Mémoire de Maîtrise
DOI
https://doi.org/10.11606/D.3.2018.tde-18092018-081939
Document
Auteur
Nom complet
Ana Carla de Melo Moreira Campelo
Adresse Mail
Unité de l'USP
Domain de Connaissance
Date de Soutenance
Editeur
São Paulo, 2018
Directeur
Jury
Marin, Tatiane (Président)
Lima, Gabriel Alves da Costa
Nader, Alizeibek Saleimen
Titre en portugais
Estimativa de indicadores de desempenho da lavra para integração entre sistema de despacho e programação diária.
Mots-clés en portugais
Controle da produção
Indicadores de produtividade
Mineração
Programação da produção
Resumé en portugais
Foi observado que para execução do planejamento diário, no qual há o envolvimento de diversas equipes como operação, perfuração e atividade de apoio, despende-se muito tempo para determinação dos alvos de produção. Em contrapartida, a maior parte das minas de grande porte utilizam sistemas de gerenciamento de equipamentos que são capazes de fornecer dados para tratamento e transformação em informação que poderiam auxiliar nesse planejamento, no entanto na maioria dos casos esses dados são pouco conhecidos e utilizados. Este estudo faz a estimativa de indicadores de desempenho de lavra, oriundos do banco de dados do sistema de Despacho, que podem ser utilizados no planejamento diário (tipo Line-Up aplicado na mina do Sossego, em Canaã dos Carajás - Pará). Metodologicamente, para atingir o proposto, foram realizadas as etapas de análise do Banco de Dados (BD) do sistema de Despacho, descrição do Line-Up da mina do Sossego, análise do contexto operacional entre os dois sistemas: Line-Up e Despacho, estimativa dos indicadores e definição de um cálculo de aderência ao Line-Up. Esse estudo demostra que a partir da coleta e sistematização dos dados é possível tornar as informações contidas no BD do Despacho mais conhecidas e utilizadas na programação diária, permitindo que a utilização dessas informações auxilie na gestão do planejamento de curto prazo, reduzindo o tempo de execução da programação diária e tornando o processo de avaliação da aderência ao Line-Up mais rápido e menos subjetivo. Os dados utilizados para esse estudo são do banco de dados do sistema de despacho da Mina do Sossego (local de exemplo de aplicação).
Titre en anglais
Estimation of mining performance indicators for integration between dispatch system and daily schedule.
Mots-clés en anglais
Adherence calculation
Database
Dispatch system
Line-up
Short-term mine plan
Resumé en anglais
Daily planning execution, which calls for several teams such as operation, drilling and support to be engaged, has been observed to be a rather time-consuming activity in order for production targets to be determined. On the other hand, most of large-size mine sites make use of equipment management systems capable of providing data to be treated and eventually made into information that may assist such planning efforts. However, such data are mostly scarcely known and used. This paper provides the estimation of mine performance indicators stemming from Dispatch system database that may come in handy for daily planning efforts (Line-Up type, applied to Sossego mine site, in Canaã dos Carajás, state of Pará, Brazil). Methodologically speaking, in order for proposed outcomes to be attained, Dispatch system database has been analyzed, Sossego mine site Line-Up has been described, operational context underlying both systems, Line-Up and Dispatch, has been analyzed, indicators have been estimated, and a Line-Up adherence calculation has been defined. The present paper indicates that, based on data gathering and systematization, information from Dispatch database can be made well known and used during daily scheduling efforts, thus allowing for such information to assist short-term plan management, daily scheduling performance timeframe to be cut down on, and Line-Up adherence assessment process to be faster and less subjective. Data used for this paper come from Sossego mine site dispatch system database (example of local application).
 
AVERTISSEMENT - Regarde ce document est soumise à votre acceptation des conditions d'utilisation suivantes:
Ce document est uniquement à des fins privées pour la recherche et l'enseignement. Reproduction à des fins commerciales est interdite. Cette droits couvrent l'ensemble des données sur ce document ainsi que son contenu. Toute utilisation ou de copie de ce document, en totalité ou en partie, doit inclure le nom de l'auteur.
Date de Publication
2018-09-18
 
AVERTISSEMENT: Apprenez ce que sont des œvres dérivées cliquant ici.
Tous droits de la thèse/dissertation appartiennent aux auteurs
CeTI-SC/STI
Bibliothèque Numérique de Thèses et Mémoires de l'USP. Copyright © 2001-2024. Tous droits réservés.