
CeTI-SC/STI
Bibliothèque Numérique de Thèses et Mémoires de l'USP. Copyright © 2001-2024. Tous droits réservés.