Disertación de Maestría
DOI
https://doi.org/10.11606/D.18.2015.tde-28092015-085507
Documento
Autor
Nombre completo
Hugo Hissashi Miyata
Instituto/Escuela/Facultad
Área de Conocimiento
Fecha de Defensa
Publicación
São Carlos, 2015
Director
Tribunal
Nagano, Marcelo Seido (Presidente)
Azzolini Júnior, Walther
Sagawa, Juliana Keiko
Título en portugués
Métodos heurísticos para minimização da duração total da programação em ambiente no-wait flow shop com políticas de manutenção-preventiva
Palabras clave en portugués
Makespan
No-wait flow shop
Heurísticas construtivas
Manutenção preventiva
Programação de operações
Resumen en portugués
O problema de programação de operações em ambiente no-wait flow shop tem sido abordado desde a década de 60. Por se tratar de um ambiente em que as tarefas devem ser processadas continuamente e sem interrupções entre uma máquina e outra, um tempo de espera entre o início da tarefa anterior e o início da tarefa atual deve ser determinado na primeira máquina. Neste sentido, uma vez que a tarefa inicia seu processamento, as máquinas devem estar disponíveis para que atendam a restrição de no-wait. Portanto, operações de manutenção preventiva são necessárias para que a programação seja atendida sem maiores problemas. Este trabalho aborda dois problemas: no-wait flow shop e no-wait flow shop com operações de manutenção preventiva. O critério de desempenho adotado foi a duração total da programação (makespan). Por meio de uma revisão de literatura, mecanismos de construção de soluções foram identificadas e classificadas e, baseando-se em tais, novos métodos heurísticos construtivos simples e compostos foram propostos para o problema no-wait flow shop e uma heurística composta foi desenvolvida considerando as operações de manutenção preventiva. Experimentações computacionais para os dois problemas foram realizadas para fins de comparação e avaliação dos métodos propostos com os métodos heurísticos construtivos da literatura. Para o problema Fm|no - wait|Cmax resultados evidenciaram que as heurísticas propostas H4GPSLLS e MH4GPSLLS superaram as heurísticas da literatura em qualidade de solução, com diferença estatisticamente significativa no nível de 5% de significância. Para o problema Fm|no - wait, m(k)|Cmax, pode-se constatar que a heurística BIHLS e as heurísticas H4GPSLLS e MH4GPSLLS apresentaram desempenho superior com diferença estatística significativa no nível de 5% de significância em comparação as heurísticas da literatura.
Título en inglés
Heuristics methods for the no-wait flow shop problem with preventive maintenance constraints and makespan minimization
Palabras clave en inglés
Constructive heuristics
Makespan
No-wait flow shop
Preventive maintenance
Scheduling
Resumen en inglés
The no-wait flow shop scheduling problem has been studied since 60's. In this environment, jobs must be processed continuously without interruption between one machine and another, and because of this, a delay between the start time of the previous job and the start time of the current job must be determined in the first machine. In this sense, since a job starts its processing, the machines must be available to respect the no-wait constraint. Therefore, preventive maintenance operations are needed. This work adresses two problems: the m machine no-wait flow shop and the m machine no-wait flow shop with preventive maintenance operations. The performance measure adopted was the makespan. By means of a literature review, mechanisms of solution construction were identified and classified. New simple and composite constructive heuristics were proposed to the no-wait flow shop problem and a new composite constructive heuristic was developed considering the preventive maintenance operations. Computational experiments and their respective analyses for both problems were carried out to compare and evaluate the performance between the proposed methods and the constructive heuristics of the literature. Regarding Fm|no - wait|Cmax problem, results show that the proposed heuristics H4GPSLLS and MH4GPSLLS outperformed the heuristics of the literature in quality of the solution and is statistically significative to 5% of significance level. To the Fm|no - wait, m(k)|Cmax problem it can be seen that the proposed heuristic BIHLS and H4GPSLLS and MH4GPSLLS outperformed the heuristics of the literature and is statistically better to 5% of significance level.
 
ADVERTENCIA - La consulta de este documento queda condicionada a la aceptación de las siguientes condiciones de uso:
Este documento es únicamente para usos privados enmarcados en actividades de investigación y docencia. No se autoriza su reproducción con finalidades de lucro. Esta reserva de derechos afecta tanto los datos del documento como a sus contenidos. En la utilización o cita de partes del documento es obligado indicar el nombre de la persona autora.
Fecha de Publicación
2015-10-02
 
ADVERTENCIA: Aprenda que son los trabajos derivados haciendo clic aquí.
Todos los derechos de la tesis/disertación pertenecen a los autores
CeTI-SC/STI
Biblioteca Digital de Tesis y Disertaciones de la USP. Copyright © 2001-2024. Todos los derechos reservados.