Mémoire de Maîtrise
DOI
https://doi.org/10.11606/D.3.2008.tde-29012009-110255
Document
Auteur
Nom complet
Dalmo de Souza Amorim Junior
Adresse Mail
Unité de l'USP
Domain de Connaissance
Date de Soutenance
Editeur
São Paulo, 2008
Directeur
Jury
Iramina, Wilson Siguemasa (Président)
Azevedo, Ricardo Cabral de
Miura, Kazuo
Titre en portugais
Metodologia para a redução de custos na perfuração de poços de petróleo e gás.
Mots-clés en portugais
Custo econômico (redução; projeto)
Gás natural
Perfuração
Petróleo
Resumé en portugais
A programação bem-sucedida das trocas das brocas de perfuração tem estado mais ligada à experiência do que a um método formal que permita a tomada de decisões acertadas. Retirar uma broca do poço depois do momento correto implica em risco de acidentes, baixo rendimento e custo operacional crescente. Retirar antes do momento correto implica perda de rendimento potencial, inclusive porque a vida útil remanescente normalmente é insuficiente para justificar nova manobra de descida. Nesta dissertação, são discutidos critérios de definição do momento exato de retirada da broca do poço e, adicionalmente, é sugerida uma metodologia de redução de custos de perfuração, realizada através de um padrão de análise de custos métricos de perfuração e desempenhos operacionais de poços anteriormente perfurados na mesma região ou campo. Esta análise visa definir as brocas a serem utilizadas nos poços vindouros tendo como critério a minimização do custo métrico de perfuração, bem como antecipar o custo mais provável do poço a ser perfurado. O uso de recordes como metas contém riscos, uma vez que resultados pontuais muito favoráveis dependem de uma conjunção de fatores, como litologia favorável, fluido de perfuração adequado e disponibilidade de energia mecânica e hidráulica que podem não se repetir em outros poços, mas precisam ser detectados e analisados adequadamente. O ideal é a execucão da perfuração até à profundidade final com o menor custo operacional possível, rápido início da produção, evitando acidentes pessoais ou danos ao meio-ambiente, e sem gerar problemas para o futuro dos poços do campo, como colisão de trajetórias ou indução de desgastes nos revestimentos (DYER, 1984). Em tempos de descoberta dos campos conhecidos como Pré-Sal, a realização dos poços em menor prazo e ao menor custo poderá antecipar à sociedade brasileira recursos relevantes para o seu desenvolvimento.
Titre en anglais
Methodology for reduction of costs in drilling operations for oil and gas.
Mots-clés en anglais
Drilling
Economic cost
Natural gas
Oil
Resumé en anglais
The success of a Bit Program of a well has been more related to personal experience than to a formal method that leads to the best decisions. Pulling a bit out the hole after the correct moment implies in risks of accidents, in working with low performances or in higher operational costs. Pulling the bit before the correct moment implies in loss of potential performance, once the remaining life of the bit usually is insufficient to justify the cost of a trip to rerun it. In this thesis we discuss criteria of how to define the correct moment to pull a bit out of the hole, optimizing costs, avoiding accidents and concluding the well in the shortest time. Additionally it is suggested a method to reduce drilling costs using of a pattern to analyze costs and performances of wells previously drilled in the same area or field. This analysis intends to define the bits to be used in the next wells, having as main criteria the selection of the bits that lead to the lowest cost per meter. Usage of field records as targets contains risks, once these results are many times a lucky conjunction of factors as favorable lithology, adequate drilling fluid properties, availability of mechanical and hydraulic energy at the bit, among others, which might not be repeated at the same time in other wells, even though these records are important and must be adequately detected and analyzed. The ideal is to drill fast, without structural or operational problems to the final depth at the lowest cost, putting well to produce as soon as possible, without personal or environmental accidents, collision to other existing wells, or inducing casing wear (DYER, 1984). In the present time, when the discoveries of the fields known as Pre-Salt are being made, the anticipation of drilling and producing these wells at minimum cost might anticipate to the society important resources for its development.
 
AVERTISSEMENT - Regarde ce document est soumise à votre acceptation des conditions d'utilisation suivantes:
Ce document est uniquement à des fins privées pour la recherche et l'enseignement. Reproduction à des fins commerciales est interdite. Cette droits couvrent l'ensemble des données sur ce document ainsi que son contenu. Toute utilisation ou de copie de ce document, en totalité ou en partie, doit inclure le nom de l'auteur.
Date de Publication
2009-02-06
 
AVERTISSEMENT: Apprenez ce que sont des œvres dérivées cliquant ici.
Tous droits de la thèse/dissertation appartiennent aux auteurs
CeTI-SC/STI
Bibliothèque Numérique de Thèses et Mémoires de l'USP. Copyright © 2001-2024. Tous droits réservés.