• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Mémoire de Maîtrise
DOI
https://doi.org/10.11606/D.3.2007.tde-03082007-174606
Document
Auteur
Nom complet
Luiz Henrique Tadeu Ribeiro Pedroso
Adresse Mail
Unité de l'USP
Domain de Connaissance
Date de Soutenance
Editeur
São Paulo, 2007
Directeur
Jury
Andrade, Bernardo Luís Rodrigues de (Président)
Assis, Sérgio Luiz de Oliveira
Martins, Marcelo Ramos
Titre en portugais
Uma sistemática para a identificação, análise qualitativa e análise quantitativa dos riscos em projetos.
Mots-clés en portugais
Análise de decisão
Gerenciamento de riscos
Riscos em projetos
Simulação de Monte-Carlo
Resumé en portugais
Identificar o maior número possível de riscos nos projetos, priorizá-los e quantificar seus impactos, são os processos centrais para o um bom gerenciamento dos riscos nos projetos. A execução destes processos permite determinar o nível de confiança que existe para se atingir os objetivos do projeto. Sendo assim o resultado deste trabalho foi apresentar uma sistemática visando medir o nível de confiança nas várias decisões que são tomadas durante a vida do projeto e também uma sistemática abrangente de identificação, análise qualitativa (priorização) e análise quantitativa dos riscos. Como principal ferramenta nestas sistemáticas utilizou-se a Simulação de Monte-Carlo para determinar o nível de confiança nas decisões tomadas. Estas sistemáticas foram testadas em várias empresas dos setores de Informática, Petroquímica e Bens de Capital, sendo que alguns destes modelos foram utilizados para demonstrar sua aplicação. Um dos resultados importantes obtidos foi a determinação do valor do fundo de contingência para os projetos de bens de capital que estão sujeitos à auditoria do IPA-Independent Project Analysis.
Titre en anglais
The processes to risk identification, qualitative and quantitative risk analysis in the projects.
Mots-clés en anglais
Decision's analysis
Monte-Carlo's simulation
Project risks
Risk management
Resumé en anglais
To identify the largest possible number of risks in the projects, to prioritize and quantify their impact on project's objectives, play a key processes for a risk management success. The execution of these processes will allow to measure the confidence level to reach the project´s objectives. As a result of this work was developed a systematic to measure the confidence level of decisions that are taken during project life-cycle and also developed a systematic including identification, qualitative analysis (ranking) and quantitative analysis of the risks. The main tool for these systematic is Monte-Carlo's Simulation to determine the confidence level in the decisions takings. These systematic were tested in several companies in the sectors of Computer Science, Petroleum and Capital's Asset whose models were used to demonstrate its application. One of the important results obtained with these systematic was the determination of the contingency fund to the projects that are audited by IPA-Independent Project Analysis.
 
AVERTISSEMENT - Regarde ce document est soumise à votre acceptation des conditions d'utilisation suivantes:
Ce document est uniquement à des fins privées pour la recherche et l'enseignement. Reproduction à des fins commerciales est interdite. Cette droits couvrent l'ensemble des données sur ce document ainsi que son contenu. Toute utilisation ou de copie de ce document, en totalité ou en partie, doit inclure le nom de l'auteur.
TeseCompleta.pdf (2.39 Mbytes)
Date de Publication
2007-08-29
 
AVERTISSEMENT: Apprenez ce que sont des œvres dérivées cliquant ici.
Tous droits de la thèse/dissertation appartiennent aux auteurs
CeTI-SC/STI
Bibliothèque Numérique de Thèses et Mémoires de l'USP. Copyright © 2001-2024. Tous droits réservés.